Loading...
APPROVED ENG BLD2023-1521+Transportation_Impact_Form+11.28.2023_2.12.13_PM+3921645__ddmp� rECEI'VED 12/1/23, CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT �1�7�1 k) PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmoridswa.gov Name of Proposed Project: Owner/Applicant Tmv , Ume- BLD2023-1521 APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet Name Street/Mailing Address City — State 7Zip Telephone: lo� � � 1 / k \; Applicant Contact Person: af-e-a u:h Name 171� P �5k S w Street/Mailing Address �X W.oVJ5 VISOU City rr State[ Zip � Telephone: 1 0 b 357 � J `" Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: PROJECT DESCRIPTION rr //�� ,�/� 1 \ a. Location - Street address: b V S /' w h A1 p U 0 1 (Attach a vicinity map and site plan.) b. Specify existing land use: `> d``U1n KO-KO-1 O cal — () S L O C. Specify roposed type and size of development: J 2Hr %%�- 1 kw, 4yo\/ M evO<5 0�) S �,�� (# of'residential units and/or square footage of building) d. Date construction will begin and be completed: U I / Z3 — I ( — os/Z-� e. Define proposed access locations: Define proposed sight distance at site egress locations: w — _ ! a HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ® NO CHANGE SPECIALTY RETAIL TO SPECIALTY RETAIL (LOCATED IN THE BD ZONE) CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category Per Unit Fee Rate New Use 8Jb feum�y ?Zw, $ Prior Use l0 cewv k Cif t $ l D 1 Units in square feet, # of dwelli-w � 0 X1 SOS Use Fee New U e $$ Z l�75 - Prior Use Fee: $ �� Q , y = FEE DUE: ❑ NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use $ U INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfb. etc. X Impact/Mitigation Fee: I $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ FEE DUE FEE DUE 1 /2/2024 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09,2023