Loading...
BLD2024-0281+Energy_Calculations+3.1.2024_10.47.58_AM+4095537MECHANICAL COMPLIANCE SUMMARY 2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all R1 Administered by: @2024 NEEA, All rights reserved Project & Applicant Information Project Title Kim Retail - 2018 WSEC For Building Department Use: ST 101 2399 BLD2024-0281 E 01 RECEIVED Edmonds, WA9802s REVIEWED for Mar 01 2024 Karl Christensen CITY OF EDMONDS 425-374-7052 replacement ONLY DEVELOPMENT SERVICES Office@legacyoneheating.net DEPARTMENT Date: Mar 01, 2024 Project Address REVIEWED BY CITY OF EDMONDS Applicant Name Applicant Phone Applicant Email For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com General Occupancy All Commercial General Building Use Type Entmt/Assembly, Gymnasium Building Cond. Floor Area 3,054 Project Cond. Floor 3,054 General Project Change in Space Conditioning (Low energy or Addition New Building Alteration Single Zone Systems & Area Floors Above Grade 1 Types converted to Fully Conditioned) a Mechanical Scope p Mechanical Scope Equipment Compliance Method 1 - Compliance Method General Mechanical Project Description Economizer DOAS Ventilation Higher Equipment Equipment Efficiency Mechanical Project Type Mechanical Scope Exception(s) Provided. ? Efficiency Option Applied. Compliance Compliance Applied? Verification Scope and Method Change in Space Single Zone Systems & Conditioning Equipment No No NA COMPLIES Additional Efficiency Credits Included (AEC) Does building include occupancy classifications No Does project include DOAS equipment? No requiring DOAS? Based on project scope do TSPR No Do all systems comply with Appendix D standard reference design or qualify for an exception to TSPR? No requirements apply? Scope & Space Conditioning CHANGE IN SPACE CONDITIONING - SINGLE ZONE SYSTEMS & EQUIPMENT Compliance Verification COMPLIES