Loading...
APPROVED ENG Transportation_Impact_Form+11.8.2022_2.01.54_PM+3209802flic'. I Sqv PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 42 5.771.0220 APPENDIX A Page 1 of 2 Transportation Impact Analysis RECEIVED Worksheet Name of Proposed Project: "h O_ �oy 1 — L-- Owner/Applicant i� �2, ►L �. �- hn � 10� Name 11 02zo 93►-- t,�VE W . Street/Mailing Address Qg191ywoCLD W-i $off City State Zip Applicant Contact Person: Name S 4GO Street/Mailing Address City State Zip Telephone: L�Z� -�-)8 ` -1 I I Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address: I b 23ti' 2_' -2_xb 3)L btu 5\/J ttach a vicinity map and site plan.) b. Specify existing land use: J 1 U)'' Nov 16 2022 CITY LOPM NT SER ONDS DEVELOPMENT DEPARTMENT c. Specify proposed type and size of development: of residential units and/or square footage of building) d. Date construction will begin and be completed: 3 — �2 e. Define proposed access locations: ► tH s&2j O I 1� T 2.w Z,Iy HANDOUT UPDATED 09.02.2021 APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in LCDC 3.36.125, except as otherwise provided for independent fee calculations in I:( IA ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Fee Rate # of dwelling, of , etc. New Use ' $ b h4 q , I X _ $ �Z Prior Use $ X = $ New Use Fee: $ - Prior Use Fee: $ _ $ L 2. yi ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, of , etc. New Use $ X = ❑ NO CHANGE ❑ INDEPENDENT FEE CALCULATION MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ TOTAL TRANSPORTATION IMPACT FEE $ ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Approval Date JdJ W�A� 04/05/2023 VV ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. so HANDOUT UPDATED 09.02.2021