REV1 REVIEWED BLD BLD2024-1064+STRUCTURAL_CALCS+9.13.2024_9.33.37_PM+4500902SIDE WAY
ENGINEERIN
20305 87" Avenue W.
Edmonds, WA 98026
(425)673-4160
September 13, 2024
City of Edmonds Development Services
121 5th Avenue N.
Edmonds, WA 98020
Subject: Permit #BLD2024-1064, Construction Revisions
Project: Edmonds Park Townhomes, 610 Daley Street
To Whom It May Concern,
BLD2024-1064 REVISION
Sep 16 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
............................................ti
REVIEWED
BY
CITY OF EDMONDS
BUILDING DEPARTMENT::
..............................................:
During construction of the dry rot repair under building permit BLD2024-1064, the contractor discovered additional
rot extending into each of beams beyond the joint in question. The contractor removed the portion of each beam
with dry rot and installed new beams without an engineering consultation. As a result, the cantilevered beam was
removed and replaced back to the exterior wall and the deck beam was cut out and lapped mid -span. Based on the
new configuration, a column is required at the exterior deck because the cantilevered beam cannot be replaced as is
extends approximately 14' into the building. The deck beam lapped mid -span will be repaired to support the deck in
conformance with the 2021 IBC.
Please refer to the attached calculations and revised drawings that illustrate the structural requirements for the deck
to be completed as it exists in the current state of construction. A new column will be added between the first and
second floors to support both beams. The cantilevered beam will become a simple span beam and the deck beam
splice will be supplemented with screws and a tension strap for structural integrity.
Once the repairs shown in the structural drawings are implemented, the deck support will conform with the
requirements of the 2021 IBC.
Please feel free to contact me if there are any additional questions or concerns.
Sincerely,
Chris Bernards, PE, SE, LEED AP
Principal
wz�/ v
Edmonds Park Townhomes Construction Revisions
Sidesway Project No. 22105.03
,1117 itFarcvt c-0 /� . r c. ® f4- � e c.-�: �L ,
n/CW coLUrAl,7b AL.iGN j c-�c�J , �xfO V10PPO&" k10 15*67 c LOM
�1 w
10 77z�,3tl MY)
V 3� � l S t'� z l & y L r! 1 L.L
rt
(�x(0 pF"12 ft �� �,a /�v - 07 0,02-
L W0-. 2_/-9 ( ON WAL ) o f - SJ I Ajs P" ,C)tj
SuPPoml,� 6 y 0['4 & (Am-L s 1t c f �:`T (F,//5/Z-L/
P
bi Y\ (0 tnl ,�, � i SPS� �L �O PSFc.L
T �' Gl.�-• 1 �" cuc. (' = � j l� S 9 t� � � `1 ! v�S LL- � �3 ��,��. ��,� �� c:..�
C O L =vS f P, 16-1 LL
Get eC k 6E-Ala10 ca Cc, 5N C
r
T _y? file- 'Z/ _ ! 5 Mo
7,75
Apo t*u? 51 7" = on S ! _ �3/ crss
s r�, 3
(0/v',r lVlr7bS 2'' E14 StOt Of cvl
Za/ �} _ 3
r�*Ib6 N 5;DWC /�60 �yos-S MZ0
Description &AAv1pi n `� �V
SI N By 1 Project No.
Date � i
r1 z z� 5u 3
IDE WAY Project C w MON n/ f Checked Sheet No.
5
ENGINEERING �Jy Date
f
wl
® Z 3'/2 3 �Z d/ Z 5 ; - J�-- '
505 G N- 4- jOIq ASS L ,
3lz
T
v SC 6) yo ' 0 mtw 60
z`= I� L� U3S ✓
0 �--
CZ� vy
,/
CoL uow �(LO� le A, 0 3
1/2s�(,zs
!-7S Z (FAM
Description G n � ,'`V ,. [T U j iO V By /'� Project No.
1 Date
I DE WAY Project nMN0 , + 6 Checked Sheet No.
5ENGINEERING Date