Project Name: RnR Foundation Specialist Update for 830 Dayton St, Edmonds, WA
Project Number: S230905-2XR
REVISION
Mar 19 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BLD2023-1606
March 12, 2024
To Whom It May Concern,
The previous submitted drawing package for the foundation repair at 830 Dayton St on November 21, 2023
referenced helical pile 5 to stabilize and lift the residence. It was found that this pile location is obstructed
by a water heater and would not need to be installed.
Based on the analysis performed, it has been concluded that the referenced removal of helical pile 5 as
requested is acceptable with the previously provided load requirements. Please reference the updated
Level Survey for clarification.
Sincerely,
Peter Modica, PE
L120 Engineering and Design
Kirkland: 425-636-3313
Dallas: 214-429-3956
Mans Thurfjell, PE