Loading...
APPROVED PLN BLD BLD2024-0473+Architectural_Plan+4.9.2024_1.19.21_PM+41857051 of 29 RECEIVED BLD2024-0473 4/11 /2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED BY PLANNING May 15 2024 STRUCTURAL ENGINEER APPROVED PLANS MUST BE ON JOB SITE LONGITUDE ONE TWENTYO ENGINEERING & DESIGN City Of Edmonds Building Department work Foundation Stabilization Address 16012 74th Place W Owner Pittman and Taylor Approved Date 5/ 3 0/ 2 0 2 4------ -------------- Building Official Do-ptarll pskaAL ------------ ------ Permit Number B L D 2 0 2 4— 0 4 7 3 Calculation Package for Foundation Stablllzatlon L120 ENGINEERING & DESIGN 1315091s'PLNE 16012 74th F1 W Edmonds, WA 98026 Project no: S230718-1XR September 2a- ; 2023 Prepared for: R&R Foundation Specialist 3409 McDougall Ave, suite 204 Everett, WA 98201 P: 425.760.5077 KIRKLAND, WA 98034-5901 CONTACT: MANS THURFJELL, PE EMAIL: MTHURFJELL@L120ENGINEERING.COM PHONE: (425) 636-3313 (425) 636-3313 L120Engineering.com 9 J Q O O Q Z --_._ - PROPERTY LINE ------------------- (E)STRUCTURE DETTACHED GARAGE _ ffi ,, SU PILES B 6' OC MAX . (2) PILEUS (j 6, QE MPX c e (2) PILE, 5,((� 6',OC DECK PARCEL NO. 00513105800100 LEGAL DESCRIPTION MEADOWDALE BEACH BLK 058 D-00 - LOTS 1-2-3 TGW TH PTN VAC 74TH PL W LY ADJ THRTOPER CITY OF ED ORD NO 2797 REC AF NO 9010110127 LESS ANY PTN LY WHIN AS BUILT 75TH PL W PER SWD TO CITY ED REC AF NO 9010110122 OWNER NAME & ADDRESS TAYLOR JEFFREY G & PITTMAN JEFFREY 0 16012 74th PI W EdRronds, WA 98026 !S;;::� ----------------------------------------- PROPERTYLINE PILESPACINGSLOAO REWIRMEMSTABLE — MAXO.C.SPACINO,R MINVERTICALCAPACRY,Mp� PROOFTESTINULOAD,Lip� PILES PILETYPE BTVM PILES END OFFSET ALLOWABLE LOADING 2 MINVERTN:ALCAPACRY (MINULTIMATECAPAC" LOCATION 1 DRNEN 6-0' 60 Lip 120 kip PER PLAN 1-18 HELICAL 6'd Td &DLip 160Lip PER PL-N NOTES: e. MINIMUM AND MAXIMUM INSTALLATION TORQUE FOR HELICAL ASSEMBLIES SHALL BE SPECIFIED BY THE PILE EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF THE PILE SHAFTS OR ANY PART OF THE PILE ASSEMBLY. MAXIMUM INSTALLATION TORQUE RATING OF 8,300FPLBS FOR A 2-7181NCH DIAMETER HELICAL PILE WITH 0.203INCH SHAFT WALL THICKNESS PER ESR3750. b. FOR HELICAL PILES, PER IDEAL GROUP DWG NI 278TFG, THE ALLOWABLE STRUCTURAL CAPACITY FOR THE 2716 TRU-FORCE UNDERPINNING BRACKET IS LIMITED TO N KIPS. c. HELICAL ASSEMBLIES AS MANUFACTURED BY IDEAL MANUFACTURING, INC., IN ACCORDANCE WITH ESR3750. A. CONCENTRIC DRIVEN PILES AS MANUFACTURED BY STABIL{OC SYSTEMS, LLC, IN ACCORDANCE WITH ESR-4121. e. PILE OR ANCHOR LOADS NOT TO EXCEED MAXIMUM CAPACITY AS DETERMINED BY THE MANUFACTURER FOR ANY PART OF THE ASSEMBLY. T. MAXIMUM ON CENTER SPACING LISTED FOR TYPICAL PILE INSTALLATON UNLESS NOTED OTHERWISE ON PLAN. e. MINIMUM ONE LOAD TEST PER LOAD CONFIGURATION. 74th PL W NOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS. NOTE: L120'S SCOPE IS LIMITED TO THE PERIMETER SUPPORT SYSTEMICONTINUOUS FOOTINGS. THE INTERIOR CRAWL SPACE SUPPORTED SYSTEM FOR THE FIRST FLOOR SHALL BE INSTALLED PER R&R. SITE PLAN NOTES 1. VERIFY EXISTING STRUCTURES AND ALL DIMENSIONS ON SITE. 2. FOUNDATION DIMENSIONS ARE TO OUTSIDE FACE OF CONCRETE STEM WALL PER R&R FOUNDATION SPECIALIST (R&R) LEVEL SURVEY. 3. REFER TO STRUCTURAL CALCULATIONSPACKAGEBY L120 DATED NOV 14, OU, FOR ADDITIONAL INFORMATION, SPECIFICATIONS, AND REQUIREMENTS. 4. LEVEL SURVEY PER RBR PROPOSAL DATED SEP 2,2022. REFER TO STRUCTUPoIL CALCULATIONS PACKAGE FOR MODIFICATIONS AND ADDITIONAL REQUIREMENTS FOR LEVEL SURVEY. 5. PARCEL DIMENSIONS APPROXIMATED BY SNOHOMISH COUNTY ASSESSOR GIS MAPPING TOOLS &TAXSIFTER INCLUDING THE SELECTED PARCEL. PROPERTYDIMENSIONS PRE APPROXIMATE FOR REPRESENTATIVE PURPOSES ONLY. NOT TO SCALE. NOT TO BE USED FOR LEGAL PURPOSES B. SITE FEATURES AND SOME EXISTING STRUCTURES ON ADJACENT PARCELS NOTSHOWN FOR CLARITY. 7. GEOTECHNICAL SPECIAL INSPECTOR TO BE CONTINUOUSLY PRESENT DURING ALL PILE INSTALLATION AND TESTING. B. PILES SHALL BE INSTALLED TO A MINIMUM EMBEDMENT OF IO-0'PRIOR TO 9. MAXEXCAVATIONOFTr. HaESHALLBEDUGATFACHPILELOCATION SITE PLAN LEGEND EXISTING RESIDENCE STRUCTURE EXISTING ADJACENT STRUCTURE AREA OF PROPOSED WORK --- PROPERTY LINE APPROXIMATE DIMENSION 1 HELICAL PILE n, t DRIVEN PILE SITE PLAN 3 of 29 PROJECT NO. SHEET NO. S230718-1 PROJECT 16012 74th PI W, Edmonds, WA LONGITUDE SUBJECT ONE TWENTYO ENGINEERING & DESIGN BY PAM Foundation Stabilization DATE 09/20/23 Scope/Objective: To determine the required pile spacing and geometry to stabilize the existing structural foundation. These findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the existing structure above (based on as -built assessments). The R&R Foundation Specialists' (R&R) proposed pile layout can be found in the following pages with structural recommendations based upon the findings of L120 Engineering & Design. Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the structural scope presented here. It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl -space support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support posts, adjustable post -base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas shall be monitored and further adjustments shall be made if necessary. Structural Summary: - The foundation of the residence consists of continuous cast -in -place concrete stem wall and concrete strip footings. Below the footings, piles are to be spaced at a distance no larger than 6'-0" on -center at the locations indicated on the attached Level Survey. Piles to be installed in accordance with SSK-01 & SSK-02. - End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance of 3'-0". - A maximum allowable loading of 1,300 plf was utilized in this analysis. This was determined through inspection of building geometry and conservative span/tributary loading assumptions based on standard construction practices - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment assemblies with capacities equal to or greater than the indicated load values. Allowable Load Capacity Requirement: Driven Pile 1 .................. 6 kip minimum vertical capacity (allowable load) Helical Piles 1-18 ............ 8 kip minimum vertical capacity (allowable load) Note: Refer to the attached General Notes for additional requirements. - As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or expected additional structural analysis will be required. - Structural recommendations contained in this package are based on site photographs, dated May 30, 2023, and the geotechnical report, dated September 19, 2023, by Cobalt Geosciences. Both the photographs and geotechnical report were provided by R&R and are included within this package. Please inform L120 of site -specific conditions that were unconsidered by, may conflict with, or otherwise compromise the recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage, or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need to be revisited to consider and address the new findings Refer to the following pages for pile and connection specifications. L120 ENGINEERING & DESIGN 4 of 29 GENERAL NOTES HELICAL PILES 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE (IBC). 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC., AND SHALL BE IN ACCORDANCE WITH ESR-3750. 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 7. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. 14. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2012 IBC SECTION 1705.9 MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: A. PRODUCT MANUFACTURER B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS, EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT USED, AND THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS E. ANTICIPATED AND ACTUAL PILING DEPTH F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. HELICAL PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE (IBC). THE MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. 5 of 29 GENERAL NOTES CONCENTRIC/DRIVEN PILES 1. "CONCENTRIC' OR DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE (IBC). 2. IT IS RECOGNIZED THAT THE SEATTLE BUILDING CODE (SBC) REQUIRES 8 INCH MINIMUM DIAMETER PIPE FOR PIPE PILE INSTALLATION. THE APPROPRIATE ANALYSIS/EVALUATION AND TESTING REQUIREMENTS ARE PROVIDED FOR USE OF PILES LESS THAN 8 INCHES IN DIAMETER AS REQUIRED BY SECTION 104.5 OF THE IBC. 3. DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED BY STABIL-LOC SYSTEMS, LLC, AND SHALL BE IN ACCORDANCE WITH ESR-4121. 4. ALL MATERIAL PROPERTIES OF DRIVEN PILE COMPONENTS SHALL COMPLY WITH ESR-4121. 5. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 6. ALL PILE COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 7. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 8. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 9. DRIVEN PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF 1 DEGREE FROM VERTICAL PER SECTION 5.7 OF ESR-4121. 10. DRIVEN PILES SHALL BE INSTALLED TO THE MINIMUM FORCE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION FORCE SHALL NOT EXCEED THE ALLOWABLE CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE ASSEMBLY. 11. ALL BRACKETS AND PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION. 13. SPECIAL INSPECTION IN ACCORDANCE WITH IBC SECTION 1705.7 IS REQUIRED FOR INSTALLATION OF THE STABILLOC FOUNDATION PIERING SYSTEM. A GEOTECHNICAL SPECIAL INSPECTOR MUST VERIFY AND RECORD THE FOLLOWING: A. VERIFICATION OF MANUFACTURER PRODUCT MODEL NUMBERS B. TYPES, CONFIGURATIONS, AND IDENTIFICATIONS OF HYDRAULICALLY DRIVEN STEEL PIER SEGMENT AND ADJUSTABLE HEAD ASSEMBLY AS SPECIFIED IN ESR-4121 AND THE CONSTRUCTION DOCUMENTS. C. INSTALLATION PROCEDURES, ANTICIPATED AND ACTUAL PILING DEPTH D. TIP ELEVATIONS, THE INSTALLATION PRESSURE AND FINAL DEPTH OF THE DRIVEN FOUNDATION SYSTEM E. INCLINATION AND POSITION/LOCATION OF HYDRAULICALLY DRIVEN PIER SEGMENTS H. COMPLIANCE OF THE INSTALLATION WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THIS EVALUATION REPORT. 14. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. DRIVEN PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE (IBC). THE MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. 6 of 29 GENERAL NOTES STRUCTURAL STEEL 1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". 