Loading...
BLD2024-1342_Supplementals_Plumbing_Fixture_Counts_10.10.2024_2.48.02_PM_4553347MyBuildingPermit.com Jurisdiction: Edmonds Project Name: Hanby Construction Application ID: 1560141 Supplemental Name: Plumbing Fixture Counts Enter the # of plumbing fixtures being - installed, altered, repaired, added or relocated Water Heater - Specify GAS or ELECTRIC - QTY # electric 1 Plumbing fixture on 1 trap or set of fixtures on 1 trap - Include sinks, toilets, tubs, showers, etc. - QTY # 4 Drains w/in footprint of building - Rainwater systems, roof deck drains, etc. -QTY# Re -pipe - Drain, vent, or water piping for each fixture served -QTY# Water service line - Replacement or repair - QTY # 1 Water service line - New -QTY# Water treating equipment (water softener) - QTY # Backflow protective device - 2" and smaller - QTY # Backflow protective device - Over 2" - QTY # Graywater or reclaimed water system - In addition to fixtures - QTY # Non -grease waste pre-treatment interceptor - Oil/water separator -QTY# Medical gas piping system - QTY # Grease trap - HGI inside building - QTY # Gravity grease interceptor - GGI - QTY # Gas piping outlets - QTY #