Building PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED
Parcel No: 00682300130500 Site Address: 546 ALDER ST 305 EDMONDS,WA 98020-3441
Subdivision: 006823, 009546, 004342 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PLUMBING -WATER HEATER
Applied: 10/15/2024
Issued:10/16/2024
Final:
Expiration Date: 10/16/2026
Issued by: NED
I WA State Contractor L & I #: INNOVPC792PL I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
DARREN SPEAKES
6110 75TH DR NE, MARYSVILLE
(425)931-6689
INSPIREWITHIPC@GMAIL.COM
WA 98270
CONTACT
INNOVATIVE PLUMBING
6110 75TH DR NE, MARYSVILLE
(425)931-6689
inspirewithipc@gmail.com
CONCEPTS LLC
WA 98270
CONTRACTOR
INNOVATIVE PLUMBING
1612 81ST AVE NE, LAKE
(425)931-6689
INSPIREWITHIPC@GMAIL.COM
CONCEPTS LLC
STEVENS WA 98258
PAUL & DELBERTA
546 ALDER ST 305, EDMONDS
OWNER
DOCKENDORF
WA 98020
• ' 1111111 •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE -PER
001.000.321.99.100.00
$45.00
$45.00
10/16/24
R40726
PERMIT
PLUMBING BASE FEE
001.000.322.10.000.00
$57.00
$57.00
10/16/24
R40726
WATER HEATER - INC EXPANSION
001.000.345.83.000.00
$17.00
$17.00
10/16/24
R40726
TANK
TOTALS: $119.00
$119.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, October 16, 2024 3:31:59 PM 1 of 2
PLUMBING Permit
-
City of • • •
•: i 1 ..
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
B-3 PLUMB ROUGH IN
X-0 PLUMBING FINAL"
Printed: Wednesday, October 16, 2024 3:31:59 PM 2 of 2