2. MATERIALS: BOLTS - ASTM A307, UNLESS OTHERWISE NOTED ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI) 3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. WHERE ON -SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2012 IBC SECTION 1705.2 IS ALSO REQUIRED. CONCRETE 1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC. 2. MINIMUM CONCRETE STRENGTH (28 DAYS): FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX BASEMENT FOUNDATION RETAINING WALLS .......................3,000 PSI - 5 SACK MIX SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX SLAB -ON -GRADE... EXPOSED WEATHERING SURFACES ...... 3,000 PSI AIR -ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE 3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE SURFACE WATER. 4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS. 5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP. GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING APPROVED ADMIXTURES. 6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM. 7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER. 8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR COLD WEATHER. 9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL. 10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG -TIE, HILTI, OR EQUIVALENT. SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER. 7 of 29 PROJECT NO. SHEET NO. S230718-1 PROJECT 16012 74th PI W, Edmonds, WA LONGITUDE SUBJECT ONE TWENTY° ENGINEERING & DESIGN BY PAM Foundation Stabilization DATE 09/20/23 Idea! Foundation Systems 2-7/8"0 Helical Pile (0.203-inch wall thickness) -Soil Capacity per ESR-3750 DIGGA 6K Drive Head Pressure Torque Correlation Factor, I(, Ultimate Axial Compressive Allowable Axial Compressive L120 ENGINEERING &DESIGN 8 of 29 PROJECT NO. SHEET NO. S230718-1 PROJECT 16012 74th PI W, Edmonds, WA LONGITUDE SUBJECT ONE TWENTY° ENGINEERING & DESIGN BY PAM Foundation Stabilization DATE 09/20/23 * Ideal Foundation Systems 2-7/8"0 Helical Pile (0.203-inch wall thickness) -Soil Capacity per ESR-3750 DIGGA 10K Drive Head Pressure (psi) Torque, T (ft*Ibs) Torque Correlation Factor, Kt [Compression] (ft-1J Ultimate Axial Compressive Capacity, P„ = Kc*T (kips) Allowable Axial Compressive Capacity, Pa = 0.5*P„ (kips) 500 1,740 9 15.7 7.8 600 2,088 9 18.8 9.4 700 2,436 9 21.9 11.0 800 2,784 9 25.1 12.5 900 3,132 9 28.2 14.1 1000 3,480 9 31.3 15.7 1100 3,828 9 34.5 17.2 1200 4,176 9 37.6 18.8 1300 4,524 9 40.7 20.4 1400 4,872 9 43.8 21.9 1500 5,220 9 47.0 23.5 1600 5,568 9 50.1 25.1 1700 5,916 9 53.2 26.6 1800 6,264 9 56.4 28.2 1900 6,612 9 59.5 29.8 L120 ENGINEERING &DESIGN 9 of 29 PROJECT NO. SHEET NO. S230718-1 PROJECT 16012 74th PI W, Edmonds, WA LONGITUDE SUBJECT ONE TWENTY° ENGINEERING & DESIGN BY PAM Foundation Stabilization DATE 09/20/23 Stabil-Loc 2-7/8"0 i.) Power Team C25C Hydraulic Cylinder effective cylinder area has from manufacturer cut sheets ii.) Piles shall reach a pressure that correlates with an allowable capacity that meets or exceeds the maximum allowable load demand as listed in the structural package, but shall not exceed the maximum allowable capacity for any part of the pile assembly. III.) Referto ESR-4121 and Stobil-Coc, Inc. documents for additional information and requirements. iv.) 1 kip =1,000 Ibs Concentric Pier -Soil Capacity per by Installation Pressure Power TeamC25C Hydraulic Cylinder Pressure,p (psi) Cylinder Effective Area, A (in1) Ultimate Axial Compressive Capacity, P„ =p'A (kips) Allowable Axial Compressive Capacity, Pa=0.5;P, (kips) 1,000 5.15 5.2 2.6 1,500 5.15 7.7 3.9 2,000 5.15 10.3 5.2 2,500 5.15 12.9 6.4 3,000 5.15 15.5 7.7 3,500 5.15 13.0 9.0 4,000 5.15 20.6 10.3 4,500 5.15 23.2 11.6 5,000 5.15 25.3 12.9 5,500 5.15 23.3 14.2 6,000 5.15 30.9 15.5 6,500 5.15 33.5 16.7 7,000 5.15 36.1 13.0 7,500 5.15 33.6 19.3 8,000 5.15 41.2 20.6 3,500 5.15 43.3 21.9 9,000 5.15 46.4 23.2 9,500 5.15 43.9 24.5 L120 ENGINEERING &DESIGN 10 of 29 Tuesday, May 30, 2023 SCOPE OF WORK R&R CREW RESPONSIBILITIES & DETAILS: �.11j"IM7,1116 - Crew will install 18 3" Helical Piles & 1 3" Stable-Loc pile to stabilize structure only. - Crew will also install 4 carbon fiber stitch repairs at the designated locations where pre-existing cracks are located in foundation. - Crew will remove & replace 9 (roughly 2x2 area's) in designated slab Walkways to allow for pile installation. - Crawlspace Height is 24"-12" tall - Footing Depth is T-6' deep - Crawlspace access is located on interior HOMEOWNER RESPONSIBILITIES: - Have necessary landscaping & plants removed in designated locations piles will be installed prior to crew's arrival. ADDITIONAL INFO: - R&R will handle necessary permit and engineering coordination. - 25% deposit, 25% upon issue of permit and final 50% upon completion of project. - Permit cost is not included and will be billed on second 25% deposit payment. - Homeowner understands permit process may require the hiring of a Geotechnical Engineer and or a WABO certified special inspector billed at additional fees depending on municipality. - Responsible party representative must be onsite during crew arrival, project completion and foundation lifting