Building PermitType: COMMERCIAL BLDG Subtype: NEW COMMERCIAL BLDG I Status: ISSUED
Parcel No: 00566900400600
Subdivision: 005669
Fire Sprinklers: No
Valuation: $632,316.00
Code Edition: 2018
Site Address: 7509 212TH ST SW EDMONDS,WA 98026-7605
Lot: 0
Lot Area:
Occupancy Type: B and S1
No. Stories: 2
Zoning: BN
Construction Type: VB
# of Dwelling Units: 0
Scope of Work: GLACIER ENVIROMENTAL SVCS-NEW OFFICE BUILDING
Applied: 11/9/2022
Issued:10/11/2024
Final:
Expiration Date: 10/11/2026
Issued by: NED
I WA State Contractor L & I #: GLACIES108C7 I
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
LAUREN GOLEMBIEWSKI
PO BOX 1097, MUKILTEO WA
(425)355-2826
LMILES@GLACIERENVIRO.COM
98275
CONTACT
GLACIER ENVIRONMENTAL
PO BOX 1097,
MUKILTEO WA
(425)355-2826
LMiles@glacierenviro.com
SERVICES, INC.
98275
CONTRACTOR
GLACIER ENVIRONMENTAL
POB 1097, MUKILTEO WA 98275
(425)355-2826
LMILES@GLACIERENVIRO.COM
SRVCINC
-5709
PO BOX 1097,
MUKILTEO WA
OWNER
DIRT HOLDINGS
98275
DESCRIPTION
7PER
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/15/22
R24410
PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
10/9/24
R40570
PARK IMPACT FEE - COM ADMIN
001.000.345.83.000.00
$126.00
$126.00
10/9/24
R40570
PARK IMPACT FEE - NON
332.100.345.85.000.00
$3,429.95
$3,429.95
10/9/24
R40570
RESIDENTIAL SQFT
PERMIT FEE - COMMERCIAL
001.000.345.83.000.00
$4,978.00
$4,978.00
10/9/24
R40570
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$4,231.30
$4,231.30
11/15/22
R24410
STAFF DESIGN REVIEW TYPE 1
001.000.345.83.200.00
$314.00
$314.00
10/9/24
R40570
STORM GFC - ALL BUT SFR UNDER
422.000.379.00.000.00
$4,048.53
$4,048.53
10/9/24
R40570
5000
TRANSP ENGINEER REVIEW -
001.000.345.83.400.00
$310.00
$310.00
10/9/24
R40570
INDEPENDENT CALC - 4.1.24
TRANSP IMPACT FEE -
112.502.345.86.000.00
$43,400.96
$43,400.96
10/9/24
R40570
INDEPENDENT CALC
TRANSPORTATION IMPACT -
001.000.345.83.400.00
$126.00
$126.00
10/9/24
R40570
ADMIN - COM-MF - 4.1.24
TOTALS:
$61,029.74
$61,029.74
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Friday, October 11, 2024 1:28:13 PM 1 of 4
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2022-1541
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
ELEVATION CERTIFICATE
FOR
INFORMATION
EXIT SIGNAGE AND EMERGENCY
FOR
Final locations of illuminated exit signs and emergency lighting subject to field inspection
LIGHTING
INFORMATION
by the Fire Marshal.
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
HOSE BIBBS
FOR
Hose Bibbs are required to have a permanently affixed anti -siphon device installed.
NFORMATION
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Printed: Friday, October 11, 2024 1:28:13 PM 2 of 4
• •:� i 1
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
FOR
INFORMATION
MANUAL ENTRY
OTHER CONDITION
Deferred plans:
FOR
1. Pre -fabricated Metal stair and location of gate
INFORMATION
2. Pre -fabricated open wood Trusses
3. Design Build Elements
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly visible from the street
POST ADDRESS
FOR
or road fronting the property. Address numbers shall be Arabic numerals or alphabet
INFORMATION
letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch
min stroke width on a contrasting background.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
Special Inspections required for this permit:
1. Structural steel fabrication and erection
REQUIRED SPECIAL
FOR
2. Concrete construction
INSPECTIONS
INFORMATION
3. Soil conditions, fill placement,and density
4. Expansion bolts and threaded expansion inserts
5. Epoxy grouted Installation
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
O
Submit all special inspection reports to the City Building Official on a weekly basis.
ORMATION
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL"
B-1 SETBACKS
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 UNDERFLR FRAMING
B-4 HEIGHT VERIFICATION
B-4 INTERIOR SHEAR
Printed: Friday, October 11, 2024 1:28:13 PM 3 of 4
•MERCIAL
BLDG PermitCity
-
•
• • •
Edmonds98020 1
.
•.
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-5 BLDG SPECIAL
Special Inspections required for this permit:
INSPECTION
1. Structural steel fabrication and erection
2. Concrete construction
3. Soil conditions, fill placement,and density
4. Expansion bolts and threaded expansion inserts
5. Epoxy grouted Installation
A-1 BUILDING PRECON
Special Inspections required for this permit:
1. Structural steel fabrication and erection
2. Concrete construction
3. Soil conditions, fill placement,and density
4. Expansion bolts and threaded expansion inserts
5. Epoxy grouted Installation
A-1 BUILDING PRECON
Deferred plans:
1. Pre -fabricated Metal stair and location of gate
2. Pre -fabricated open wood Trusses
3. Design Build Elements
B-4 FRAMING
Deferred plans:
1. Pre -fabricated Metal stair and location of gate
2. Pre -fabricated open wood Trusses
3. Design Build Elements
A-1 TESC AND MOBILIZE
E-3 STRM TIGHTLINE
E-4 WATER SERVICE LINE
X-2 ENGINEERING FINAL