Loading...
ENG CORRECTION NOTICE 9.26.2024of EDA1 0 St. l o z CITY OF EDMONDS CORRECTION NOTICE ENGINEERING DIVISION (425)771-0220 City Website: www.edmondswa.gov DATE: 9/26/2024 PERMIT NUMBER: BLD2022-0989 OWNER: Village Life LLC SITE CONTACT: Ronan Rafferty ADDRESS: 10234 242" d Pl SW TYPE OF INSPECTION: FINAL INSPECTION ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ® RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR 1. Prior to receiving final construction approval from the Engineering Division, a fire/aid address sign shall be installed with the house address at the end of the driveway. This sign shall be made per Edmonds standard detail TR-570. The city can provide the sign for a $119.00 fabrication fee. If you would like the city to provide the sign please email engineeringpermits (a, edmondswa. gov. 2. Provide a new stormwater covenant draft for the city to review prior to recording with Snohomish County. The city will sign the stormwater covenant for the applicant to get recorded with Snohomish County. Once recorded return a copy of the recorded document to the city. 3. Provide an asbuilt drawing from the project engineer. THE ACTIONS OR CORRECTIONSINDICATED ABOVE ARE REQUIRED TO BE CORRECTED BY: prior to final approval OR PENALTIES MAY BE APPLIED. FOR INSPECTION SCHEDULE THROUGH Mbuildingpermit.com Inspector: Jeff Whatmore Date: 9/26/2024