if applicable. -Permitting/scheduling times may vary beyond R&R control Material Clause: - Depth Clause: Piles are bid to 25 foot maximum depth. $20 per foot charge beyond that. - Homeowner will be notified if any unexpected items arise and no additional work will be completed without homeonwer approval 11 of 29 Tuesday, May 30, 2023 ELEVATION MAP L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and that a maximum pile spacing of 6%0"o.c. is achieved. Refer to attached SSK-01 & SSK-02. NOTES: 1. It is acceptable to install piles at the spacing shown with ± 0'-6" tolerance to allow for unexpected obstructions encountered during pile installation provided that no two adjacent spans exceed the spacing limitation of 6-0"o.c. 2. End piles are to be placed as close to corners as possible and shall not exceed a maximum corner distance of T-0" as marked. - Back Decking - -- B. 11' 21' -11/8 -7/8 - -1 1/4 8 00 X -3/4 ------ --------------- LOCATE PILE WITHIN < SW wall 6"-2' T OF CORNER f�F�X U 1 � 18 U 1 5/8 < Crawlspace oist's Run A-8 1 1 /4 1 /4 Joist's Run -t err c1 Ad iiGn_- U OI �1/4 27' -1 U W 21/4 4 7' J Stem wall6"x2' 13 @Chimney - W a 2o7/8 U -3 -2 1 /8 -/ Ma1/2 16 23/4 1 31/4 J Basement 1LOCATE PILE WITHIN Cl) 1 ' 12 513' a 3' OF CORNER MAX LOCATE PILE WITHIN 1 1/2 � 3/ s 5/8 7 6Jrry T OF CORNER MAX 11 x 10 27 8 w (2) PILES @ = 3" Stable-Loc Pile (2) PILES @ 6' OC MAX in 6' OC MAX �= 3" Helical Pile m 7. 1� = Carbon Fiber Stitch Repair 3 LOCATE PILE WITHIN On Existing Cracks In Foundation E T OF CORNER MAXJoist's spaced 18"O.0 T5) PILES @ 6' OC MAX i NOTE: L120's scope is limited to the perimeter support systems/continuous footings of the primary structure. All stabilization and replacement efforts of exterior decks and deck supporting elements are outside of 1-120's contract and scope and are not addressed in this package. - L120 12 of 29 Tuesday, May 30, 2023 JOB PHOTOS s. l�Jy y:.^ � i� ;u P " �►�r Lys ri( j,,y'+1✓ .,' .r� yri • dui. 11� v' T dMl 1�141, MIM� Z Helical piles #1-3 will be installed along the north side of home's foundation. Crew, excavate, roughly 2x2 areas in locations where piles will be placed. Crew will lay plastic for all excavated, soils and debris. Helical piles #7-11 will be installed here along the east interior basement wall as specified on the elevation map. Crews will also be removing a roughly 2x2 area in the interior slab to drill them out you little piles. 1 Helical piles #4-6 will be installed along the Northeast exterior section of homes foundation as specified in elevation map. Crew will need to remove and replace 1 2x2 area in slab walkway to drill and mount helical pile #6. Homeowners will remove any landscaping prior to crews arrival if wishing to preserve and avoid damaging landscaping in locations where piles are located. �§ M� r9 Helical piles #12-14 will be installed along the south and west interior foundation walls as specified on elevation map. Crew will also install one carbon fiber stitch repair at the designated location where pre-existing crack is located on the foundation. Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. - L120 13 of 29 Tuesday, May 30, 2023 JUH PHOTOS Helical pile #15 will be installed here along the designated location specified in Elevation map, crew may switch to stable-loc piling if space is not adequate to drill helical piling. t_— Flu �_ A Stable-Loc pile #1 will be installed here along the interior of addition's crawlspace at the designated locations specified on elevation map. .. 7j,'� FOUNDATION SPECIALIST %/, Helical Piles #15-18 will be installed along the South side of home's addition at the specified locations designated on elevation map. Homeowner will need to remove any landscaping wishing to preserve in locations where helical piles will be placed along this location. i iris ' - ��1 a �- �1 y - Crew will also install 3 carbon fiber stitch repairs at the designated locations where pre-existing cracks are located in foundation. Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. - L120 14 of 29 PROJECT NO. NO. S230718-1XR SSK-01 PROJECT 16012 74th PI W, Edmonds, WA LONGITUDE SUBJECT ONE TWENTY ENGINEERING & DESIGN BY PAM (E) WOOD FRAMED FLOOR SYSTEM, FIELD VERIFY Foundation Stabilization _o 8" MIN THICKNESS, P CONTRACTOR TO VERIFY ry ° LJ O v d Lu U ° = Q w ^z�> G z O 0 d cv U N . V d lid=IIII=IIII=IIII=IIII=IIII=IIII=_ d d . — 111-IIII=IIII=IIII=IIII=III 411 M.I1 —IIII—_IIII—_IIII—_. �' d dll IIII—IIII—III d d '�`—` -II11-IIII- III=IIII=III ° =IIII=IIII IIII=_IIII=_IIII=_ III=IIII=IIII=IIII= (E) CONTINUOUS 1�=IIII=IIII=IIII=IIII_ —„ CONIC FOOTING NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER —OF —RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT CORROSION. DATE 09/20/23 (E) CONIC STEM WALL T/STEM WALL = FIELD VERIFY T/FIN GRADE IIII=IIII=IIII=IIII. VARIES 1=IIII=IIII=IIII=11 IIII=IIII=IIII=IIII (E) FTG TO BE CUT FLUSH 1=IIII=IIII=IIII= IIII=IIII=IIII=IIII_ WITH FACE OF STEM WALL 1=IIII=IIII=IIII=11 IIII-IIII-IIII-� = WITH A 12" MAX WIDTH FOR 1=_IIII=1111=_III _1111 INSTALLATION POCKET IIII=IIII=IIII IIII= 1=IIII=IIII— II=III '',IIII=IIII=1 =IIII= 1— III=111 _IIII=IIII- T/CONC FTG — 11=IIII-IIII- FIELD VERIFY IIII=IIII=IIII 11=_IIII=_1.111— IIII—IIII 11-IIII- (2) 1/211 DIAMETER TITEN HD IIIIIIIIIIIIIIII ANCHORS W/ MIN 4" 1 =IIII=IIII EMBEDMENT INTO SIDE OF 111=j1 - FOOTING. CONTRACTOR/MFR TO PROVIDE ANCHOR HOLES WITHIN MIDDLE THIRD OF BRACKET, MAINTAINING 3" EDGE DISTANCE IDEAL HELICAL PILE & REPAIR BRACKET ASSEMBLY PER R&R FOUNDATION SPECIALIST TO CONFORM TO ESR-3750 2-7/8" SHAFT W/ 10" DIAM DOUBLE HELIX W/ 3" PITCH L120 ENGINEERING & DESIGN 15 of 29 PROJECT NO. NO. S230718-1 XR SSK-02 PROJECT 16012 74th PI W, Edmonds, WA LONGITUDE SUBJECT ONE TWENTY ENGINEERING & DESIGN BY PAM Foundation Stabilization (E) WOOD FRAMED FLOOR SYSTEM, FIELD VERIFY\ ---------- -------------------- 8" MIN THICKNESS, CONTRACTOR TO VERIFY DATE 09/20/23 (E) CONIC STEM WALL T/STEM WALL = FIELD VERIFY T/FIN GRADE =h III=IIII=IIII=IIII= VARIES IIII=IIII=IIII=IIII '° IIII=IIII=IIII=IIII= —IIII=_IIII=_IIII=11 P � ,IIII—IIII—IIII—IIII— . ' =IIII=IIII=IIII=IIII_ ° IIII=IIII=IIII=IIII=11 ° 1 �. =IIII=_IIII=_IIII=_IIII= ,IIII—IIII—IIII—IIII—I • =IIII=IIII=IIII=IIII= v • 1° IIII=IIII=IIII=IIII=11 =IIII=IIII=IIII=IIII= T/CONC FTG - ' ,I� lill-rill-ll FIELD VERIFY ° IIII—IIII—IIII- -till-_lilt_-1' WEDGE ANCHORS a .I a allll=IIII=IIII IIII=IIII— 111=IIII - ''11= 11=IIII=1I (E) CONTINUOUS =IIII-IIII- CONC FOOTING NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING J SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION a PER ASTM 153/A123. II 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL w U-1 REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT a U) CORROSION. '4 '4 PER STABIL-LOC III=IIII=1i' REQUIREMENTS III=IIII=till=fill= _ _IIII=IIII= IIII= III IIII=111'— STABIL-LOC CONCENTRIC PIER ASSEMBLY PER R&R FOUNDATION SPECIALIST TO CONFORM TO ESR-4121 L120 ENGINEERING & DESIGN 1 1/2 X 1 SLOT (TYP) 3 X 3/4 SLOT(TYP) 2 7/8" TRUFORCE BRKT BRACED BASE GALV. TOP 2 7/8" TRUFORCE BRKT BRACED BASE GALV. FRONT TRUFORCE UNDERPINNING BRACKET FOR 2 7/8" PILE SHAFT 7�6 1 1/2 X ] 2 7/8" TRUFORCE BRKT T-BRKT GALV. SLOT (TYI TOP 2 7/8" TRUFORCE BRKT T-BRKT GALV. FRONT NOTES: 1. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ASTM A572/A1018/A656, 50 KSI. 2. ALL WELDING TO BE PERFORMED BY SHOP QUALIFIED WELDOR TO AWS D1.1 STRUCTURAL WELDING CODE - STEEL. 3. GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 4. ULTIMATE STRUCTURAL CAPACITY IS 60 KIPS. 5. (2) 7/8"-9 X 3' GALVANIZED THREADED ROD - ASTM A193 (GRADE B7). 6. (4) 7/8" GALVANIZED HEX NUT - ASTM A194. 7. (6) 7/8" GALVANIZED FLAT WASHERS - ASTM F436. (2) WASHERS MUST BE USED ON THE TOP OF EACH THREADED ROD (ABOVE THE 'T' BRACKET) TO OBTAIN THE FULL BRACKET CAPACITY. B. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. PICTURE PARKWAY STER, NY 14580 789-4810 1 WWW.IDL-GRP.COM NOT TO SCALE ALL UNITS IN INCHES U.N.O. 3 wrvrl VCIV � IH1 THE INFORMATION CONTAINED IN THIS � � � DRAWING IS THE SOLE PROPERTY OF 1 � IDEAL M NUFAC URIN IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A Group WHOLE WITHOUT WRITTEN PERMISSION OF IDEAL MANUFACTURING, INC. IS PROHIBITED. 27STFBPG SHEET 1 OF 1 8 O M IV A 1 1 2 W ULTEMA CAPACITY IIS740.7EXCEEKIPS IMUM TORQUE NOT AS ON A CAPACITY TO 2 7/8" O.D. X 0.203'' W.T. HELICAL LEADS & EXTENSIONS TORQUE RATIO OF kt = 9 FT-1 ICC-ES AC358 -REPORT #ESR-3750 [L] EXTENSION FLIGHTED EXTENSION FLIGHTED EXTENSION (EX: 278203EXT[L]G) SINGLE HELIX (SH) DOUBLE HELIX (DH) (EX: 278203FESH[L][Di]X[T]G) (EX: 278203FEDH[L][D3D2]X[T]G) NOTES: 1. PILE SHAFT TO MEET OR EXCEED REQUIREMENTS OF ASTM A500, 80 KSI. 2. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ATSM A572, GRADE 50. 3. ALL HELICES ARE FORMED BY PRESS DIE. LEADING EDGE OF HELICES ARE TAPERED TO IMPROVE INSTALLATION CAPABILITIES. 4. HELIX SPACING IS THREE (3) TIMES THE DIAMETER OF THE LOWER HELIX. B SPACING OF LEADING HELIX ON FLIGHTED EXTENSIONS IS THREE (3) TIMES THE DIAMETER OF THE LAST HELIX ON THE PRECEDING SHAFT. 5. STANDARD HELIX DIAMETERS ARE 8", 10", 12", & 14". STANDARD HELIX THICKNESS IS 3/8". 6. ALL WELDING TO BE PERFORMED BY CERTIFIED WELDOR IN ACCORDANCE WITH AWS D1.1 STRUCTURAL WELDING CODE - STEEL. 7. HOT DIP GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 8. (2) 3/4" DIAMETER X 4 1/2" LONG GALVANIZED HEAVY HEX BOLT ASTM A325 AND (2) 3/4" GALVANIZED HEAVY HEX NUT ASTM A194 (GRADE 2H). 9. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 (IDEAL REPORT #ESR-3750) ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. Da p3 I �I �D3 �D= �{ �D� I I I p3 —Li LING NUTS 5% (TYP) ?