Loading...
Building PermitType: COMMERCIAL BLDG Subtype: NEW COMMERCIAL BLDG I Status: ISSUED Parcel No: 00566900400600 Subdivision: 005669 Fire Sprinklers: No Valuation: $632,316.00 Code Edition: 2018 Site Address: 7509 212TH ST SW EDMONDS,WA 98026-7605 Lot: 0 Lot Area: Occupancy Type: B and S1 No. Stories: 2 Zoning: BN Construction Type: VB # of Dwelling Units: 0 Scope of Work: GLACIER ENVIROMENTAL SVCS-NEW OFFICE BUILDING Applied: 11/9/2022 Issued:10/11/2024 Final: Expiration Date: 10/11/2026 Issued by: NED I WA State Contractor L & I #: GLACIES108C7 I CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT LAUREN GOLEMBIEWSKI PO BOX 1097, MUKILTEO WA (425)355-2826 LMILES@GLACIERENVIRO.COM 98275 CONTACT GLACIER ENVIRONMENTAL PO BOX 1097, MUKILTEO WA (425)355-2826 LMiles@glacierenviro.com SERVICES, INC. 98275 CONTRACTOR GLACIER ENVIRONMENTAL POB 1097, MUKILTEO WA 98275 (425)355-2826 LMILES@GLACIERENVIRO.COM SRVCINC -5709 PO BOX 1097, MUKILTEO WA OWNER DIRT HOLDINGS 98275 DESCRIPTION 7PER ACCOUNT AMOUNT PAID PAID DATE RECEIPT # TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/15/22 R24410 PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 10/9/24 R40570 PARK IMPACT FEE - COM ADMIN 001.000.345.83.000.00 $126.00 $126.00 10/9/24 R40570 PARK IMPACT FEE - NON 332.100.345.85.000.00 $3,429.95 $3,429.95 10/9/24 R40570 RESIDENTIAL SQFT PERMIT FEE - COMMERCIAL 001.000.345.83.000.00 $4,978.00 $4,978.00 10/9/24 R40570 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $4,231.30 $4,231.30 11/15/22 R24410 STAFF DESIGN REVIEW TYPE 1 001.000.345.83.200.00 $314.00 $314.00 10/9/24 R40570 STORM GFC - ALL BUT SFR UNDER 422.000.379.00.000.00 $4,048.53 $4,048.53 10/9/24 R40570 5000 TRANSP ENGINEER REVIEW - 001.000.345.83.400.00 $310.00 $310.00 10/9/24 R40570 INDEPENDENT CALC - 4.1.24 TRANSP IMPACT FEE - 112.502.345.86.000.00 $43,400.96 $43,400.96 10/9/24 R40570 INDEPENDENT CALC TRANSPORTATION IMPACT - 001.000.345.83.400.00 $126.00 $126.00 10/9/24 R40570 ADMIN - COM-MF - 4.1.24 TOTALS: $61,029.74 $61,029.74 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, October 11, 2024 1:28:13 PM 1 of 4 •MERCIAL BLDG PermitCity • • • • - •:0iBLD2022-1541 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION ELEVATION CERTIFICATE FOR INFORMATION EXIT SIGNAGE AND EMERGENCY FOR Final locations of illuminated exit signs and emergency lighting subject to field inspection LIGHTING INFORMATION by the Fire Marshal. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION LOT LINES STAKED FOR Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Printed: Friday, October 11, 2024 1:28:13 PM 2 of 4 • •:� i 1 Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. FOR INFORMATION MANUAL ENTRY OTHER CONDITION Deferred plans: FOR 1. Pre -fabricated Metal stair and location of gate INFORMATION 2. Pre -fabricated open wood Trusses 3. Design Build Elements New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch min stroke width on a contrasting background. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Special Inspections required for this permit: 1. Structural steel fabrication and erection REQUIRED SPECIAL FOR 2. Concrete construction INSPECTIONS INFORMATION 3. Soil conditions, fill placement,and density 4. Expansion bolts and threaded expansion inserts 5. Epoxy grouted Installation FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. SPECIAL INSPECTION REPORTS O Submit all special inspection reports to the City Building Official on a weekly basis. ORMATION INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" B-1 SETBACKS B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 UNDERFLR FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR Printed: Friday, October 11, 2024 1:28:13 PM 3 of 4 •MERCIAL BLDG PermitCity - • • • • Edmonds98020 1 . •. B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-5 BLDG SPECIAL Special Inspections required for this permit: INSPECTION 1. Structural steel fabrication and erection 2. Concrete construction 3. Soil conditions, fill placement,and density 4. Expansion bolts and threaded expansion inserts 5. Epoxy grouted Installation A-1 BUILDING PRECON Special Inspections required for this permit: 1. Structural steel fabrication and erection 2. Concrete construction 3. Soil conditions, fill placement,and density 4. Expansion bolts and threaded expansion inserts 5. Epoxy grouted Installation A-1 BUILDING PRECON Deferred plans: 1. Pre -fabricated Metal stair and location of gate 2. Pre -fabricated open wood Trusses 3. Design Build Elements B-4 FRAMING Deferred plans: 1. Pre -fabricated Metal stair and location of gate 2. Pre -fabricated open wood Trusses 3. Design Build Elements A-1 TESC AND MOBILIZE E-3 STRM TIGHTLINE E-4 WATER SERVICE LINE X-2 ENGINEERING FINAL Printed: Friday, October 11, 2024 1:28:13 PM 4 of 4