Loading...
REV1 BLD2024-0361+Revision_Narrative+6.13.2024_4.22.23_PM+4321855REVISION Jun 14 2024 CITY OF EDMONDS DEVELOPMENT SERVICES Revision Narrative REVISION NARRATIVE - BLD2024-0361 DEPARTMENT Project Name: Planet Fitness — Edmonds, WA Date: 05 June 2024 Project Location: 22515 Highway 99 Project Number: 23450 Edmonds, WA Revision Title: Revision 4 — Kiosk Updates General 1. Sheet G000 a. Cover i. Updated sheet index. 2. Sheet G100 a. Life Safety Plan i. Updated reception layout; 12' kiosk desk with new vending coolers has been added. ii. I.T. has been added to Office 102; annotations have been updated and the Black Card Spa has been adjusted accordingly. iii. A vending cooler has been added into the Black Card Spa. iv. Ab w/ graduated stack (also known as "Abdominal 3") added to equipment floor. v. Room 123 is now Storage. Architectural 1. Sheet A000 a. Equipment Plan i. Updated reception layout; 12' kiosk desk with new vending coolers has been added. ii. I.T. has been added to Office 102; annotations have been updated and the Black Card Spa has been adjusted accordingly. iii. A vending cooler has been added into the Black Card Spa. iv. Ab w/ graduated stack added to equipment floor. v. Room 123 is now Storage. 2. Sheet A001 a. Equipment Schedules i. "Abdominal 3" added to the schedule. 3. Sheet A110 a. Construction Plan i. Updated reception layout; 12' kiosk desk with new vending coolers has been added. ii. I.T. has been added to Office 102; annotations have been updated and the Black Card Spa has been adjusted accordingly. iii. A vending cooler has been added into the Black Card Spa. REVISION Jun 14 2024 CITY OF EDMONDS DEVELOPMENT SERVICES iv. Ab w/ graduated stack added to equipment floor. DEPARTMENT v. Window tags have been updated. vi. Room 123 is now Storage. 4. Sheet A 120 a. Reflected Ceiling Plan i. Updated reception layout; 12' kiosk desk with new vending coolers has been added. Kiosks also include new overhead LED square fixture. ii. I.T. has been added to Office 102; annotations, ceilings, and lighting layouts have in the Black Card Spa have been adjusted accordingly. iii. A vending cooler has been added into the Black Card Spa. iv. Room 123 is now Storage. v. Ceiling Plan Symbols have been updated. 5. Sheet A130 a. Floor Finish Plan i. Updated reception layout; 12' kiosk desk with new vending coolers has been added. ii. I.T. has been added to Office 102; annotations have been updated and the Black Card Spa has been adjusted accordingly. Flooring has been updated in Office and IT. iii. A vending cooler has been added into the Black Card Spa. iv. Room 123 is now Storage. 6. Sheet A131 a. Schedules i. IT, Beauty, and Storage 123 have been updated on the Room Schedule. ii. New paints and wall covering have been added to the Interior Finish Schedule for the kiosk desk. 7. Sheet A210 a. Interior Elevations i. Updated reception layout; 12' kiosk desk with new vending coolers has been added in interior elevations # 1 & #2. 8. Sheet A211 a. Interior Elevations i. Interior elevations #9 through # 12 have been updated. 9. Sheet A410 a. Enlarged Plan & Elevations — Reception i. All plans, elevations, sections, and details have been updated to reflect the new 12' kiosk desk layout. 10. Sheet A420 a. Enlarged Plan & Elevations — BC Spa REVISION Jun 14 2024 CITY OF EDMONDS DEVELOPMENT SERVICES i. All plans, elevations, sections, and details have been updated to reflect T18ARTMENT new layout with the Office, IT, and Beauty room locations as well as the new 12' reception kiosk, and any other slight changes to accommodate the new layout. ii. Window tags have been updated. 11. Sheet A430 a. Enlarged Plans & Elevations — Lockers i. Annotations have been added for sections through lockers. ii. The wall separating the lockers from the main gym floor has been shifted west slightly to accommodate the new kiosk desk and vending coolers. 12. Sheet A431 a. Interior Elevations i. Annotations have been added for sections through lockers. ii. The wall separating the lockers from the main gym floor has been shifted west slightly to accommodate the new kiosk desk and vending coolers. 