STRUCTURAL OBSERVATION REPORT DEVELOPMENT
Project: Park Place Condo Unit D101
Purpose: Structural Evaluation
Location: 8615 238" St. Unit D101, Edmonds, WA
Date: 4/25/2024
CG Project: 24142.10
Report: 1
Client: Alan Ayon-Torres, Morris Management
General Contractor: Erik Carlson, PureDry Restoration
Field Rep: Laura Safford, PE
PURPOSE AND SCOPE
A field representative of CG Engineering was on site on April 25, 2024, to evaluate cut wood floor
joists that were discovered upon partial removal of the drywall finishes within Unit D101. It is our
understanding that the drywall had been removed as part of a repair project.
EXISTING BUILDING
The existing unit is located at the first floor of a three-story multi -family building originally constructed
in 1987. The existing structure's roof and floor framing consist of sawn lumber joists supported on sawn
lumber beams, posts, and stud walls. The foundation system is assumed to consist of concrete slab on
grade and conventional concrete spread footings. At the time of our site visit, the gypsum wall and
ceiling finishes had been removed over a portion of Unit D101, including over the bathroom, front
bedroom, and a portion of the hallway and kitchen.
OBSERVATIONS & RECOMMENDATIONS
Cut Floor Joists — (2) floor joists above the bathroom were observed to be significantly notched
(refer to Photo 2). The full depth of the joists was cut out in order to route plumbing servicing
the unit above. This condition will require repair. We recommend blocking out around the
plumbing, which will involve sintering the (2) joists adjacent to the notched joists and installing
new beams and hangers to resupport the existing cut joists. Refer to Detail Sketch SK-1 for more
detail regarding the recommended repairs.
Pi in — The piping appeared to show signs of corrosion in some locations. The plumbing should
be inspected for leaking and repaired or replaced as required.
kNj�AL � 5/2/24
DISCLAIMER
This observation is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation.
This report does not warrant or guarantee that all conditions were discovered at the time of the observation. This report was prepared subject
to the standard of care applicable to professional services at the time the services were provided.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425.778.8500 I f.425.778.5536
www.cgengineering.com
Park Place Condo Unit D101
CG Project No.: 24142.10
May 2, 2024
Page 2 of 2
j-
V
W.V� "V
Photo 1— Aerial Image of Project Site
-------y
Photo 2 — Cut Floor Joists
250 4th Avenue South, Suite 200
CM Edmonds, WA 98020
ENGINEERING ph.425.778.8500 1 f.425.778.5536
www.cgengineering.com
n r n n r%r%R A
EXIST PIPING
SIMPSON LUS
HANGER, TYP
3 MAX
TYP
aL
LL LL
0 0
x x
" -
F-
SISTER NEW JOIST TO
J
L J
L
EXIST W/ (2) ROWS 16d
NAILS @ 12" OC IN
STAGGERED ROWS, TYP
2'-10"±
BATHROOM
13'-11"±
EXIST 2x10 @ 16" OC
FLOOR JOIST
2x10 HF#2
2x10 HF#2
UNIT D101 PARTIAL FLOOR PLAN
SCALE: 1/4" = 1'-0"
r•i nrrr
0
cx
N
X
w
NOTE:
1. CONTRACTOR FIELD VERIFY FLOOR PLAN ABOVE MATCHES UNIT D101 FLOOR PLAN.
NOTIFY ENGINEER IF CONDITIONS DIFFER FOR POSSIBLE REDESIGN.
�ZS M. TI
OF WAS�I ?�
0611,5124
CPARK
Illm
ENGINEERING
PLACE CONDOMINIMUMS
8615 238TH ST SW UNIT D101
EDMONDS, WA 98026
DATE 06/18/24
SHEET
PROJECT NO. 24142.10
SCALE 1/4" = 1•-o"
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
TITLE
STRUCTURAL DETAILS
DRAWN BY JEC
S K _ 1
CHECKED BY LMS
APPROVED BY DMT