Loading...
APPROVED BLD BLD2024-1100+Mechanical_Plan+8.22.2024_3.38.53_PM+4457930August 22nd 2024 Job Location: Armadillo Storage 23031 Hwy 99 Edmonds WA 98026 206.793.6536 City Of Edmonds Building Department Work MECHANICAL Address 23031 HIGHWAY 99 Owner ARMADILLO STORAGE -------------------- Approved Date 8/2712024 ___________________ Building Official �QH,QypJt -f Permit Number BLD2024-1100 Owner Information: Azose Commerical Properties 8451 SE 68th St Suite 200 Mercer Island, WA 98040 Unit Access and details: See front desk employee Building C Aprox sgft 45,000 1-P 1-hA!\/A-9MAP tF JANES"Ifit"Ms",�= � 8227 44th Ave W Suite J Mukilteo, WA 98275 RECEIVED Aug 23 2024 ...................................... Boiler Installed: oFE"Mo"= ALL WORK SUBJECT OBTAIN ELECTRICAL INSPE II�UN FDR STATEIABOR& CODE COmeLiaNCE Lochivnar FTX 60ON 600,000 BTUs Input"EPp"f��E"f INDUSTRIES 570,000 BTUs Output APP---ROVED- PLANSMUSTBE New CPVC Venting System NJOB SITE ON, .B Low Water Cutoff High Limit Manual Reset Boiler Installed: Secondary piping and mechanical was originally installed by Janes Company and will receive new ASME expansion tank and circulator pump / relay. E D - Air Inlet Electrical Connections am{ 4-1107T��000 -1/2" C C Gas Connection / G Water Outlet Water Inlet \Flue Connection 1, \ \ i F FTXL Boiler H BY MODEL NUMBER This model is: FTX 850 N M13 FTXL Fire Tube boiler 85o,000 Btu/hr l , -O 4. 0° p% bGr0 d� 0 - Natural gas mf� as o M13 Firing Controls 40" [1LJJI k�: - 7:-d 9-+ /4"I 2-1/2" Condensate Connection Dimensions and Specifications z LI 40.0 399.9 98.0% 392 341 10:1 10 105 13 30.1/2" 27.1/2" 10.1/4" 17" 23.1/4" 46.1/4" 39.1/2" 10.3/4' 2" 4" 4" 1" 435 L) 50.0 500.0 97.7% 489 425 10:1 15 105 12 30-1/2" 27-1/2" 10-l/C 17" 23-1/4" 46-1/4" 39-1/2" 10-3/4" 2" 4" 4" 1° 460 L) 85.0 600.0 97.5% 585 509 7:1 15 105 12 30.1/2" 27-1/2" 10-1/4" 17" 23-1/4" 46.1/4" 39-1/2" 10.3/4" 2" 4" 4" 1" 470 L) 103.5 725.0 97.2% 705 613 7:1 20 150 17 33" 28.1/2" 10.1/2" 17.1/2" 23.1/2" 48.1/2" 41-1/4" 11" 2.1/2" 6" 4" 1" 510 L) 121.5 850.0 97.0% 825 717 7:1 25 150 16 33" 28.1/2" 101/2" 17.1/2" 23-1/2" 48-1/2" 411/4" 11" 2.1/2" 6" 4" 1" 535 subject to change without notice. Dimensions are in inches. Select "N" or "L" for Natural or LP gas. *The Net AHRI Water Ratings shown are based on a piping and pickup allowancof 1.15. *Lochinvar suited before selecting a boiler for installations having unusual piping and pickup requirements, such as intermittent system operation, extensive piping systems, etc. *The ratings have been nder the provisions governing forced draft burners. August 22nd 2024 Job location: Armadillo Storage 23031 Hwy 99 Edmonds WA 98026 206.793.6536 Owner Information: Azose Commerical Properties 8451 SE 68th St Suite 200 Mercer Island, WA 98040 Unit Access and details: See front desk employee Building C Aprox sgft 45,000 A NER iri�%ii"i�ii HEATING SYSTEMS 8227 44th Ave W Suite J Mukilteo, WA 98275 RECEIVED Boiler Installed: Aug 2320245 Lochivnar FTX 60ON 600,000 BTUs InputEEM 570,000 BTUs Output New CPVC Venting System Low Water Cutoff High Limit Manual Reset Boiler Installed: Secondary piping and mechanical was originally installed by Janes Company and will receive new ASME expansion tank and circulator pump / relay. Original Boiler: RAYPAK 600,000 BTU Input Standard Efficiency BOILER LOCATION