Loading...
APPROVED BLD PLN RESUB2 BLD2022-1347+Mechanical_Plan+4.6.2023_10.35.49_AM+3467142 (2)GENERAL NOTES 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE LATEST EDITION OF THE WASHINGTON STATE ENERGY CODE (IECC), INTERNATIONAL MECHANICAL CODE (IMC), INTERNATIONAL BUILDING CODE (IBC), INTERNATIONAL FIRE CODE (IFC), AND OTHER APPLICABLE STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTUCTION AND HANGINGS SHALL COMPLY WITH THE LATEST IMC AND WITH CURRENT SMACNA STANDARDS. 4. JOINTS OF DUCT SYSTEM SHALL BE SEALED WITH DUCT MASTIC 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS TO MEET THE REQUIREMENTS OF CURRENT CODES AND SPECIFICATIONS. 6. FLEXIBLE DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXEED 6 FT IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH THE CURRENT IBC. 8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOOR SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 9. HVAC EQUIPMENT, VALVES, AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS, UNLESS SHOWN ON ARCHITECTURAL DRAWINGS. REQUIRED ACCESS PANELS SHALL BE PROVIDED BY THE HVAC CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 10. SEE ARCHITECTURAL DRAWINGS FOR LOCATION OF EXPOSED DUCTWORK AND GRILLES. 11. ALL DUCT DIMENSIONS INDICATE FREE AREA. SOUND LINING AND EXTERIOR INSULATION ARE LABELED AS SUCH. APPROVED PLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE OBTAIN ELECTRICAL PERMIT FROM STATE LABOR & INDUSTRIES MECHANICAL LEGEND SYMBOL DESCRIPTION A101 1 SECTION/ELEVATION VIEW 1 DETAIL VIEW A101 IHP-1 EQUIPMENT TAG OSHEET NOTE TAG 22 REVISION TAG 1 SIZE DIFFUSER/GRILLE TAG FLOW 8"x10„ RECTANGULAR FREE AREA DUCT DIMENSIONS (8" WIDTH x 10" DEPTH) ROUND DUCT FREE AREA DIMENSIONS (6" DIAMETER) FLEX DUCT AIR DIRECTION e SUPPLY DUCT IN/OUT OF PAGE O EXHAUST/RETURN DUCT IN/OUT OF PAGE THERMOSTAT (CO2) CO2 SENSOR U DESCRIPTION D ENVELOPE PENETRATION ® PUMP SUPPLY/EXHAUST FAN O PRESSURE GAUGE O TEMPERATURE GAUGE TURNING VANES City Of Edmonds Building Department ----------------------- Work MECHANICAL ---------------------------------------------------- ----------------------------------------------------- Address 8215 236TH ST SW Owner HOUSING HOPE ------------ Approved Date 4/24/2023 ---------------- Building Official::_V07LOWMtOL W. Permit Number: tjtv�vrc- i .�t i r1�ty-�-r� B-LD2022-1349 BLDG--B BLD2022-1350 BLDG C BLD2022-1351 BLDG D REVISIONS DATE PAGES - CHANGES REV1 REV2 REV3 REV4 REV5 MECHANICAL ABBREVIATIONS AFF ABOVE FINISHED FLOOR ARCH ARCHITECT BLDG BUILDING BMS BUILDING MANAGEMENT SYSTEM BTUH BRITISH THERMAL UNITS PER HOUR CD CONDENSATE CLG COOLING CTE CONNECT TO EXISTING CW COLD WATER CWR CHILLED WATER RETURN CWS CHILLED WATER SUPPLY DCVA DOUBLE CHECK VALVE ASSEMBLY DDC DIRECT DIGITAL CONTROL DHW DOMESTIC HOT WATER DIA DIAMETER DIN DOWN E EXISTING ELEV ELEVATION EWT ENTERING WATER TEMPERATURE FC FAN COIL FCO FLOOR CLEANOUT FLR FLOOR FP FIRE PROTECTION GC GENERAL CONTRACTOR GEO GEOTHERMAL GPM GALLONS PER MINUTE GWB GYPSUM WALLBOARD HTG HEATING HW HOT WATER HWR HOT WATER RETURN HWS HOT WATER SUPPLY INV INVERT LAV LAVATORY MECH MECHANICAL NFA NET FREE AREA CHIP OUTDOOR HEATPUMP POC POINT OF CONNECTION PLUM PLUMBING PSI POUNDS PER SQUARE INCH REF REFER/REFERENCE RF RELIEF FAN RPBP REDUCED PRESSURE BACKFLOW PREVENTER TYP TYPICAL UV UNIT VENTILATORS VTR VENT THRU ROOF WC WATER CLOSET WCO WALL CLEAN OUT WHF WHOLE HOUSE FAN APPROVED BY PLANNING Apr 20 2023 MECHANICAL SHEET LIST Sheet Number Sheet Name M0.01 MECHANICAL GENERAL NOTES M0.02 MECHANICAL SCHEDULE M0.03 MECHANICAL CALCULATIONS M0.04 MECHANICAL CALCULATIONS M0.05 MECHANICAL CALCULATIONS M0.06 MECHANICAL CALCULATIONS M0.07 MECHANICAL CALCULATIONS M0.08 MECHANICAL CALCULATIONS M1.10 MECHANICAL SITE PLAN M2.11 MECHANICAL - FLOOR PLAN - LEVEL 1 - BUILDING A & B M2.12 MECHANICAL - FLOOR PLAN - LEVEL 1 - BUILDING C & D M2.21 MECHANICAL - FLOOR PLAN - LEVEL 2 - BUILDING A & B M2.22 MECHANICAL - FLOOR PLAN - LEVEL 2 - BUILDING C & D M2.31 MECHANICAL - FLOOR PLAN - LEVEL 3 - BUILDING A & B M2.32 MECHANICAL - FLOOR PLAN - LEVEL 3 - BUILDING C & D M2.41 MECHANICAL - ROOF PLAN - BUILDING A & B M2.42 MECHANICAL - ROOF PLAN - BUILDING C & D M5.01 MECHANICAL TYPICAL UNIT PLANS - 1 BD M5.02 MECHANICAL TYPICAL UNIT PLANS - 1 BD M5.03 MECHANICAL TYPICAL UNIT PLANS - 1 BD.ADA M5.04 MECHANICAL TYPICAL UNIT PLANS - 2 BD M5.05 MECHANICAL TYPICAL UNIT PLANS - 2 BD M5.06 MECHANICAL TYPICAL UNIT PLANS - 3 BD M5.07 MECHANICAL TYPICAL UNIT PLANS - 3 BD M5.08 MECHANICAL TYPICAL UNIT PLANS - 3BD.ADA M5.09 MECHANICAL ENGLARGED PLAN - BUILDING A M8.01 MECHANICAL DETAILS A M8.02 MECHANICAL DETAILS B HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 05 W am Cn O �z U) Z zO Lu C' J W Z LLI U) LJ w V Q U) O�aM N LLI L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL GENERAL NOTES SCALE: 1/8" = 1'-0" DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: mono MECH - INDOOR HEAT PUMPS TAG MANUFACTURER MODEL UNIT TYPE OUTDOOR UNIT COOLING CAPACITY HEATING CAPACITY DIMENSIONS WEIGHT ELECTRICAL NOTES HEIGHT WIDTH DEPTH VOLTS/PHASE MCA IHP-A1-A MITSUBISHI MSZ-GL24NA WALL MOUNTED OHP-Al 12,000 Btu/h 14,400 Btu/h 0'- 11 5/8" 0'- 9 1/8" 3'- 7 5/16" 26 Ib 208VAC/ 1 PH 1 PROVIDE WITH GOB12 CONDENSATE PUMP. CONDENSATE DRAIN PIPING PER PLUMBING IHP-A1-B MITSUBISHI MSZ-GL24NA WALL MOUNTED OHP-Al 12,000 Btu/h 14,400 Btu/h 0'- 11 5/8" 0'- 9 1/8" 3'- 7 5/16" 26 Ib 208VAC/ 1 PH 1 PROVIDE WITH GOB12 