APPROVED ENG BLD2023-1521+Transportation_Impact_Form+11.28.2023_2.12.13_PM+3921645__ddmp�
rECEI'VED
12/1/23,
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
�1�7�1 k)
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmoridswa.gov
Name of Proposed Project:
Owner/Applicant
Tmv , Ume-
BLD2023-1521
APPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
Name
Street/Mailing Address
City —
State 7Zip
Telephone: lo� � � 1 / k \;
Applicant Contact Person:
af-e-a u:h
Name
171� P �5k S w
Street/Mailing Address
�X W.oVJ5 VISOU
City rr State[ Zip
�
Telephone: 1 0 b 357 � J `"
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name Contact Name
Telephone: E-mail:
PROJECT DESCRIPTION rr //�� ,�/� 1 \
a. Location - Street address: b V S /' w h
A1 p U 0 1 (Attach a vicinity map and site plan.)
b. Specify existing land use: `> d``U1n KO-KO-1 O cal — () S L O
C. Specify roposed type and size of development: J 2Hr %%�- 1 kw, 4yo\/ M evO<5
0�) S �,�� (# of'residential units and/or square footage of building)
d. Date construction will begin and be completed: U I / Z3 — I ( — os/Z-�
e. Define proposed access locations:
Define proposed sight distance at site egress locations:
w — _ ! a
HANDOUT UPDATED 05.09.2023
APPENDIX A
Page 2 of 2
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC
3.36.130. Check the applicable box below and calculate the fees as necessary:
® NO CHANGE SPECIALTY RETAIL TO SPECIALTY RETAIL
(LOCATED IN THE BD ZONE)
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
ITE Land Use Category
Per Unit Fee
Rate
New Use
8Jb feum�y ?Zw,
$
Prior Use
l0 cewv k Cif t
$ l D 1
Units in
square feet,
# of dwelli-w
� 0
X1 SOS
Use Fee
New U e $$ Z l�75 - Prior Use Fee: $ �� Q , y = FEE DUE:
❑ NEW DEVELOPMENT
ITE Land Use Category
Per Unit Fee
Rate
New Use
$
U INDEPENDENT FEE CALCULATION
Units in
square feet,
# of dwelling,
vfb. etc.
X
Impact/Mitigation Fee: I $
Independent Review Fee: $296.00 (+ peer review fee) 1 $
FEE DUE
FEE DUE
1 /2/2024
City of Edmonds, Engineering Division Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 05.09,2023