Loading...
REVIEWED BLD2024-0473+STATEMENT OF RISK+4.9.2024_1.19.10_PM+4185704RECEIVED BLD2024-0473 4/11 /2024 -_ REVIEWED - CITY OF EDMONDS BY DEVELOPMENT CITY OF EDMONDS SERVICES DEPARTMENT ? BUILDING DEPARTMENT? .............................................. COBALT Cobalt Geosciences, LLC GEOSCI CES P.O. Box1792 North Bend, WA 98045 January 29, 2024 RR Foundation Specialist Attn: Alesha, Ty -Lynn, Jordan, or Amanda RE: Geotechnical Hazard Statement of Risk Foundation Mitigation 16o12 74tn Place West Edmonds, Washington In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to discuss our review of the provided plans and to provide a statement of risk per City of Edmonds code requirements. In preparation of this letter, we have reviewed the following documents: • Structural plans by Longitude L12o dated September 20, 2023 We have reviewed the provided plans and the information presented appears to include relevant geotechnical information consistent with our findings, typical engineering standards, and recent report/evaluation. The risk of damage to the proposed development and adjacent properties from soil instability will be minimized subject to the conditions set forth in the geotechnical report prepared by Cobalt Geosciences, LLC. The proposed foundation mitigation work will not increase the potential for soil movement provided proper TESC and BMPs are installed properly and maintained until all landscaping and earthwork is completed. This work is a repair of the existing foundation system and will not increase or decrease the risk of instability of the soils in this area and nearby areas. There will always be a risk of soil movements along the slope face where magnitudes exceed about 50 percent and weathered soils are present. At this site, the risk will remain generally low provided slope areas remain fully vegetated and runoff is fully controlled and directed away from the slope areas. Provided these conditions are met, the probability of earth movement within a 25 year period is approximately 5 percent. The amount of movement will likely be restricted to near the slope face and would be less than a few inches over that time period. The site is situated in the southern one-third of the North Edmonds Earth Subsidence and Landslide Hazard Area (NEESLH) per the City map. The work consists of foundation repair and does not include specific measures to mitigate landslide risks. The pier installation work may provide a limited increase in local stability but is primarily intended as a mitigation for vertical foundation movements related to soil settlement. Closure The information presented herein is based upon professional interpretation utilizing standard practices and a degree of conservatism deemed proper for this project. We emphasize that this report is valid for this project as outlined above and for the current site conditions and should not be used for any other site. www.cobaltgeo.com (2o6) 331-1097 January 29, 2024 Page 2 of 2 Geotechnical Letter Sincerely, Cobalt Geosciences, LLC � v ash; X0, 2513 PHILLIP 1/29/2024 Phil Haberman, PE, LG, LEG Principal 0Nry9 vQ�ti� �F W� p. t� J I � �1 �r• 54896 o,�Fss,c►s✓�`v���� ONAL www.cobaltgeo.com (2o6) 331-1097