CONDENSATE PUMP. CONDENSATE DRAIN PIPING PER PLUMBING IHP-A2 MITSUBISHI SEZ-KD12NA DUCTED OHP-Al 11,500 Btu/h 13,600 Btu/h 0'- 7 7/8" 3'- 3" 2' - 3 9/16" 50 Ib 208VAC/ 1 PH 1.0 CONDENSATE DRAIN PIPING PER PLUMBING IHP-A3-A MITSUBISHI MSZ-GL24NA WALL MOUNTED OHP-Al 12,000 Btu/h 14,400 Btu/h 0'- 11 5/8" 0'- 9 1/8" 3'- 7 5/16" 26 Ib 208VAC/ 1 PH 1 PROVIDE WITH GOB12 CONDENSATE PUMP. CONDENSATE DRAIN PIPING PER PLUMBING IHP-A3-B MITSUBISHI MSZ-GL24NA WALL MOUNTED OHP-Al 12,000 Btu/h 14,400 Btu/h 0'- 11 5/8" 0'- 9 1/8" 3'- 7 5/16" 26 Ib 208VAC/ 1 PH 1 PROVIDE WITH GOB12 CONDENSATE PUMP. CONDENSATE DRAIN PIPING PER PLUMBING IHP-A4 MITSUBISHI SLZ-KF09NA CEILING CASSETTE OHP-Al 9,000 Btu/h 11,000 Btu/h 0'- 9 7/16" 1'- 10 7/16" 1'- 10 7/16" 31 Ib 208VAC/ 1 PH 0.25 CONDENSATE DRAIN PIPING PER PLUMBING IHP-A5 MITSUBISHI SEZ-KD09NA DUCTED OHP-Al 8,100 Btu/h 10,900 Btu/h 0'- 7 7/8" 2' - 9 1/16" 2' - 3 9/16" 42 Ib 208VAC/ 1 PH 1.0 CONDENSATE DRAIN PIPING PER PLUMBING IHP-IDF-A MITSUBISHI PKA-Al2LA WALL MOUNTED OHP-ELEC 12,000 Btu/h 0 Btu/h 0'- 11 25/32" 0'- 9 11/32" 2' - 11 3/8" 32 Ib 208VAC/ 1 PH 1 PROVIDE WITH GOB12 CONDENSATE PUMP AND PROGRAMMABLE THERMOSTAT. CONDENSATE DRAIN PIPING PER PLUMBING. MECH - OUTDOOR HEAT PUMPS TAG LOCATION/SERVICE MANUFACTURER MODEL COOLING CAPACITY HEATING CAPACITY HSPF SEER DIMENSIONS SOUND (DbA) WEIGHT ELECTRICAL NOTES WIDTH DEPTH HEIGHT VOLTS/PHASE MCA OHP-Al BLDG A - LEVEL 1 MITSUBISHI MXZ-SM60NAM 60,000 Btu/h 66,000 Btu/h 11.3 18.9 3'- 5 11/32" 1' - 1" 4' - 4 11/16" 59 302 Ib 208V/1 PH 46 MOUNT OUTSIDE PER ARCH. UNIT TO MEET WSEC ADDITIONAL MECHANICAL EFFICIENCY OPTION. OHP-ELEC ELEC (A124) MITSUBISHI PUY-Al2NKA7 12,000 Btu/h 0 Btu/h - 21.0 2' - 7 13/16" 0' - 11 13/16" 2' - 0 13/16" 44 103 Ib 208V/1 PH 11 MOUNT OUTSIDE PER ARCH. UNIT TO MEET WSEC ADDITIONAL MECHANICAL EFFICIENCY OPTION. MECH - ENERGY RECOVERY VENTILATORS TAG MANUFACTURER MODEL FLOW RECOVERY EFFICIENCY ESP (IN WG) V/PH DIMENSIONS WEIGHT NOTES SENSIBLE ENTHALPY HEIGHT WIDTH LENGTH ERV-Al GREENHECK MINICORE-5-VG-FM 200 CFM 77.2% 80.8% 0.50 in-wg 208V/1 PH 1'- 4 5/16" 3'- 3 13/32" 3'- 11 5/16" 215 Ib UNIT OPERATION TO BE INTERLOCKED WITH CO2 SENSOR PER SEQUENCE OF OPERATION. UNIT TO MEET WSEC ADDITIONAL MECHANICAL EFFICIENCY OPTION. ERV-A2 GREENHECK MINICORE-5-VG-FM 300 CFM 74.1 % 77.7% 0.50 in-wg 208V/1 PH 1'- 4 5/16" 3'- 3 13/32" 3'- 11 5/16" 215 Ib UNIT OPERATION TO BE INTERLOCKED WITH CO2 SENSOR PER SEQUENCE OF OPERATION. UNIT TO MEET WSEC ADDITIONAL MECHANICAL EFFICIENCY OPTION. ERV-A3 GREENHECK MINICORE-5-VG-FM 300 CFM 74.1 % 77.7% 0.50 in-wg 208V/1 PH 1'- 4 5/16" 3'- 3 13/32" 3'- 11 5/16" 215 Ib UNIT TO RUN PER SCHEDULE (ADJ). UNIT TO MEET WSEC ADDITIONAL MECHANICAL EFFICIENCY OPTION. ERV-RES PANASONIC FV-110VE2 85 CFM 75% 74% 0.40 in-wg 120VAC/1 PH 0'- 8 7/8" 1' - 11" 2' - 11 3/4" 57 Ib MERV 8 FILTERS. PROVIDE TIMED BOOST CONTROLLER IN PRIMARY BATHROOM. REFERENCE RESIDENTIAL UNIT VENTILATION REQUIREMENTS ON M0.03 FOR CFM. MECH - ELECTRIC HEATERS TAG MANUFACTURER MODEL CAPACITY (w) VOLTS/PHASE NOTES EH -FIRE KING PAW1215 500 120VAC/1 PH PROVIDED BY MC. SET TO RUN AT 40F EH-LND KING KVC1209 840 120VAC/1 PH PROVIDED BY MC EH-MECH KING PAW1215 500 120VAC/1 PH PROVIDED BY MC. SET TO RUN AT 40F EH-MNT KING KVC1212 935 120VAC/1 PH PROVIDED BY MC EH-RES1A KING KVC1206 560 120VAC/1 PH PROVIDED BY MC. LIVING ROOM HEATER. REFERENCE RESIDENTIAL HEAT LOAD CALCULATIONS ON M0.03 EH-RES1 B KING KVC1207 700 120VAC/1 PH PROVIDED BY MC. LIVING ROOM HEATER. REFERENCE RESIDENTIAL HEAT LOAD CALCULATIONS ON M0.03 EH-RES1C KING KVC1209 840 120VAC/1PH PROVIDED BY MC. LIVING ROOM HEATER. REFERENCE RESIDENTIAL HEAT LOAD CALCULATIONS ON M0.03 EH-RES2A KING KVC1204 420 120VAC/1 PH PROVIDED BY MC. BEDROOM HEATER. REFERENCE RESIDENTIAL HEAT LOAD CALCULATIONS ON M0.03 EH-RES2B KING KVC1206 560 120VAC/1 PH PROVIDED BY MC. BEDROOM HEATER. REFERENCE RESIDENTIAL HEAT LOAD CALCULATIONS ON M0.03 EH-RES2C KING KVC1207 700 120VAC/1 PH I PROVIDED BY MC. BEDROOM HEATER. REFERENCE RESIDENTIAL HEAT LOAD CALCULATIONS ON M0.03 MECH-FANS TAG MANUFACTURER MODEL FLOW STATIC PRESSURE MOTOR HP BHP VOLTS/PHASE WEIGHT NOTES EF-IDF-B GREENHECK SP-Al90 150 CFM 0.3 in-wg FHP - 115VAC/1 PH 17 Ib UNIT TO RUN CONTINUOUSLY. EF-IDF-C GREENHECK SP-Al90 150 CFM 0.3 in-wg FHP - 115VAC/1 PH 17 Ib UNIT TO RUN CONTINUOUSLY. EF-IDF-D GREENHECK SP-Al90 150 CFM 0.3 in-wg FHP - 115VAC/1 PH 17 Ib UNIT TO RUN CONTINUOUSLY. EF-LAUND PANASONIC FV-0511VKS2 50 CFM 0.1 in-wg FHP - 120VAC/1PH 12 Ib CONTROL FAN VIA HUMIDISTAT. PROVIDE WITH GRAVITY DAMPER. EF-MNT GREENHECK SP-A390 200 CFM 0.1 in-wg 1 1/16 1 0.07 1 115VAC/1PH 30 Ib PROVIDE W/ MANUAL WALL SWITCH AND 30-MIN TIMER MECH - CEILING FANS TAG MANUFACTURER MODEL OPERATING VOLTAGE WEIGHT I NOTES CF-1 BIG ASS FANS HAIKU - 60" 100-240VAC/1 PH 20 Ib I MATERIAL / FINISH PER ARCHITECT MECH - FIRE/SMOKE DAMPERS TAG MANUFACTURER MODEL TYPE LINK NOTES FSD-CORR RUSKIN FSD36GA DYNAMIC, 1.5 HR EFL, 165F ACTUATOR AND BALANCING DAMPER ACCESSIBLE FROM GRILLE. PROVIDE FACTORY SLEEVE AS REQUIRED. PROVIDE FINISHED OPENING 1/2" LARGER THAN CONNECTED DUCT FSD-A1-S RUSKIN FSD36GA DYNAMIC, 1.5 HR EFL, 165F ACTUATOR AND BALANCING DAMPER ACCESSIBLE FROM LOUVER. PROVIDE FACTORY SLEEVE AS REQUIRED. PROVIDE FINISHED OPENING 1/2" LARGER THAN CONNECTED DUCT FSD-A1-E RUSKIN FSD36GA DYNAMIC, 1.5 HR EFL, 165F ACTUATOR AND BALANCING DAMPER ACCESSIBLE FROM LOUVER. PROVIDE FACTORY SLEEVE AS REQUIRED. PROVIDE