24-0621 Bella Coola Engineer's Report Wood Damage at Decks - Updated (3)19011 Woodinville Snohomish Road NE Suite 100 Woodinville, WA 98072 phone: 206.407.6456 www.smithcompanystructuralengineers.com June 21, 2024 Isaiah Park Steadfast Construction 4913 70th Ave W University Place, WA 98467 RE Bella Coolc7 Condominiums 654 5h Avenue South, Edmonds, WA 98020 Engineer's Site Visit Report on Wood Domoge ot Westerly Decks Dear Isaiah: This report is an update to our June 12, 2024 report, and it supersedes that report. All changes are in red. As a condition of the repair permit, we visited the site to review the condition of the wood framing at the westerly decks. Localized failures of the plywood deck fascia have resulted in rot damaged beams and westerly plywood edges. At all decks, replace bottom plate or plates below 3 1/8 x 12 glued -laminated beams where these plates show signs of wood rot or significant staining. Specific recommendations for the deck beams are as follows. Decks are listed from left -to -right and top -down as observed from the parking lot. New beams may be Doug -fir laminating combination 24F-V4: Unit 404 North: No structural work Unit 404 West: Replace bottom plate. Office 304 North: Remove damaged wood down to sound wood at westerly end of beam. Remove and replace plywood at deck corner. Office 304 West: Replace beam due to substantial deterioration below beam hanger flange. Remove and replace plywood at deck corner. Unit 204 North: Replace beam due to substantial damage at beam at end of hanger bucket. Unit 204 West: Replace beam due to substantial damage to wood supporting and directly beam northerly beam hanger flange. Unit 403 North Unit 403 West: Office 303 North: Office 303 West: Unit 203 North Unit 203 West: No structural work No structural work No structural work No structural work No structural work No structural work Unit 402 North: Replace beam due to substantial damage at mid -span of beam. Remove and replace plywood at deck corner. Unit 402 West: Replace beam due to substantial damage full length of beam. Remove and replace plywood edge. Office 302 North: Remove and replace plywood at deck corner. Office 302 West: No structural work Unit 202 North: Replace beam due to damage at westerly end. Unit 202 West: No structural work Unit 401 North: Remove damaged wood near center of beam. No other structural work is required. Unit 401 West: No structural work Office 301 North Office 301 West: No structural work No structural work K Unit 201 North: No structural work Unit 201 West: No structural work qzt 0 UO L- ai Ul r'4 0 a IFIPL lo, ....... ... 1p At All cut edges of deck plywood should be blocked. Note that depending on how much sound wood remains at Unit 204 North and 401 North, these two beams may also require replacement. Please have us out to review the remaining sound wood at these two beams after the rotted wood is removed. Sincerely, Smith Company Structural Engineers, LLr Jo Smith, P.E, S.E., Principal