APPROVED ENG BLD2022-1279+Transportation_Impact_Form+9.16.2022_9.48.29_PM+3114403RECEIVED
Oct 06 2022 �iF r. ►�q
CITY OF EDMOND�S� z!
DEVELOPMENT SERVI ES
DEPARTMENT _ d _
in Ctqo
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
BLD2022-1279
APPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
Name of Proposed Project: Goodnight - New SFR
Owner/Applicant
Brian Goodnight
Name
737 Aloha St
Street/Mailing Address
Edmonds, WA 98020
City State Zip
Telephone: (206) 954-4145
Applicant Contact Person:
Lee A. Michaelis
Name
P.O. Box 65198
Street/Mailing Address
Shoreline, WA, 98155
City State Zip
Telephone: (425) 830-1046
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Not Applicable
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location - Street address: 741 Aloha St Edmonds, WA 98020
See Pages 3 & 4 for Vicinity Map & Site Plan (Attach a vicinity map and siteplan.)
b. Specify existing land use: Vacant, Undeleveloped Land
c. Specify proposed type and size of development: One detached single family residence 3,393 sf
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed: January 2022June 2023
e. Define proposed access locations: Seven feet from east property line along Aloha St.
HANDOUT UPDATED 09.02.2021
APPENDIX A
Page 2 of 2
f Define proposed sight distance at site egress locations: Clear site distance looking eastbound
to curve in roadway, approximately 170 feet. Clear site distance looking west bound along
Aloha St. to intersection with tAve N is approximately 425.
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC
3.36.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
Prior Use $ X
New Use Fee: $ 1 - I Prior Use Fee: $ 1 _ 1 $
X NEW DEVELOPMENT
Fee
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate # of dwelling,
vfp, etc.
New Use 210 $ 6,249.14 X I = $ $6,249.14
❑ NO CHANGE
❑ INDEPENDENT FEE CALCULATION
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
ENGINEERING DIVISION
APPROVED AS NOTED TOTAL TRANSPORTATION IMPACT FEE
$
INkAt l aU 06/14/2023
City of Edmonds, Engineering Division Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 09.02.2021
Contact: Lee A. Michaelis
Puget Sound Planning, LLC 741 Aloha St
Gondninht SFR Dn Rnv r",IQR