Loading...
APPROVED ENG RESUB1 BLD2024-0989+TRANSPORTATION_IMPACT+9.5.2024_5.12.20_PM+4483610RESUB 10.1 D ZIyz90A[.8!] CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Owner/Applicant CL W!1 a- Name IJ 4 ® 9 12 4(t, P1, /y . Street/Mailing Address City State Zip Telephone: _06 39 5f S_qS`% Applicant Contact Person: og81 S Q vu ,e Name Street/Mailing Address City State Zip Telephone: Scz Rutz... Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address: 80 -1 12 44- Pi N, , 944,OA&W & a vicinity map and site plan.) b. Specify existing land use: c. Specify proposed type and size tof development: n 9) Y1.le #77 � U �� ��7� i c c cr°5'6s► 1 (# of residential units and/or square footage of building) d. Date construction will begin and be completed: e. Define proposed access locations VWi e f. Define proposed sight distance at site egress locations: I/dANA HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ❑ NO CHANGE CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. I d Use Category Per Unit Fee Rate New Use 7—is- $ Prior Use 24J) _ S i $ �7a Units in square feet, # of dw g, etc. xI I = 1 $ =W [New U ee: $ 3 ! Z#. - Prior Use Fee: $ FEE DUE: $ ❑ NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use 215 - ADU $ 3,124.57 ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfp, etc. ii Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ ENGINEERING DIVISION APPROVED AS NOTED Use Fee FEE DUE FEE DUE 10/08/2024 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023