FINISHED OPENING 1/2" LARGER THAN CONNECTED DUCT FSD-A2&A3-E RUSKIN FSD36GA DYNAMIC, 1.5 HR EFL, 165F ACTUATOR AND BALANCING DAMPER ACCESSIBLE FROM LOUVER. PROVIDE FACTORY SLEEVE AS REQUIRED. PROVIDE FINISHED OPENING 1/2" LARGER THAN CONNECTED DUCT FSD-A2&A3-S RUSKIN FSD36GA DYNAMIC, 1.5 HR EFL, 165F ACTUATOR AND BALANCING DAMPER ACCESSIBLE FROM LOUVER. PROVIDE FACTORY SLEEVE AS REQUIRED. PROVIDE FINISHED OPENING 1/2" LARGER THAN CONNECTED DUCT MECH - BRANCH CIRCUIT CONTROLLERS TAG MANUFACTUR ER MODEL SERVICE V/PH MCA WEIGHT NOTES BCC-A1-A MITSUBISHI PAC-MKA52BC BUILDING A LEVEL 1 208VAC/ 1 PH 0.05 23.40 Ibf BCC-A1-B MITSUBISHI PAC-MKA32BC BUILDING A LEVEL 1 208VAC/ 1 PH 0.05 21.80 Ibf MECH - DIFFUSERS, LOUVERS, GRILLES TAG MANUFACTURER MODEL TYPE FINISH NOTES R1 TITUS 50F EGGCRATE RETURN GRILLE COORD W/ ARCH R2 TITUS 350RL RETURN GRILLE COORD W/ ARCH R3 TITUS 50F EGGCRATE RETURN GRILLE COORD W/ ARCH R4 TITUS 50F EGGCRATE RETURN GRILLE COORD W/ ARCH S1 TITUS 30ORL DOUBLE DEFLECTION SUPPLY GRILLE COORD W/ ARCH S2 TITUS 30ORL DOUBLE DEFLECTION SUPPLY GRILLE COORD W/ ARCH S4 TITUS 30ORL DOUBLE DEFLECTION SUPPLY GRILLE COORD W/ ARCH S5 TITUS 30ORL DOUBLE DEFLECTION SUPPLY GRILLE COORD W/ ARCH S6 TITUS 30ORL DOUBLE DEFLECTION SUPPLY GRILLE COORD W/ ARCH MECH - DAMPERS TAG MANUFACTURER MODEL VOLTS/PHASE NOTES BD-LAUND RUSKIN CBD4 N/A BAROMETRIC DAMPER SET TO OPEN AT -0.05" WG (ADJ) FOR MAKEUP AIR PATHWAY TO DRYERS. MD-Al-E RUSKIN CD40 120VAC/1 PH INTERLOCK DAMPER WITH ERV-Al MD-Al-S RUSKIN CD40 120VAC/1PH INTERLOCK DAMPER WITH ERV-Al MD-A2-E RUSKIN CD40 120VAC/1PH INTERLOCK DAMPER WITH ERV-A2 MD-A2-S RUSKIN CD40 120VAC/1PH INTERLOCK DAMPER WITH ERV-A2 MD-A3-E RUSKIN CD40 120VAC/1PH INTERLOCK DAMPER WITH ERV-A3 MD-A3-S RUSKIN CD40 120VAC/1PH INTERLOCK DAMPER WITH ERV-A3 MD-LAUND RUSKIN CD40 120VAC/1PH INTERLOCK DAMPER WITH EF-MAINT MD-MAINT RUSKIN CD40 120VAC/1PH INTERLOCK DAMPER WITH EF-LAUND HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629. 3441 P.O. Box 1 27 0 10031 SR 532, Suite B Stanwood, WA 98292 w ww. designs nw. com ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 05 W am Cn O 11mmmWz Z zO t] Lu C' J W Z LV (� Lu m Lu V Q c� Cy') N mc � N 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL SCHEDULE SCALE: DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: MOmO2 COMMON AREA VENTILATION REQUIREMENTS ROOM ASHRAE PROPOSED ROOM # ROOM NAME AREA (SF) # PEOPLE USE Ra Rp SUPPLY (CFM) EXHAUST (CFM) SUPPLY (CFM) RETURN (CFM) A100 CORRIDOR 580 0 Corridors 0.06 0 34.8 0 100 175 A101 COMMUNITY 520 30 Multi -Purpose Assembly 0.06 5 181.2 0 200 150 A102 PROPERTY OFFICE 170 2 Office 0.06 5 20.2 0 25 0 A103 PROPERTY OFFICE 170 2 Office 0.06 5 20.2 0 25 0 A104 SECURE FILE 100 2 Office 0.06 5 16 0 25 0 A105 COPYMORK 100 2 Office 0.06 5 16 0 25 0 A106 SERVICES OFFICE 165 2 Office 0.06 5 19.9 0 25 0 A107 SERVICES OFFICE 165 2 Office 0.06 5 19.9 0 25 0 A108 CONSULTATION 120 2 Office 0.06 5 17.2 0 25 0 A109 TOILET 53 0 Restroom 0 0 0 75 0 75 A110 STORAGE 53 0 Storage 0 0 0 25 0 25 A111 MULTIPURPOSE 700 48 Multi -Purpose Assembly 0.6 5 660 0 675 575 A112 SERVICES OFFICE 166 2 Office 0.06 5 19.96 0 25 0 A113 TOILET 53 59 0 0 Restroom Storage 0 0 0 75 0 75 A114 STORAGE 0 0 0 25 0 25 RESIDENTIAL UNIT VENTILATION REQUIREMENTS ROOM OA CFM OA CFM ROOM NUMBER AREA # BDRS REQUIREMENT SUPPLLIED [SF] 1 [CFM] [CFM] B103, B104, B203, B204, B303, B304, D101 0 - 1,500 30 SEE PLANS A202, A203, A204, A301, A302, A303, A304, B101, B102, B201, 13202, 13301, 13302, 13304, C101, C102, C103, C104, C201, C202, C203, C204, C301, C302, C303, D101, D102, 500-1,000 2 35 SEE PLANS D103, D104, D105, D106, D201, D202, D203, D204, D205, D206, D301, D302, D303, D304, D305 501-1000 SEE PLANS A201, A205, A301, A305, 13101, B201, B301, C104, C204, 3 40 C304, D106, D206, D306 RESIDENTIAL UNIT HEAT LOAD CALCULATION UNIT NUMBERS) AREA DESIGN HEATING LOAD, TOTAL HEATER CAPACITY PROVIDED OVERSIZE RATIO (MIN DHL/PROVIDED) DHL (VENTILATION + INFILTRATION + CONDUCTION) ROOM NAME [FT^2] [W] (W] (%] RES UNIT -A201 914 1,683 2,100 125% RES UNIT - A202 689 983 1,400 142% RES UNIT - A203 689 983 1,400 142% RES UNIT - A204 689 983 1,400 142% RES UNIT -A205 898 1,521 2,100 138% RES UNIT - A301 911 2,016 2,100 104% RES UNIT -A302 689 1,219 1,400 115% RES UNIT -A303 689 1,219 1,400 115% RES UNIT - A304 689 1,219 1,400 115% RES UNIT -A305 898 1,828 2,100 115% RES UNIT - B101 901 2,312 2,460 106% RES UNIT- B102 689 1,219 1,400 115% RES UNIT - B103 478 857 980 114% RES UNIT- B104 432 1,170 1,260 108% RES UNIT - B201 914 1,696 2,100 124% RES UNIT- B202 689 981 1,400 143% RES UNIT - B203 560 796 980 123% RES UNIT- B204 576 1,154 1,260 109% RES UNIT- B301 912 2,034 2,100 103% RES UNIT- B302 689 1,217 1,400 115% RES UNIT - B303 560 988 1,120 113% RES UNIT- B304 576 1,352 1,540 114% RES UNIT - C101 734 1,832 1,920 105% RES UNIT - C102 689 1,282 1,400 109% RES UNIT - C103 689 1,282 1,400 109% RES UNIT - C104 901 1,836 2,100 114% RES UNIT - C201 734 1,274 1,400 110% RES UNIT - C202 689 983 1,400 142% RES UNIT - C203 689 983 1,400 142% RES UNIT - C204 901 1,503 2,100 140% RES UNIT - C301 734 1,525 1,540 101 % RES UNIT - C302 689 1,219 1,400 115% RES UNIT - C303 689 1,219 1,400 115% RES UNIT - C304 901 1,812 2,100 116% RES UNIT- D101 485 1,244 1,260 101% RES UNIT- D102 689 1,286 1,400 109% RES UNIT- D103 689 1,286 1,400 109% RES UNIT- D104 689 1,286 1,400 109% RES UNIT - D105 678 1,246 1,400 112% RES UNIT - D106 911 2,200 2,460 112% RES UNIT- D201 733 1,373 1,400 102% RES UNIT- D202 689 983 1,400 142% RES UNIT- D203 689 983 1,400 142% RES UNIT- D204 RES UNIT- D205 689 678 983 1,400 1,400 142% 146% 959 RES UNIT- D206 924 1,731 2,100 121% RES UNIT- D301 735 1,626 1,920 118% RES UNIT- D302 688 1,218 1,400 115% RES UNIT- D303 689 1,219 1,400 115% RES UNIT - D304 RES UNIT - D305 689 678 1,219 1,192 2,048 1,400 1,400 2,100 115% 117% 103% RES UNIT- D306 924 HOUSING HOPE we keep hope alive DESIGNS 1 L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1 27 0 10031 SR 532, Suite B Stanwood, WA 98292 w ww. designs nw. cont ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O Wz Z Q zO t] W C' J LLI Z W W W V Q = O J a c.0 M N mc � N 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # I Date Description RES U 6 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL CALCULATIONS SCALE: 12" = 1'-0" DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: MO,03 Room Checksums By ECOTOPE A102 - PROPERTY OFFICE COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 9 / 15 Mo/Hr: 10 / 15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 75 / 61 / 57 OADB: 66 OADB: 26 SADB 61.2 72.1 Ra Plenum 75.8 66.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.8 66.9 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.8 64.5 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 -14 -14 -1 0 0 Roof Cond 0 -188 15.13 Glass Solar 925 0 925 37 1,014 45 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond Partition/Door -3 253 0 0 70 -3 323 0 0 13 0 -30 240 0 -1 11 0 Glass/Door Cond Wall Cond Partition/Door -119 -197 0 -119 -251 0 9.56 20.25 0.00 Diffuser Cooling 150 Heating 150 Floor 0 0 0 0.00 0 Floor -295 -295 23.76 Terminal 150 150 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 150 150 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 1,174 57 1,231 50 1,223 54 Sub Total =_> -610 -852 68.70 Nom Vent 9 9 AHU Vent 9 9 Internal Loads Internal Loads Infil 0 0 Lights 464 116 580 23 464 20 Lights 0 0 0.00 MinStop/Rh 0 0 People 383 0 383 15 213 9 People 0 0 0.00 Return 150 150 Misc 348 0 348 14 348 15 Misc 0 0 0.00 Exhaust 9 9 Sub Total =_> 1,195 116 1,311 53 1,025 45 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 42 -42 0 0 30 1 Ceiling Load -59 0 0.00 Leakage Own 0 0 Ventilation Load 0 0 -48 -2 0 0 Ventilation Load 0 -400 32.24 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 10 -0.84 ENGINEERING CKS Exhaust Heat -8 -8 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.8 5.8 Duct Heat Pkup 0 0 0 System Plenum Heat 1 -0.10 cfm/ftZ 0.88 0.88 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 724.84 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 820.49 Btu/hr•ftZ 14.63 -7.30 Grand Total =_> 2,412 123 2,486 100.00 2,278 100.00 Grand Total ==> -670 -1,241 100.00 No. People 0.9 5.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR ton MBh MBh cfm °F °F gr/lb °F °F gr/lb Main Clg 0.2 2.5 2.4 150 75.8 62.7 65.4 61.2 57.2 64.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.2 2.5 Project Name: ELCFA Dataset Name: ELCFA.TRC A103 - PROPERTY OFFICE AREAS Gross Total Glass ftZ (%) Floor 170 Part 0 Int Door 1 ExFlr 13 Roof 170 0 0 Wall 130 12 9 Ext Door 0 0 0 Room Checksums By ECOTOPE HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of Main Htg -1.2 150 64.5 72.1 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -1.2 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 3 of 11 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 15 Mo/Hr: 7 / 16 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 80 / 64 / 64 OADB: 79 OADB: 26 SADB 59.2 76.4 Ra Plenum 76.2 66.3 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.2 66.3 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.6 62.1 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 41 41 2 0 0 Roof Cond 0 -185 14.02 Glass Solar 300 0 300 17 291 20 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond Partition/Door 17 45 0 0 13 17 58 0 1 3 0 19 55 0 1 4 0 Glass/Door Cond Wall Cond Partition/Door -208 -178 0 -208 -231 0 15.74 17.53 0.00 Cooling Diffuser 84 Heating 84 Floor 0 0 0 0.00 0 Floor -295 -295 22.36 Terminal 84 84 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 84 84 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 362 54 416 24 366 25 Sub Total =_> -680 -918 69.66 Nom Vent 9 9 AHU Vent 9 9 Internal Loads Internal Loads Infil 0 0 Lights 464 116 580 33 464 32 Lights 0 0 0.00 MinStop/Rh 0 0 People 383 0 383 22 213 15 People 0 0 0.00 Return 84 84 Misc 348 0 348 20 348 24 Misc 0 0 0.00 Exhaust 9 9 Sub Total =_> 1,195 116 1,311 75 1,025 70 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 67 -67 0 0 70 5 Ceiling Load -94 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 39 2 0 0 Ventilation Load 0 -400 30.35 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 17 -1.26 ENGINEERING CKS Exhaust Heat -12 -12 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 10.3 10.3 Duct Heat Pkup 0 0 0 System Plenum Heat -17 1.25 cfm/ftZ 0.50 0.50 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 576.57 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 1,163.54 Btu/hr•ftZ 10.31 -7.76 Grand Total =_> 1,623 91 1,753 100.00 1,460 100.00 Grand Total ==> -774 -1,318 100.00 No. People 0.9 5.