13. Sheet A432 a. Details — Locker Rooms & Showers i. Section @ Lockers has been added to the sheet. 14. Sheet A610 a. Door Schedules & Details i. IT, Beauty, and Storage 123 have been updated on the Door & Frame Schedule. ii. Window tags have been updated on the Window Legend. End of Narrative Revision Narrative Project Name: EDMONDS, WA Date: 06/05/2024 Project Location: 22515 Highway 99, Edmonds, WA Project Number: 31189 98026 Snohomish County Revision Title: Kiosk Updates Electrical 1. E 101 —ELECTRICAL LIGHTING PLAN a. DETAIL 1 — ELECTRICAL LIGHTING PLAN i. Removed (1) LZ ring light from Reception 101. ii. Removed (2) LZ2 rings light from Reception 101. iii. Added (1) DECW strip light in Reception 101. iv. Added (4) B8 track fixtures in Reception 101. v. Added (1) BCL5A current limiter in Reception 101. vi. Removed (2) FB downlights in Reception 101. vii. Relocated (2) TR exit signs in BC Spa area. viii. Relocated (20) G downlights in BC Spa area. ix. Added (1) G downlights in BC Spa area. x. Relocated (6) H downlights in BC Spa area. xi. Relocated (4) M02 sconce lights in BC Spa area. xii. Relocated (2) MM4 sconce lights in BC Spa area. xiii. Relocated (2) OCS switches in BC Spa area. xiv. Relocated (4) DB switches in BC Spa area. xv. Relocated (5) OSDB switches in BC Spa area. xvi. Relocated (1) DL switch in BC Spa area. xvii. Relocated (2) M05 sconce lights at Womens Lockers 112 entrance. xviii. Relocated (1) F downlight near Utility 114. xix. Relocated (1) O emergency light in Utility 114. xx. Relocated (1) SP switch in Utility 114. xxi. Relocated (2) M04 sconce lights at Mens Lockers 115 entrance. b. LIGHTING FIXTURE SCHEDULE i. Revised count for G type fixture. ii. Added B8, BCL5A,DECW iii. Removed FB, LZ, LZ2 2. E201 — ELECTRICAL POWER PLAN a. DETAIL 1 — ELECTRICAL POWER PLAN REVISION Pa Jun 14°1b24 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT i. Relocated IT room devices from Storage 123 to IT 103. See sheet E202, detail 1. ii. Revised Break 125 power and data requirements note. 3. E202 — ENLARGED ELECTRICAL PLANS a. DETAIL 1 — BLACK CARD SPA POWER PLAN i. Removed (2) quad receptacles and data devices from Reception 101. ii. Relocated (4) quad receptacles and data devices in Reception 101. iii. Relocated (2) duplex receptacles and data devices in Reception 101. iv. Relocated (1) set of TV devices in Reception 101. v. Removed (2) sets of TV devices in Reception 101. vi. Relocated lunk alarm switch in Reception 101. REVISION PaJun �4'�b24 vii. Added (1) duplex for reach in cooler in Reception 101. viii. Added (1) duplex for reach in cooler in BC Spa 104. CITY OF EDMONDS DEVELOPMENT SERVICES ix. Relocated all IT devices to IT 103. DEPARTMENT x. Removed detail 5/E202 callout. xi. Removed (1) cryo bed equipment from Hydro 111. xii. Added (1) hydro bed equipment to Hydro 111. xiii. Relocated (3) hydro beds and equipment in Hydro 111. xiv. Relocated all devices to match new room layout in Tanning 110, Tanning 109, Hybrid 108, Beauty 107, Tanning 106, Massage 105, & Office 102. b. DETAIL 5 — TYPICAL CRYO LOUNGE LAYOUT i. Removed detail from sheet. 4. E501 — ONE -LINE DIAGRAM & SCHEDULES a. PANELBOARD 2P 1 i. Revised circuits 8, 38, & 40 to spare. ii. Revised circuit 22. b. PANELBOARD LD i. Revised circuits 14 & 16. Mechanical 1. M101 a. HVAC Plan i. Revised previous IT 123 room name to Storage 123. ii. Revised ductwork, air devices, and sensor for RTU-3 due to revised layout of the Black Card Area. 2. M201 a. Black Card HVAC Plan i. Revised previous Beauty 110 room to IT 103. ii. Revised previous Future 106 toom to Beauty 107. iii. Revised sensor location for RTU-3. iv. Revised RTU-3 supply and return ductwork. v. Revised air device locations to updated ceiling in all rooms. Plumbing 1. P101 a. Overall Plumbing Floor Plan i. Revised previous IT 123 room name to Storage 123. ii. Revised previous Beauty 110 room to IT 103. iii. Revised previous Future 106 toom to Beauty 107. End of Narrative