Loading...
APPROVED ENG BLD2024-0361+Transportation_Impact_Form+3.14.2024_11.55.02_AM+4132056RECEIVED APPENDIX A Mar 14 2024 B L D2024-0361 CITY OFEDMONDS Page 1 of 2 DEVELOPMENT SERVICES DEPARTMENT Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Planet Fitness I Edmonds Owner/Applicant Ohana Growth Partners Name 212 West Padonia Rd Street/Mailing Address Timonium, MD 21093 City State Zip Telephone: 443.418.9019 Applicant Contact Person: Colin Hadaway Name 2948 Sidco Dr Street/Mailing Address Nashville, TN 37204 City State Zip Telephone: 615.244.8170 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address: 22515 Highway 99 (Attach a vicinity map and site plan.) b. Specify existing land use: General Commercial c. Specify proposed type and size of development: Project is an interior renovation of an existing building(#ofresidential units and✓orsquarefootageofbuilding) d. Date construction will begin and be completed: Construction dates are to be determined e. Define proposed access locations: Access will be gained from Highway 99 f Define proposed sight distance at site egress locations: Site egress is approx. 400ft from it HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: X NO CHANGE ITE LAND USE - SHOPPING CENTER TO SHOPPING CENTER NO FEES DUE ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category Per Unit Fee Rate New Use $ Prior Use $ Units in square feet, Use Fee # of dwelling, etc. X = $ X = $ New Use Fee: $ - Prior Use Fee: $ = FEE DUE: $ ' ❑ NEW DEVELOPMENT Per Unit Fee ITE Land Use Category Rate FNew Use $ ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfb, etc. X Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ FEE DUE FEE DUE ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Approval k'JTY&j"411112024 l ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023