� 1 SINGLE HELIX (SH) DOUBLE HELIX (DH) TRIPLE HELIX (TH) QUAD HELIX (QH) LEAD LEAD LEAD LEAD (EX: 278203SH[L][Di]X[T]G) (EX: 278203DH[L][DiD2]X[T]G) (EX: 278203TH[L][DTD2D3]X[T]G) (EX: 278203QH[L][D3D2D3D4]X[T]G) 2%O.D.X� 2 4 IDEAL PART # ABREVIATIONS: 0.203 W.T. 278 = SHAFT DIAMETER = _ 3 PITCH TYPICAL PILE 203 = SHAFT WALL THICKNESS ASSEMBLY EXT = EXTENSION (NP) FE = FLIGHTED EXTENSION O15l6 SH, DH, TH, QH = SINGLE, DOUBLE, TRIPLE, OR QUAD. HELIX [L] = SHAFT LENGTH IN FEET BOLT HOLE HELIX FORMED BY (EXAMPLE: 7' = 7) DETAIL PRESS DIE [D] = HELIX DIAMETER(S) IN INCHES (EXAMPLE: 10" = 10) X = X (SEPARATES HELIX DIAMETER(S) AND HELIX THICKNESS) [T] = HELIX THICKNESS (EXAMPLE: 3/8" = 38) G = GALVANIZED SINGLE HELIX EXTENSION TRIPLE HELIX LEAD TIP CUT AT 45° 4/3/2020 'D El A L rKvrKIC I AKT HIVU U ivr1UCIV I1H1 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF :KED 4/7/2020 1 IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A 1L MANUFACTURING, INC. PICTURE PARKWAY WHOLE WITHOUT WRITTEN STER, NY 14580 Group PERMISSION OF IDEAL 789-4810 1 W W W.IDL-GRP.COM MANUFACTURING, INC. IS PROHIBITED. NOT TO SCALE SIZE I DWG NO REV SHEET 1 OF 1 ALL UNITS IN INCHES U.N.O. B 278203 0 3 B 18 of 29 ESR-4121 I Most Widely Accepted and Trusted PLATE ROUND 4=375 IM CUT -0 ETT E ICTALL AFTER QIF ETEO PER NS'MUTIOA Te I�aYw 0 HEDGE EDfL IE IT CUT I, HER k OUTS HSS AT 17' FinISC O4 R� EOO T141CAL OUTER PER SEAM RDIIID Im 7d79A.217 ASI4 A5OD-13 AS:f WHIM NIER GR. B k OUTER PER SEG4E4'S STARTER F Ayagv I emRM OR ORIER I 9UTTAfli SWA T" P31 R 2 ASI4 PIER ASSEMBLY STABL-LOC S751E115, 11C ELATE 8-12-18 FIGURE 1—STABIL-LOC FOUNDATION PIERING SYSTEM OUTUNC ' 1 BEARING tt PLAN V1EW rVOxhx18 B_IWEEN PLATE / BRG E & FOOTING BEARING PLATL HSS2.375x0.188 CUT TO FIT & INSTALL AFTER COMPLETED PIER INSTALLATION 7A 0 H01 FS .w,---FOOTING 2—WO x 3.5' AKIN. FSR 1 E6 WEDLN I ESR 1396 MIEDGF ANCHORS BLOCK PLA IL ASSEMBLED INNER & OUTER PIER SEGMENTS HEAD ASSEMBLY STABIL-LOC VFW. LLC FIGURE 2—STABIL-LOC"FOUNDATION PIERING SYSTEM ADJUSTABLE HEAD ASSEMBLY 19 of 29 LONGITUDE ONE TWENTYO ENGINEERING & DESIGN PROJECT NO. SHEET NO. S230718-1 PROJECT 16012 74th PI W, Edmonds, WA SUBJECT Foundation Stabilization LOAD ANALYSIS: IBC 2018 - 1-Story Building 6' SPAN Driven Pile 1 Deck LL: 60 psf Floor LL: 40psf Floor/Deck DL: 15psf Wall DL: 12psf Deck Trib = 0.5*10' max span = 5' Floor Trib = 0.5*6' max span = 3' Typical Flr Ht = 10' x 1 stories = 10' wpL = 15psf*(5'+3')+12psf*10' = 0.24 klf wLL= 60psf*5'+40psf*3' = 0.42 klf WSTEM = 0.25klf wTL.A„ew. = D+L+Stem = 0.24kif + 0.42kif + 0.25kif = 0.91 klf DATE 09/20/23 ---------------------- --------------------------- L/2 L/2 - IL 6' Span PoE = 0.24klf * 6' = 1.5 k 6' Span PEE = 0.42klf * 6' = 2.6 k 21-2" 6' Span PITEM = 0.25klf * 6' = 1.5 k ( 1$"+ $") 6' Span PTE.A„ow.=1.5k+2.6k+1.5k=5.6k Case 1: Point Load 6'-0" Span: (Conc Only) Pt Load = 6k Refer to attached calculations for analysis. Case 2: Uniform Load 6'-0" Span: (Conc Only) Uniform Load DL = 500 plf LL = 420 plf Refer to attached calculations for analysis. Pile and connection requirements per Pile and connection requirements per contractor contractor 6'-0" max NOTES: 1. Both uniform and point loads analyzed in the following calculations. Uniform loads are assumed to be standard due to load distribution from bearing walls, however, the additional point load is conservatively considered here for any major beam supports from above. 2. Maximum loading on the grade beam was determined by inspection of the building geometry and through conservative assumptions regarding span lengths and support wall/foundation. All concrete walls assumed full tributary span of floor and roof members. Conclusion: Based on the loading and geometry of the structure we conclude that the foundation may be stabilized through the use of piles and connections per R&R. These are to be attached to the stem -wall (grade -beam) at an on -center (o.c.) spacing no greater than 6-0". L120 ENGINEERING & DESIGN 20 of 29 LONGITUDE ONE TWENTYO ENGINEERING & DESIGN PROJECT NO. SHEET NO. S230718-1 PROJECT 16012 74th PI W, Edmonds, WA SUBJECT Foundation Stabilization LOAD ANALYSIS: IBC 2018 - 1-Story Building 6' SPAN Helical Piles MAX TRIB Condition Roof LL (snow ground): 25 psf Floor LL: 40psf Floor/Roof DL: 15psf Wall DL: 12psf Roof Trib = 0.5*24' max span = 12' Floor Trib = 0.5*16' max span = 8' Typical Flr Ht = 10' x 1 stories = 10' wpL = 15psf*(12'+8')+12psf*10' = 0.42 klf wLL= 25psf* 1 2'+40psf*8' = 0.62 klf WSTEM = 0.25klf wTL.A„ew. = D+L+Stem = 0.42kif + 0.62kif + 0.25kif = 1.3kif DATE 09/20/23 ---------------------- --------------------------- L/2 L/2 - IL 6' Span PoE = 0.42klf * 6' = 2.6 k 6' Span PEE = 0.62klf * 6' = 3.8 k 21-2" 6' Span PITEM = 0.25klf * 6' = 1.5 k (1$11+ $") 6' Span PTE.A„ow.=2.6k+3.8k+1.5k=7.9k Case 1: Point Load 6'-0" Span: (Conc Only) Pt Load = 8k Refer to attached calculations for analysis. Case 2: Uniform Load 6'-0" Span: (Conc Only) Uniform Load DL = 670 plf LL = 320 plf LL, (snow) = 300 plf Refer to attached calculations for analysis. Pile and connection requirements per Pile and connection requirements per contractor contractor 6'-0" max NOTES: 1. Both uniform and point loads analyzed in the following calculations. Uniform loads are assumed to be standard due to load distribution from bearing walls, however, the additional point load is conservatively considered here for any major beam supports from above. 