APPROVED ENG Transportation_Impact_Form+11.8.2022_2.01.54_PM+3209802flic'. I Sqv
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 42 5.771.0220
APPENDIX A
Page 1 of 2
Transportation Impact Analysis
RECEIVED
Worksheet
Name of Proposed Project: "h O_ �oy 1 — L--
Owner/Applicant
i� �2, ►L �. �- hn � 10�
Name
11 02zo 93►-- t,�VE W .
Street/Mailing Address
Qg191ywoCLD W-i $off
City State Zip
Applicant Contact Person:
Name
S 4GO
Street/Mailing Address
City State Zip
Telephone: L�Z� -�-)8 ` -1 I I Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location - Street address: I b 23ti' 2_' -2_xb 3)L btu 5\/J
ttach a vicinity map and site plan.)
b. Specify existing land use: J 1 U)''
Nov 16 2022
CITY
LOPM NT SER
ONDS
DEVELOPMENT
DEPARTMENT
c. Specify proposed type and size of development:
of residential units and/or square footage of building)
d. Date construction will begin and be completed: 3 — �2
e. Define proposed access locations: ► tH s&2j O I 1� T 2.w Z,Iy
HANDOUT UPDATED 09.02.2021
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations:
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in LCDC 3.36.125, except as otherwise provided for independent fee calculations in I:( IA
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate # of dwelling,
of , etc.
New Use ' $ b h4 q , I X _ $ �Z
Prior Use $ X = $
New Use Fee: $ - Prior Use Fee: $ _ $ L 2. yi
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
of , etc.
New Use $ X =
❑ NO CHANGE
❑ INDEPENDENT FEE CALCULATION
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
TOTAL TRANSPORTATION IMPACT FEE
$
ENGINEERING DIVISION
APPROVED AS NOTED
City of Edmonds, Engineering Division Approval Date
JdJ W�A� 04/05/2023
VV
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
so
HANDOUT UPDATED 09.02.2021