APPROVED BLD BLD2024-1100+Mechanical_Plan+8.22.2024_3.38.53_PM+4457930August 22nd 2024
Job Location:
Armadillo Storage
23031 Hwy 99
Edmonds WA 98026
206.793.6536
City Of Edmonds
Building Department
Work MECHANICAL
Address 23031 HIGHWAY 99
Owner ARMADILLO STORAGE
--------------------
Approved Date 8/2712024
___________________
Building Official �QH,QypJt -f
Permit Number BLD2024-1100
Owner Information:
Azose Commerical Properties
8451 SE 68th St Suite 200
Mercer Island, WA 98040
Unit Access and details:
See front desk employee
Building C
Aprox sgft 45,000
1-P 1-hA!\/A-9MAP tF
JANES"Ifit"Ms",�=
�
8227 44th Ave W Suite J
Mukilteo, WA 98275
RECEIVED
Aug 23 2024
......................................
Boiler Installed: oFE"Mo"=
ALL WORK SUBJECT OBTAIN ELECTRICAL
INSPE II�UN FDR STATEIABOR&
CODE COmeLiaNCE
Lochivnar FTX 60ON 600,000 BTUs Input"EPp"f��E"f
INDUSTRIES
570,000 BTUs Output
APP---ROVED-
PLANSMUSTBE
New CPVC Venting System
NJOB SITE
ON, .B
Low Water Cutoff
High Limit Manual Reset
Boiler Installed:
Secondary piping and mechanical was
originally installed by Janes Company
and will receive new ASME expansion
tank and circulator pump / relay.
E
D -
Air Inlet Electrical Connections
am{
4-1107T��000
-1/2" C
C
Gas Connection /
G Water Outlet
Water Inlet
\Flue Connection
1, \ \ i
F
FTXL Boiler
H
BY MODEL NUMBER This model is:
FTX 850 N M13 FTXL Fire Tube boiler
85o,000 Btu/hr
l , -O 4. 0°
p% bGr0 d� 0 - Natural gas
mf� as o M13 Firing Controls
40" [1LJJI
k�: - 7:-d
9-+ /4"I
2-1/2" Condensate Connection
Dimensions and Specifications
z
LI 40.0 399.9
98.0%
392
341
10:1
10
105
13
30.1/2"
27.1/2"
10.1/4"
17"
23.1/4"
46.1/4"
39.1/2"
10.3/4'
2"
4"
4"
1" 435
L) 50.0 500.0
97.7%
489
425
10:1
15
105
12
30-1/2"
27-1/2"
10-l/C
17"
23-1/4"
46-1/4"
39-1/2"
10-3/4"
2"
4"
4"
1° 460
L) 85.0 600.0
97.5%
585
509
7:1
15
105
12
30.1/2"
27-1/2"
10-1/4"
17"
23-1/4"
46.1/4"
39-1/2"
10.3/4"
2"
4"
4"
1" 470
L) 103.5 725.0
97.2%
705
613
7:1
20
150
17
33"
28.1/2"
10.1/2"
17.1/2"
23.1/2"
48.1/2"
41-1/4"
11"
2.1/2"
6"
4"
1" 510
L) 121.5 850.0
97.0%
825
717
7:1
25
150
16
33"
28.1/2"
101/2"
17.1/2"
23-1/2"
48-1/2"
411/4"
11"
2.1/2"
6"
4"
1" 535
subject to change without notice. Dimensions are in inches. Select "N" or "L" for Natural or LP gas. *The Net AHRI Water Ratings shown are based on a piping and pickup allowancof 1.15. *Lochinvar
suited before selecting a boiler for installations having unusual piping and pickup requirements, such as intermittent system operation, extensive piping systems, etc. *The ratings have been
nder the provisions governing forced draft burners.
August 22nd 2024
Job location:
Armadillo Storage
23031 Hwy 99
Edmonds WA 98026
206.793.6536
Owner Information:
Azose Commerical Properties
8451 SE 68th St Suite 200
Mercer Island, WA 98040
Unit Access and details:
See front desk employee
Building C
Aprox sgft 45,000
A NER
iri�%ii"i�ii
HEATING SYSTEMS
8227 44th Ave W Suite J
Mukilteo, WA 98275
RECEIVED
Boiler Installed: Aug 2320245
Lochivnar FTX 60ON 600,000 BTUs InputEEM
570,000 BTUs Output
New CPVC Venting System
Low Water Cutoff
High Limit Manual Reset
Boiler Installed:
Secondary piping and mechanical was
originally installed by Janes Company
and will receive new ASME expansion
tank and circulator pump / relay.
Original Boiler:
RAYPAK 600,000 BTU Input
Standard Efficiency
BOILER LOCATION