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR ton MBh MBh cfm °F °F gr/lb of of gr/lb Main Clg 0.2 1.8 1.6 84 76.6 63.0 65.7 59.2 56.1 63.3 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.2 1.8 Project Name: ELCFA Dataset Name: ELCFA.TRC AREAS Gross Total Glass ftZ (%) Floor 170 Part 0 Int Door 1 ExFlr 13 Roof 170 0 0 Wall 130 21 16 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F Main Htg -1.3 84 62.1 76.4 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -1.3 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 4 of 11 Room Checksums By ECOTOPE A100 - CORRIDOR COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 9 / 14 Mo/Hr: 10 / 14 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 75 / 61 / 60 OADB: 65 OADB: 26 SADB 55.0 70.7 Ra Plenum 75.9 67.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.9 67.9 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.8 65.2 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 4,517 0 4,517 63 4,986 70 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond Partition/Door -23 120 0 0 64 -23 185 0 0 3 0 -145 115 0 -2 2 0 Glass/Door Cond Wall Cond Partition/Door -553 -103 0 -553 -158 0 28.12 8.05 0.00 Diffuser Cooling 323 Heating 323 Floor 0 0 0 0.00 0 Floor -295 -295 14.98 Terminal 323 323 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 323 323 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 4,614 64 4,679 65 4,957 70 Sub Total =_> -951 -1,007 51.15 Nom Vent 21 21 AHU Vent 21 21 Internal Loads Internal Loads Infil 0 0 Lights 1,584 396 1,980 28 1,584 22 Lights 0 0 0.00 MinStop/Rh 0 0 People 0 0 0 0 0 0 People 0 0 0.00 Return 323 323 Misc 396 0 396 6 396 6 Misc 0 0 0.00 Exhaust 21 21 Sub Total =_> 1,980 396 2,375 33 1,980 28 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 157 -157 0 0 156 2 Ceiling Load -19 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 120 2 0 0 Ventilation Load 0 -964 48.97 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 2 -0.12 ENGINEERING CKS Exhaust Heat -20 -20 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.5 6.5 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ftZ 0.56 0.56 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 541.26 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 972.77 Btu/hr•ftZ 12.34 -3.39 Grand Total =_> 6,751 283 7,155 100.00 7,092 100.00 Grand Total ==> -970 -1,968 100.00 No. People 0.0 0.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR ton MBh MBh cfm °F °F gr/lb of of gr/lb Main Clg 0.6 7.2 7.0 323 75.8 59.8 52.3 55.0 51.6 52.3 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.6 7.2 Project Name: ELCFA Dataset Name: ELCFA.TRC A101 -COMMUNITY AREAS Gross Total Glass ftZ (%) Floor 580 Part 0 Int Door 1 ExFlr 13 Roof 0 0 0 Wall 130 56 43 Ext Door 0 0 0 Room Checksums By ECOTOPE HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of Main Htg -2.0 323 65.2 70.7 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -2.0 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 1 of 11 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 11 Mo/Hr: 7 / 11 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 73 / 61 / 62 OADB: 73 OADB: 26 SADB 59.0 72.2 Ra Plenum 75.5 67.4 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.5 67.4 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.4 65.3 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 152 152 1 0 0 Roof Cond 0 -558 7.70 Glass Solar 11,907 0 11,907 62 11,907 71 Glass Solar 0 0 0.00 AIRFLOWS Glass/DoorCond -270 0 -270 -1 -270 -2 Glass/DoorCond -1,977 -1,977 27.25 Cooling Heating Wall Cond 937 153 1,090 6 937 6 Wall Cond -1,302 -1,515 20.89 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 960 960 Floor 0 0 0 0.00 0 Floor -1,021 -1,021 14.07 Terminal 960 960 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 960 960 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 12,573 305 12,878 67 12,573 75 Sub Total =_> -4,299 -5,071 69.92 Nom Vent 48 48 AHU Vent 48 48 Internal Loads Internal Loads Infil 0 0 Lights 1,365 341 1,707 9 1,365 8 Lights 0 0 0.00 MinStop/Rh 0 0 People 4,500 0 4,500 24 2,500 15 People 0 0 0.00 Return 960 960 Misc 341 0 341 2 341 2 Misc 0 0 0.00 Exhaust 48 48 Sub Total =_> 6,207 341 6,548 34 4,207 25 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 84 -84 0 0 84 1 Ceiling Load -101 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -264 -1 0 0 Ventilation Load 0 -2,215 30.54 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 34 -0.46 ENGINEERING CKS Exhaust Heat -28 -28 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.0 5.0 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ftZ 1.92 1.92 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 602.12 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 313.59 Btu/hr•ftZ 38.27 -14.51 Grand Total =_> 18,864 534 19,133 100.00 16,864 100.00 Grand Total ==> -4,400 -7,253 100.00 No. People 10.0 20.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR ton MBh MBh cfm °F °F gr/lb °F °F gr/lb Main Clg 1.6 19.1 17.3 960 75.4 62.6 65.7 59.0 55.9 62.