Loading...
REV1 BLD2024-0362+Narrative+6.13.2024_4.25.25_PM+4321871Revision Narrative SEE MECHANICAL SHEET NARRATIVE BELOW BLD2024-0362 Project Name: EDMONDS, WA Date: 06/05/2024 Project Location: 22515 Highway 99, Edmonds, WA Project Number: 31189 98026 Snohomish County Revision Title: Kiosk Updates Electrical 1. E 101 —ELECTRICAL LIGHTING PLAN a. DETAIL 1 — ELECTRICAL LIGHTING PLAN i. Removed (1) LZ ring light from Reception 101. ii. Removed (2) LZ2 rings light from Reception 101. iii. Added (1) DECW strip light in Reception 101. iv. Added (4) B8 track fixtures in Reception 101. v. Added (1) BCL5A current limiter in Reception 101. vi. Removed (2) FB downlights in Reception 101. vii. Relocated (2) TR exit signs in BC Spa area. viii. Relocated (20) G downlights in BC Spa area. ix. Added (1) G downlights in BC Spa area. x. Relocated (6) H downlights in BC Spa area. xi. Relocated (4) M02 sconce lights in BC Spa area. xii. Relocated (2) MM4 sconce lights in BC Spa area. xiii. Relocated (2) OCS switches in BC Spa area. xiv. Relocated (4) DB switches in BC Spa area. xv. Relocated (5) OSDB switches in BC Spa area. xvi. Relocated (1) DL switch in BC Spa area. xvii. Relocated (2) M05 sconce lights at Womens Lockers 112 entrance. xviii. Relocated (1) F downlight near Utility 114. xix. Relocated (1) O emergency light in Utility 114. xx. Relocated (1) SP switch in Utility 114. xxi. Relocated (2) M04 sconce lights at Mens Lockers 115 entrance. b. LIGHTING FIXTURE SCHEDULE i. Revised count for G type fixture. ii. Added B8, BCL5A,DECW iii. Removed FB, LZ, LZ2 Page 1 of 2 REVISION Jun 14 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 2. E201 — ELECTRICAL POWER PLAN a. DETAIL 1 — ELECTRICAL POWER PLAN i. Relocated IT room devices from Storage 123 to IT 103. See sheet E202, detail 1. ii. Revised Break 125 power and data requirements note. 3. E202 — ENLARGED ELECTRICAL PLANS a. DETAIL 1 — BLACK CARD SPA POWER PLAN i. Removed (2) quad receptacles and data devices from Reception 101. ii. Relocated (4) quad receptacles and data devices in Reception 101. iii. Relocated (2) duplex receptacles and data devices in Reception 101. iv. Relocated (1) set of TV devices in Reception 101. v. Removed (2) sets of TV devices in Reception 101. vi. Relocated lunk alarm switch in Reception 101. Page 2 of 2 vii. Added (1) duplex for reach in cooler in Reception 101. REVISION viii. Added (1) duplex for reach in cooler in BC Spa 104. ix. Relocated all IT devices to IT 103. Jun 14 2024 x. Removed detail 5/E202 callout. CITY OF EDMONDS xi. Removed (1) cryo bed equipment from Hydro 1 11. DEVELOPMENT SERVICES DEPARTMENT xii. Added (1) hydro bed equipment to Hydro 111. xiii. Relocated (3) hydro beds and equipment in Hydro 111. xiv. Relocated all devices to match new room layout in Tanning 110, Tanning 109, Hybrid 108, Beauty 107, Tanning 106, Massage 105, & Office 102. b. DETAIL 5 — TYPICAL CRYO LOUNGE LAYOUT i. Removed detail from sheet. 4. E501 — ONE -LINE DIAGRAM & SCHEDULES a. PANELBOARD 2P 1 i. Revised circuits 8, 38, & 40 to spare. ii. Revised circuit 22. b. PANELBOARD LD i. Revised circuits 14 & 16. Mechanical 1. M101 a. HVAC Plan i. Revised previous IT 123 room name to Storage 123. ii. Revised ductwork, air devices, and sensor for RTU-3 due to revised layout of the Black Card Area. 2. M201 a. Black Card HVAC Plan i. Revised previous Beauty 110 room to IT 103. ii. Revised previous Future 106 toom to Beauty 107. iii. Revised sensor location for RTU-3. iv. Revised RTU-3 supply and return ductwork. v. Revised air device locations to updated ceiling in all rooms. Plumbing 1. P101 a. Overall Plumbing Floor Plan i. Revised previous IT 123 room name to Storage 123. ii. Revised previous Beauty 110 room to IT 103. iii. Revised previous Future 106 toom to Beauty 107. End of Narrative