2. Maximum loading on the grade beam was determined by inspection of the building geometry and through conservative assumptions regarding span lengths and support wall/foundation. All concrete walls assumed full tributary span of floor and roof members. Conclusion: Based on the loading and geometry of the structure we conclude that the foundation may be stabilized through the use of piles and connections per R&R. These are to be attached to the stem -wall (grade -beam) at an on -center (o.c.) spacing no greater than 6-0". L120 ENGINEERING & DESIGN 21 of 29 PROJECT NO. SHEET NO. S230718-1 PROJECT 16012 74th PI W, Edmonds, WA LONGITUDE SUBJECT ONE TWENTYO ENGINEERING & DESIGN BY PAM Foundation Stabilization DATE 09/20/23 FOUNDATION LOADING ------------ ----------------- -------------- 0 0 M -1111-III 1111=1111=1111=1111=1111=1111=IIII=1111 III-1111=1111=1111=1111=1111=1111=IIII=11 1111=IIII=1111 IIII=1=IIII-iln-1111=�111=II11=IIII=1111= I 1=1111=1111=1111=1111=1111=1111=IIII=1111 111=IIII=1111= 6'-0" OC 6'-0" OC PILE PILE PILE As illustrated above, the concrete compression cone extending from each pile will expand to cover the full length of any wall with a height greater than 1/2 of the pile spacing. Therefore an unreinforced wall with minimum height of 3'-0" can span between piles spaced at 6'-0"oc. L120 ENGINEERING & DESIGN 22 of 29 Project Number: Plan Name: Shee[ Number: S230718-lXR 16012 74th P1 W Engineer: Subject: Date: PAM 26" Unreinforced Conc Beam 9/20/2023 DEMAND CALCULATION number ofstories # Istories span L 6.0 ft [max on -center pile spacing] concrete area A 216 in2 *see attached concrete self weight SW 225 plf [Includes total height w/o ACI14 §14.5.1.7 redux] w DL DL 420 plf [1-story loading] w LL LL 320 plf [1-story loading] w LLr LLr 300 plf [1-story loading] **Assuming a single span between 2 piles - in reality continuous spans between piles will have reduced moments** momentfrom DL MDL 2,903 lb-ft 34.8 k-in momentfrom LL MLL 1,440 lb-ft 17.3 k-in Mmax = ewlx momentfrom SL MLI 1,350 lb-ft 16.2 k-in shearfrom DL VDL 1,935 lb 1.94k shearfrom LL VLL 960 lb 0.96 k vmax = ZwL shearfrom SL VL1 900 lb 0.90k factored moment MLRFD 48.8 k-in 1.4DL MLRFD 77.5 k-in 1.2DL + 1.6LL + 0.5SL MLRFD 85.0 k-in 1.2DL + 1.6SL + LL controllingfoctored moment MR 85.0 k-in factoredshear VLRFD 2.7k 1.4DL VLRFD 4.3k 1.2DL + 1.6LL + 0.5SL VLRFD 4.7k 1.2DL + 1.6SL + LL controlling factored shear V. 4.7 k controlling factored bearing BR 4.7 k Bmax = vmax STRENGTH CALCULATION concrete strength f'c 2.5 ksi assumed light wt concrete mod. factor A 1 normal weight concrete flexure strength red. factor IN. 0.6 ACI 318-14 [Table 21.2.1] shear strength red. factor Ch... 0.6 ACI 318-14 [Table 21.2.1] bearing strength red. factor �hear;Rg 0.6 ACI 318-14 [Table 21.2.1] *Note that per AC1318-14 Ch. 27.3.2 a phi factor of D.8 can be used if dimensions and material properties are confirmed. moment of ineritio Ip 11,016 in4 *see attached elastic section modulus Sm 1,001 in3 *see attached tensfiber to NA c 13.0 in *see attached nom flexure strength (Tcontrols) Mn 250.3 k-in M. = 52.V-f7cSm CONTROLS ACI 318-14 [Eq. 14.5.2.1a] nomflexure strength(C controls) Mn 2,127.1 k-in M,=0.85fS ACI 318-14[Eq. 14.5.2.1b] RESIDENTIAL CONCRETE Mn 375.4 k-in Mn = 7.55z1VfcSm X ACI 332-14 [Eq. 8.2.1.1] - not utilized flexure strength „ 150.2 k-in > Mu OK D/C= 56.61% nom shear strength V„ 14.4 k V.= * A ACI14 [Table 14.5.5.1(a)] 32VfTc shearstrength 4,V" 8.6 k > Vu OK D/C= 54.65% loaded bearing area Ar 74 in2 [IDEAL 2-7/8" Tru-Force Underpinning Bracket] supporting surface bearing area Az 74 in2 [If the supporting surface is> than loaded area] nom bearing strength B„ 156.6 k 0.85fA L ACI14 [Table 14.5.6.1(c)] bearing strength T- 94.0 k > Bu OK D/C= 5.03% Additional Verification Calc: max concrete tensile strength fr 375 psi %r = 7,$� ACI 318-14 [Eq. 19.2.3.1] max beam tensile stress F, 100 psi Ft = (M * c)/fxx f, > Ft OK 23 of 29 Project Number: Plan Name: Shee[ Number: S230718-1XR 16012 74th PI W Engineer. Subject: Date: PAM 26" Unreinforced Conc Beam 9/20/2023 Final Section Proverties Total Area 216.0 inA2 Ixx 11.016.0 inA4 Sxx : - Y 1,001.45 inA3 lyy 1,631.93 inA4 Sxx : +Y 847.38 inA3 Calculated final C.G. distance from Datum : X cg Dist. 0.0 in Zxx 1.349.99 inA3 Syy : - X 271.988 inA3 SYY : +X 271.988 inA3 Y cg Dist. 0.0 in Zyy 504.0 inA3 Edge Distances from CG.: r xx 7.141 in +X 6.0 in +Y 13.0 in r ri 2.749 in -X -6.0 in -Y in Rotation of All Components Ca. 0.00 deg CCW `v N zo n t\1 Zv XCG 1 L L _ 1 CV I 1 cc - - _ _ Per AC114 §14.5.1.7 - 1 : pl Xcg = 0.000 in Ycg = 0.000 in Rotation = 0 deg CCW Top Flange Width : 8.000in Top Flange Thick = 8.000in Web Thickness = 8.000in Bottom Flange Wid 12.000in Bottom Flange Thi, 6.000in Top Height - 24.000in 24 of 29 Appendix Parcel Details & Photographs 25 of 29 SnohomishOnline Government Information & Services County 4)� Washinqton Property Account Summary 9/20/2023 Parcel Number 00513105800100 Property Address 16012 74TH PL W, EDMONDS, WA 98026-4518 General Information MEADOWDALE BEACH BLK 058 D-00 - LOTS 1-2-3 TGW TH Property Description PTN VAC 74TH PL W LY ADJ THRTOPER CITY OF ED ORD NO 2797 REC AF NO 9010110127 LESS ANY PTN LY WHN AS BUILT 75TH PL W PER SWD TO CITY ED REC AF NO 9010110122 Property Category Land and Improvements Status Active, Locally Assessed Tax Code Area 100217 I Property Characteristics I Use Code I I I Single Family