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 1.6 19.1 Project Name: ELCFA Dataset Name: ELCFA.TRC AREAS Gross Total Glass ftZ (%) Floor 500 Part 0 Int Door 1 ExFlr 45 Roof 500 0 0 Wall 909 200 22 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of Main Htg -7.3 960 65.3 72.2 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -7.3 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 2 of 11 HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 619.3441 PA Box 1^_70 10031 SR 532, Sure B Stanwood. WA 98292 wwww.designsnw.com ECOTOPE 1 91 7 1 ST AVE, #300 SEATTLE WA 9a 1 O 1 PH: (Z06) 3ZZ-3753 FAX: (206) 325-7270 W c0 CV O 00 am Cn O �Z (n Z Q Z0 0 W C� J Liu Z � 1� Cn H W W c, a C) 1-- OJaL0 co CV W a Ln CV 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date= Description RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL CALCULATIONS SCALE: DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: MO,04 Room Checksums By ECOTOPE A106 - SERVICES OFFICE COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 9 / 15 Mo/Hr: 10 / 15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 75 / 61 / 57 OADB: 66 OADB: 26 SADB 61.2 72.1 Ra Plenum 75.8 66.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.8 66.9 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.8 64.6 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 -13 -13 -1 0 0 Roof Cond 0 -182 14.87 Glass Solar 925 0 925 38 1,014 45 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond Partition/Door -3 253 0 0 70 -3 323 0 0 13 0 -30 240 0 -1 11 0 Glass/Door Cond Wall Cond Partition/Door -119 -197 0 -119 -251 0 9.68 20.51 0.00 Diffuser Cooling 148 Heating 148 Floor 0 0 0 0.00 0 Floor -295 -295 24.06 Terminal 148 148 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 148 148 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 1,174 57 1,231 50 1,223 54 Sub Total =_> -610 -847 69.11 Nom Vent 8 8 AHU Vent 8 8 Internal Loads Internal Loads Infil 0 0 Lights 451 113 563 23 451 20 Lights 0 0 0.00 MinStop/Rh 0 0 People 371 0 371 15 206 9 People 0 0 0.00 Return 148 148 Misc 338 0 338 14 338 15 Misc 0 0 0.00 Exhaust 8 8 Sub Total =_> 1,160 113 1,272 52 995 44 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 41 -41 0 0 29 1 Ceiling Load -58 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -47 -2 0 0 Ventilation Load 0 -388 31.69 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 10 -0.83 ENGINEERING CKS Exhaust Heat -7 -7 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.7 5.7 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.03 cfm/ftZ 0.90 0.90 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 726.90 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 808.22 Btu/hr•ftZ 14.85 -7.43 Grand Total =_> 2,375 121 2,450 100.00 2,247 100.00 Grand Total ==> -668 -1,226 100.00 No. People 0.8 5.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR ton MBh MBh cfm -F -F gr/lb °F °F gr/lb Main Clg 0.2 2.5 2.3 148 75.8 62.7 65.4 61.2 57.2 64.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.2 2.5 Project Name: ELCFA Dataset Name: ELCFA.TRC A107 - SERVICES OFFICE AREAS Gross Total Glass ftz (%) Floor 165 Part 0 Int Door 1 ExFlr 13 Roof 165 0 0 Wall 130 12 9 Ext Door 0 0 0 Room Checksums By ECOTOPE HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of -F Main Htg -1.2 148 64.6 72.1 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -1.2 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 7 of 11 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 9 / 15 Mo/Hr: 10 / 15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 75 / 61 / 57 OADB: 66 OADB: 26 SADB 61.2 72.1 Ra Plenum 75.8 66.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.8 66.9 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.8 64.6 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 -13 -13 -1 0 0 Roof Cond 0 -182 14.87 Glass Solar 925 0 925 38 1,014 45 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond Partition/Door -3 253 0 0 70 -3 323 0 0 13 0 -30 240 0 -1 11 0 Glass/Door Cond Wall Cond Partition/Door -119 -197 0 -119 -251 0 9.68 20.51 0.00 Diffuser Cooling 148 Heating 148 Floor 0 0 0 0.00 0 Floor -295 -295 24.06 Terminal 148 148 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 148 148 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 1,174 57 1,231 50 1,223 54 Sub Total =_> -610 -847 69.11 Nom Vent 8 8 AHU Vent Internal Loads Internal Loads 0 0 Lights 451 113 563 23 451 20 Lights 0 0 0.00 MinStop/Rh 0 0 People 371 0 371 15 206 9 People 0 0 0.00 Return 148 148 Misc 338 0 338 14 338 15 Misc 0 0 0.00 Exhaust 8 8 Sub Total =_> 1,160 113 1,272 52 995 44 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 41 -41 0 0 29 1 Ceiling Load -58 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -47 -2 0 0 Ventilation Load 0 -388 31.69 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 10 -0.83 ENGINEERING CKS Exhaust Heat -7 -7 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.7 5.7 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.03 cfm/ftZ 0.90 0.90 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 726.90 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 808.22 Btu/hr•ftZ 14.85 -7.43 Grand Total =_> 2,375 121 2,450 100.00 2,247 100.00 Grand Total ==> -668 -1,226 100.00 No. People 0.8 5.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DBNVB/HR ton MBh MBh cfm -F -F gr/lb °F °F gr/lb Main Clg 0.2 2.5 2.3 148 75.8 62.7 65.4 61.2 57.2 64.