REVIEWED BLD2024-0809+Structural_Analysis_or_Calculations+6.18.2024_1.16.10_PM+4329847C BLD2024-0809 RECEIVED civil & structural REVIEWED 6/18/24 ENGINEERING engineering &planning BY CITY OF EDMONDS BUILDING DEPARTMENT: ............................................... STRUCTURAL OBSERVATION REPORT DEVELOPMENT Project: Park Place Condo Unit D101 Purpose: Structural Evaluation Location: 8615 238" St. Unit D101, Edmonds, WA Date: 4/25/2024 CG Project: 24142.10 Report: 1 Client: Alan Ayon-Torres, Morris Management General Contractor: Erik Carlson, PureDry Restoration Field Rep: Laura Safford, PE PURPOSE AND SCOPE A field representative of CG Engineering was on site on April 25, 2024, to evaluate cut wood floor joists that were discovered upon partial removal of the drywall finishes within Unit D101. It is our understanding that the drywall had been removed as part of a repair project. EXISTING BUILDING The existing unit is located at the first floor of a three-story multi -family building originally constructed in 1987. The existing structure's roof and floor framing consist of sawn lumber joists supported on sawn lumber beams, posts, and stud walls. The foundation system is assumed to consist of concrete slab on grade and conventional concrete spread footings. At the time of our site visit, the gypsum wall and ceiling finishes had been removed over a portion of Unit D101, including over the bathroom, front bedroom, and a portion of the hallway and kitchen. OBSERVATIONS & RECOMMENDATIONS Cut Floor Joists — (2) floor joists above the bathroom were observed to be significantly notched (refer to Photo 2). The full depth of the joists was cut out in order to route plumbing servicing the unit above. This condition will require repair. We recommend blocking out around the plumbing, which will involve sintering the (2) joists adjacent to the notched joists and installing new beams and hangers to resupport the existing cut joists. Refer to Detail Sketch SK-1 for more detail regarding the recommended repairs. Pi in — The piping appeared to show signs of corrosion in some locations. The plumbing should be inspected for leaking and repaired or replaced as required. kNj�AL � 5/2/24 DISCLAIMER This observation is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation. This report does not warrant or guarantee that all conditions were discovered at the time of the observation. This report was prepared subject to the standard of care applicable to professional services at the time the services were provided. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 I f.425.778.5536 www.cgengineering.com Park Place Condo Unit D101 CG Project No.: 24142.10 May 2, 2024 Page 2 of 2 j- V W.V� "V Photo 1— Aerial Image of Project Site -------y Photo 2 — Cut Floor Joists 250 4th Avenue South, Suite 200 CM Edmonds, WA 98020 ENGINEERING ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com n r n n r%r%R A EXIST PIPING SIMPSON LUS HANGER, TYP 3 MAX TYP aL LL LL 0 0 x x " - F- SISTER NEW JOIST TO J L J L EXIST W/ (2) ROWS 16d NAILS @ 12" OC IN STAGGERED ROWS, TYP 2'-10"± BATHROOM 13'-11"± EXIST 2x10 @ 16" OC FLOOR JOIST 2x10 HF#2 2x10 HF#2 UNIT D101 PARTIAL FLOOR PLAN SCALE: 1/4" = 1'-0" r•i nrrr 0 cx N X w NOTE: 1. CONTRACTOR FIELD VERIFY FLOOR PLAN ABOVE MATCHES UNIT D101 FLOOR PLAN. NOTIFY ENGINEER IF CONDITIONS DIFFER FOR POSSIBLE REDESIGN. �ZS M. TI OF WAS�I ?� 0611,5124 CPARK Illm ENGINEERING PLACE CONDOMINIMUMS 8615 238TH ST SW UNIT D101 EDMONDS, WA 98026 DATE 06/18/24 SHEET PROJECT NO. 24142.10 SCALE 1/4" = 1•-o" 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 TITLE STRUCTURAL DETAILS DRAWN BY JEC S K _ 1 CHECKED BY LMS APPROVED BY DMT ��o���:n�avwi5im�aerlm�.y aIi