BLD2024-1342_Supplementals_Plumbing_Fixture_Counts_10.10.2024_2.48.02_PM_4553347MyBuildingPermit.com
Jurisdiction: Edmonds
Project Name: Hanby Construction
Application ID: 1560141
Supplemental Name: Plumbing Fixture Counts
Enter the # of plumbing fixtures being
- installed, altered, repaired, added or relocated
Water Heater
- Specify GAS or ELECTRIC
- QTY #
electric 1
Plumbing fixture on 1 trap or set of fixtures on 1 trap
- Include sinks, toilets, tubs, showers, etc.
- QTY #
4
Drains w/in footprint of building
- Rainwater systems, roof deck drains, etc.
-QTY#
Re -pipe
- Drain, vent, or water piping for each fixture served
-QTY#
Water service line
- Replacement or repair
- QTY #
1
Water service line
- New
-QTY#
Water treating equipment (water softener)
- QTY #
Backflow protective device
- 2" and smaller
- QTY #
Backflow protective device
- Over 2"
- QTY #
Graywater or reclaimed water system
- In addition to fixtures
- QTY #
Non -grease waste pre-treatment interceptor
- Oil/water separator
-QTY#
Medical gas piping system
- QTY #
Grease trap
- HGI inside building
- QTY #
Gravity grease interceptor
- GGI
- QTY #
Gas piping outlets
- QTY #