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.2 2.5 Project Name: ELCFA Dataset Name: ELCFA.TRC AREAS Gross Total Glass ftZ (%) Floor 165 Part 0 Int Door 1 ExFlr 13 Roof 165 0 0 Wall 130 12 9 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of -F Main Htg -1.2 148 64.6 72.1 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -1.2 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 8 of 11 Room Checksums By ECOTOPE A104 - SECURE FILE COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 15 Mo/Hr: 7 / 20 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 80 / 64 / 64 OADB: 71 OADB: 26 SADB 59.9 76.1 Ra Plenum 76.2 66.3 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.2 66.3 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.7 61.4 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 24 24 3 0 0 Roof Cond 0 -109 15.99 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 35 8 43 5 49 7 Wall Cond -137 -170 24.99 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 42 42 Floor 0 0 0 0.00 0 Floor -181 -181 26.69 Terminal 42 42 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 42 42 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 35 32 67 8 49 7 Sub Total =_> -319 -460 67.67 Nom Vent 5 5 AHU Vent 5 5 Internal Loads Internal Loads Infil 0 0 Lights 273 68 341 40 273 39 Lights 0 0 0.00 MinStop/Rh 0 0 People 225 0 225 26 125 18 People 0 0 0.00 Return 42 42 Misc 205 0 205 24 205 29 Misc 0 0 0.00 Exhaust 5 5 Sub Total =_> 703 68 771 90 603 86 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 39 -39 0 0 51 7 Ceiling Load -55 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 23 3 0 0 Ventilation Load 0 -235 34.62 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 10 -1.43 ENGINEERING CKS Exhaust Heat -7 -7 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 12.1 12.1 Duct Heat Pkup 0 0 0 System Plenum Heat 6 -0.85 cfm/ftZ 0.42 0.42 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 593.10 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 1,405.16 Btu/hr•ftZ 8.54 -6.80 Grand Total =_> 777 54 854 100.00 702 100.00 Grand Total ==> -374 -680 100.00 No. People 0.5 5.0/1000 ftz COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DBNVB/HR ton MBh MBh cfm -F -F gr/lb °F °F gr/lb Main Clg 0.1 0.9 0.8 42 76.7 63.0 65.7 59.9 56.3 63.2 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.1 0.9 Project Name: ELCFA Dataset Name: ELCFA.TRC A105 - COPYIWORK AREAS Gross Total Glass ftz (%) Floor 100 Part 0 Int Door 1 ExFlr 8 Roof 100 0 0 Wall 80 0 0 Ext Door 0 0 0 Room Checksums By ECOTOPE HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm -F of Main Htg -0.7 42 61.4 76.1 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -0.7 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 5 of 11 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 15 Mo/Hr: 7 / 20 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 80 / 64 / 64 OADB: 71 OADB: 26 SADB 59.8 75.3 Ra Plenum 76.2 66.3 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.2 66.3 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.7 61.3 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 24 24 3 0 0 Roof Cond 0 -109 17.00 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 31 7 37 4 43 6 Wall Cond -120 -149 23.26 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 42 42 Floor 0 0 0 0.00 0 Floor -159 -159 24.83 Terminal 42 42 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 42 42 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 31 31 62 7 43 6 Sub Total =_> -279 -416 65.10 Nom Vent 5 5 AHU Vent 5 5 Internal Loads Internal Loads Infil 0 0 Lights 273 68 341 40 273 39 Lights 0 0 0.00 MinStop/Rh 0 0 People 225 0 225 27 125 18 People 0 0 0.00 Return 42 42 Misc 205 0 205 24 205 29 Misc 0 0 0.00 Exhaust 5 5 Sub Total =_> 703 68 771 91 603 87 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 39 -39 0 0 51 7 Ceiling Load -55 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 23 3 0 0 Ventilation Load 0 -235 36.82 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 10 -1.53 ENGINEERING CKS Exhaust Heat -7 -7 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 12.2 12.2 Duct Heat Pkup 0 0 0 System Plenum Heat 3 -0.39 cfm/ftZ 0.42 0.42 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 590.58 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 1,414.00 Btu/hr•ftZ 8.49 -6.39 Grand Total =_> 773 53 849 100.00 696 100.00 Grand Total ==> -334 -639 100.00 No. People 0.5 5.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR ton MBh MBh cfm -F of gr/lb °F °F gr/lb Main Clg 0.1 0.9 0.8 42 76.7 63.0 65.7 59.8 56.3 63.1 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.1 0.9 Project Name: ELCFA Dataset Name: ELCFA.TRC AREAS Gross Total Glass ftZ (%) Floor 100 Part 0 Int Door 1 ExFlr 7 Roof 100 0 0 Wall 70 0 0 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of Main Htg -0.6 42 61.3 75.3 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -0.6 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 6 of 11 HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360.629.3441 P.O. Box 11_70 10031 SR 532. Sure B Sl--Iod. WA 98292 www-designs-coin ECOTOPE 1 91 7 1 ST AVE, #300 SEATTLE WA 9a 1 O 1 PH: (Z06) 3ZZ-3753 FAX: (206) 325-7270 W CD CV O 00 am Cn O �C ') Z O Z 0 LLI C� J LLI M � Z � 1� Cn W W LLI - c, a C) H- O J a CD CV Liu _M L0 CV 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Dai7e= Description RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL CALCULATIONS SCALE: DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: MO,05 Room Checksums By ECOTOPE All - SERVICES OFFICE COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 9 / 15 Mo/Hr: 10 / 15 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 75 / 61 / 57 OADB: 66 OADB: 26 SADB 61.2 72.1 Ra Plenum 75.8 66.