Residence - Detached Unit of Measure Acre(s) Size (gross) 0.52 Parties Role Percent Name Address Taxpayer 100 TAYLOR JEFFREY G/PITTMAN JEFFREY O 16012 74TH PL W, EDMONDS, WA 98026 Owner 100 TAYLOR JEFFREY G & PITTMAN JEFFREY O 16012 74TH PL W, EDMONDS, WA 98026-4518 United States Related Properties No Related Properties Found Property Values Value Type Tax Year 2023 Tax Year 2022 Tax Year 2021 Tax Year 2020 Tax Yeac 201S Taxable Value Regular $1,530,000 $1,074,600 $1,068,000 $991,400 $895,50( Exemption Amount Regular Market Total $1,530,000 $1,074,600 $1,068,000 $991,400 $895,50( Assessed Value $1,530,000 $1,074,600 $1,068,000 $991,400 $895,50( Market Land $1,218,100 $809,300 $821,000 $758,900 $661,80( Market Improvement $311,900 $265,300 $247,000 $232,500 $233,70( Personal Property Active Exemptions No Exemptions Found 26 of 29 Events Effective Entry Date- Type Remarks Date Time 12/08/2016 12/08/2016 Excise Processed Temporary Excise: T050214 Finalized to: E077451 13:23:42 12/05/2016 01/18/2017 Owner Terminated Property Transfer Filing No.: E077451 12/05/2016 by sasset 13:59:00 12/05/2016 01/18/2017 Owner Added Property Transfer Filing No.: E077451 12/05/2016 by sasset 13:59:00 12/05/2016 12/08/2016 Excise Processed Property Transfer Filing No.: T050214, submitted by eREET 13:23:00 12/05/2016 by ASCEREET 03/07/2014 03/07/2014 Excise Processed Temporary Excise: T005863 Finalized to: E034638 14:31:37 03/06/2014 03/11/2014 Owner Terminated Property Transfer Filing No.: E034638 03/06/2014 by sasset 07:41:00 03/06/2014 03/11/2014 Owner Added Property Transfer Filing No.: E034638 03/06/2014 by sasset 07:41:00 03/06/2014 03/07/2014 Excise Processed Property Transfer Filing No.: T005863, submitted by eREET 14:31:00 03/06/2014 by ASCEREET 08/16/2006 08/31/2006 Owner Terminated Property Transfer Filing No.: 108066 08/16/2006 by sasset 14:34:00 08/16/2006 08/31/2006 Owner Added Property Transfer Filing No.: 108066 08/16/2006 by sasset 14:34:00 08/16/2006 08/23/2006 Taxpayer Changed Property Transfer Filing No.: 108066 08/16/2006 by strwjt 13:25:00 08/16/2006 08/21/2006 Excise Processed Property Transfer Filing No.: 108066, Bargain and Sale Deed 16:05:00 08/16/2006 by strphb Party/Property Relationship by strssl 04/27/2006 04/27/2006 Taxpayer Changed 11:53:00 03/30/2006 03/30/2006 Tax Bill Senior Exemption Denied for 2006 performed by strpac 11:35:00 Recalculation Tax Balance Installments Pa able Tax Year Installment iDue Date I Principall Interest, Penalties and Costsl Total Duel Cumulative Due 2023 2 10/31/2023 1 $5,206.691 $0.001 $5,206.691 $5,206.69 Distribution of Current Taxes Voted Non - District Rate Amount Amount Voted Amount CENTRAL PUGET SOUND REGIONAL TRANSIT AUT 0.16 $238.31 $0.00 $238.31 CITY OF EDMONDS 0.96 $1,470.93 $421.11 $1,049.82 EDMONDS SCHOOL DISTRICT NO 15 2.62 $4,006.12 $4,006.12 $0.00 PUB HOSP #2 0.05 $70.83 $0.00 $70.83 SNO-ISLE INTERCOUNTY RURAL LIBRARY 0.31 $475.63 $0.00 $475.63 SNOHOMISH COUNTY-CNT 0.48 $730.50 $0.00 $730.50 STATE 2.23 $3,411.00 $0.00 $3,411.00 SNOHOMISH CONSERVATION DISTRICT $10.05 $0.00 $10.05 TOTAL 6.80 $10,413.37 $4,427.23 $5,986.14 Pending Property Values 27 of 29 Pending Market Land Market Improvement Market Total Current Use Current Use Current Use Tax Year Value Value Value Land Value Improvement Total Value 20241 $1,066,300.00 $255,000.00 $1,321,300.00 $0.00 $0.00 $0.001 Levy Rate History Tax Year Total Levy Rate 2022 8.270203 2021 8.207334 2020 9.276512 Real Property Structures Description IType IYear Built IMore Information 1 1/2 Story w/Basement IDwelling 11932 IView Detailed Structure Information Receipts Date Receipt No. Amount Applied Amount Due 04/18/2023 00:00:00 12785750 $5,206.68 $10,413.37 10/18/2022 11:18:00 12342173 $4,447.61 $4,447.61 04/21/2022 00:00:00 12231556 $4,447.60 $8,895.21 10/13/202116:18:00 11773557 $4,386.74 $4,386.74 04/20/202100:00:00 11528406 $4,386.73 $8,773.47 10/16/2020 00:00:00 11202818 $4,602.39 $4,602.39 04/15/2020 00:00:00 10930641 $4,602.39 $9,204.78 10/09/2019 00:00:00 10624043 $4,124.83 $4,124.83 03/26/2019 00:00:00 10327294 $4,124.83 $8,249.66 10/11/2018 00:00:00 10064603 $4,385.27 $4,385.27 04/18/2018 00:00:00 9808689 $4,385.26 $8,770.53 Sales History Sale Date 08/16/2006 03/06/2014 12/05/2016 Entry Recording Sale Excise Deed Transfer Grantor(Seller) Grantee(Buyer) Other Date Number Amount Number Type Type Parcels WIGGINS KITSAK 08/21/2006 $850,000.00108066 X S PHYLLIS H MIKHAIL & No ESTATE LARISA KITSAK MERTEN 03/07/2014 $582,000.00 E034638 W S MIKHAIL & JEFFREYA & No LARISA DEBRA TAYLOR MERTEN JEFFREY G & 12/08/2016 $840,000.00 E077451 W S JEFFREY A & No DEBRA PITTMAN JEFFREY O Property Maps Code ITownship Range Section lQuarter Parcel Map INeighborhood 1504000 127 104 05 ISW View parcel maps for this Township/Range/Section I 28 of 29 1 are Poop" f 3r I Mr tM 6.1 i lot i Existing building plan provided by Snohomish County records for Parcel #:00513105800100 for address: 16012 74th PI W, Edmonds, WA 98026 Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -L120 29 of 29 II !lfiilll:Illi1114P1�. ................... Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -1_120