APPROVED ENG RESUB1 BLD2024-0989+TRANSPORTATION_IMPACT+9.5.2024_5.12.20_PM+4483610RESUB
10.1 D ZIyz90A[.8!]
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
APPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project:
Owner/Applicant
CL W!1 a-
Name IJ
4 ® 9 12 4(t, P1, /y .
Street/Mailing Address
City State Zip
Telephone: _06 39 5f S_qS`%
Applicant Contact Person: og81
S Q vu ,e
Name
Street/Mailing Address
City
State Zip
Telephone: Scz Rutz...
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location - Street address: 80 -1 12 44- Pi N, , 944,OA&W &
a vicinity map and site plan.)
b. Specify existing land use:
c. Specify proposed type and size tof development: n 9) Y1.le #77 � U ��
��7� i c c cr°5'6s► 1 (# of residential units and/or square footage of building)
d. Date construction will begin and be completed:
e. Define proposed access locations
VWi e
f. Define proposed sight distance at site egress locations: I/dANA
HANDOUT UPDATED 05.09.2023
APPENDIX A
Page 2 of 2
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC
3.36.130. Check the applicable box below and calculate the fees as necessary:
❑ NO CHANGE
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
I d Use Category
Per Unit Fee
Rate
New Use
7—is-
$
Prior Use
24J) _ S i
$ �7a
Units in
square feet,
# of dw g,
etc.
xI I = 1 $
=W
[New U ee: $ 3 ! Z#. - Prior Use Fee: $ FEE DUE: $
❑ NEW DEVELOPMENT
ITE Land Use Category
Per Unit Fee
Rate
New Use
215 - ADU
$ 3,124.57
❑ INDEPENDENT FEE CALCULATION
Units in
square feet,
# of dwelling,
vfp, etc.
ii
Impact/Mitigation Fee: 1 $
Independent Review Fee: $296.00 (+ peer review fee) 1 $
ENGINEERING DIVISION
APPROVED AS NOTED
Use Fee
FEE DUE
FEE DUE
10/08/2024
City of Edmonds, Engineering Division Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 05.09.2023