Loading...
Building PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 27042900302700 Site Address: 22315 HIGHWAY 99 UNIT H EDMONDS,WA 98026 Applied: 9/20/2024 Subdivision: Lot: 0 Issued: 10/23/2024 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 10/23/2026 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: PLUMBING FOR NEW VETERINARY OFFICE T/I: BLD2024-1206 I WA State Contractor L & I #: LOCALPC79107 I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT MIKE SATKO 1496, MAPLE VALLEY WA 98038 (425)432-6647 MIKESATKO@OUTLOOK.COM CONTACT LOCAL PLUMBING AND 1496, MAPLE VALLEY WA 98038 (425)432-6647 mikesatko@outlook.com CONCTRUCTION INC. LOCAL PLUMBING &CONST PO BOX 1496, MAPLE VALLEY CONTRACTOR (310)982-8557 mikesatko@outlook.com INC WA 98038 10120 NE 59TH ST, KIRKLAND OWNER PACIFIC PLAZA LLC WA 98033 11L FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# BACKFLOW - 2 INCH 001.000.345.83.000.00 $40.00 $40.00 10/23/24 R40821 BLD - PER RE -INSPECTION 001.000.345.83.000.00 $132.00 $132.00 10/23/24 R40821 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 9/20/24 R40174 PERMIT COMMERCIAL PLUMBING - PLAN 001.000.345.83.000.00 $189.00 $189.00 10/23/24 R40821 REVIEW - 3.1.23 EACH PLUMBING FIXTURE ON ONE 001.000.345.83.000.00 $68.00 $68.00 10/23/24 R40821 TRAP PLUMBING BASE FEE 001.000.322.10.000.00 $57.00 $57.00 9/20/24 R40174 WATER HEATER - INC EXPANSION 001.000.345.83.000.00 $17.00 $17.00 10/23/24 R40821 TANK TOTALS: $548.00 $548.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, October 23, 2024 10:21:59 AM 1 of 2 PLUMBING Permit - City of • • • •:� i 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. L INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-3 PLUMB ROUGH IN X-0 PLUMBING FINAL" B-3 PLUMB GROUND WK B-5 CROSS CONNECTION Printed: Wednesday, October 23, 2024 10:21:59 AM 2 of 2