Loading...
APPROVED ENG BLD2022-1279+Transportation_Impact_Form+9.16.2022_9.48.29_PM+3114403RECEIVED Oct 06 2022 �iF r. ►�q CITY OF EDMOND�S� z! DEVELOPMENT SERVI ES DEPARTMENT _ d _ in Ctqo PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 BLD2022-1279 APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet Name of Proposed Project: Goodnight - New SFR Owner/Applicant Brian Goodnight Name 737 Aloha St Street/Mailing Address Edmonds, WA 98020 City State Zip Telephone: (206) 954-4145 Applicant Contact Person: Lee A. Michaelis Name P.O. Box 65198 Street/Mailing Address Shoreline, WA, 98155 City State Zip Telephone: (425) 830-1046 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Not Applicable Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address: 741 Aloha St Edmonds, WA 98020 See Pages 3 & 4 for Vicinity Map & Site Plan (Attach a vicinity map and siteplan.) b. Specify existing land use: Vacant, Undeleveloped Land c. Specify proposed type and size of development: One detached single family residence 3,393 sf (# of residential units and/or square footage of building) d. Date construction will begin and be completed: January 2022June 2023 e. Define proposed access locations: Seven feet from east property line along Aloha St. HANDOUT UPDATED 09.02.2021 APPENDIX A Page 2 of 2 f Define proposed sight distance at site egress locations: Clear site distance looking eastbound to curve in roadway, approximately 170 feet. Clear site distance looking west bound along Aloha St. to intersection with tAve N is approximately 425. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X Prior Use $ X New Use Fee: $ 1 - I Prior Use Fee: $ 1 _ 1 $ X NEW DEVELOPMENT Fee Units in ITE Land Use Category Per Unit square feet, Fee Fee Rate # of dwelling, vfp, etc. New Use 210 $ 6,249.14 X I = $ $6,249.14 ❑ NO CHANGE ❑ INDEPENDENT FEE CALCULATION MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ ENGINEERING DIVISION APPROVED AS NOTED TOTAL TRANSPORTATION IMPACT FEE $ INkAt l aU 06/14/2023 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 09.02.2021 Contact: Lee A. Michaelis Puget Sound Planning, LLC 741 Aloha St Gondninht SFR Dn Rnv r",IQR