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.8 66.9 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.8 64.6 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 -13 -13 -1 0 0 Roof Cond 0 -182 14.87 Glass Solar 925 0 925 38 1,014 45 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond Partition/Door -3 253 0 0 70 -3 323 0 0 13 0 -30 240 0 -1 11 0 Glass/Door Cond Wall Cond Partition/Door -119 -197 0 -119 -251 0 9.68 20.51 0.00 Diffuser Cooling 148 Heating 148 Floor 0 0 0 0.00 0 Floor -295 -295 24.06 Terminal 148 148 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 148 148 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 1,174 57 1,231 50 1,223 54 Sub Total =_> -610 -847 69.11 Nom Vent 8 8 AHU Vent 8 8 Internal Loads Internal Loads Infil 0 0 Lights 451 113 563 23 451 20 Lights 0 0 0.00 MinStop/Rh 0 0 People 371 0 371 15 206 9 People 0 0 0.00 Return 148 148 Misc 338 0 338 14 338 15 Misc 0 0 0.00 Exhaust 8 8 Sub Total =_> 1,160 113 1,272 52 995 44 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 41 -41 0 0 29 1 Ceiling Load -58 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -47 -2 0 0 Ventilation Load 0 -388 31.69 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 10 -0.83 ENGINEERING CKS Exhaust Heat -7 -7 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.7 5.7 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.03 cfm/ftZ 0.90 0.90 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 726.90 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 808.22 Btu/hr•ftZ 14.85 -7.43 Grand Total =_> 2,375 121 2,450 100.00 2,247 100.00 Grand Total ==> -668 -1,226 100.00 No. People 0.8 5.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm -F -F gr/lb Main Clg 0.2 2.5 2.3 148 75.8 62.7 65.4 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.2 2.5 Project Name: ELCFA Dataset Name: ELCFA.TRC Leave DBNVB/HR °F °F gr/lb 61.2 57.2 64.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass ftZ (%) Floor 165 Part 0 Int Door 1 ExFlr 13 Roof 165 0 0 Wall 130 12 9 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of Main Htg -1.2 148 64.6 72.1 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -1.2 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 11 of 11 Room Checksums By ECOTOPE A108 - CONSULTATION COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 7 / 15 Mo/Hr: 7 / 20 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 80 / 64 / 64 OADB: 71 OADB: 26 SADB 59.9 76.3 Ra Plenum 76.2 66.3 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.2 66.3 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.7 61.4 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 29 29 3 0 0 Roof Cond 0 -130 15.67 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Cooling Heating Wall Cond 44 10 53 5 61 7 Wall Cond -171 -212 25.53 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 51 51 Floor 0 0 0 0.00 0 Floor -227 -227 27.25 Terminal 51 51 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 51 51 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 44 39 83 8 61 7 Sub Total =_> -398 -570 68.46 Nom Vent 6 6 AHU Vent Internal Loads Internal Loads 0 0 Lights 328 82 410 40 328 39 Lights 0 0 0.00 MinStop/Rh 0 0 People 270 0 270 26 150 18 People 0 0 0.00 Return 51 51 Misc 246 0 246 24 246 29 Misc 0 0 0.00 Exhaust 6 6 Sub Total =_> 843 82 925 90 723 86 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 47 -47 0 0 61 7 Ceiling Load -66 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 27 3 0 0 Ventilation Load 0 -282 33.94 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 12 -1.41 ENGINEERING CKS Exhaust Heat -8 -8 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 12.0 12.0 Duct Heat Pkup 0 0 0 System Plenum Heat 8 -0.99 cfm/ftZ 0.42 0.42 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 593.92 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 1,402.24 Btu/hr•ftZ 8.56 -6.93 Grand Total =_> 934 65 1,027 100.00 845 100.00 Grand Total ==> -464 -832 100.00 No. People 0.6 5.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm -F -F gr/lb Main Clg 0.1 1.0 0.9 51 76.7 63.0 65.7 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.1 1.0 Project Name: ELCFA Dataset Name: ELCFA.TRC A111 - CHILDRENS Leave DB/WB/HR °F °F gr/lb 59.9 56.3 63.2 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass ftZ (%) Floor 120 Part 0 Int Door 1 ExFlr 10 Roof 120 0 0 Wall 100 0 0 Ext Door 0 0 0 Room Checksums By ECOTOPE HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm -F -F Main Htg -0.8 51 61.4 76.3 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -0.8 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 9 of 11 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo/Hr: 9 / 16 Mo/Hr: 9 / 16 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 75 / 60 / 55 OADB: 75 OADB: 26 SADB 58.1 73.8 Ra Plenum 75.6 67.1 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.6 67.1 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.5 64.3 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 -36 -36 0 0 0 Roof Cond 0 -777 7.62 Glass Solar 11,296 0 11,296 54 11,296 63 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond Partition/Door -35 695 0 0 262 -35 957 0 0 5 0 -35 695 0 0 4 0 Glass/Door Cond Wall Cond Partition/Door -2,372 -960 0 -2,372 -1,320 0 23.26 12.95 0.00 Diffuser Cooling 970 Heating 970 Floor 0 0 0 0.00 0 Floor -2,690 -2,690 26.38 Terminal 970 970 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 970 970 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 11,956 226 12,182 59 11,956 67 Sub Total =_> -6,021 -7,159 70.22 Nom Vent 67 67 AHU Vent 67 67 Internal Loads Internal Loads Infil 0 0 Lights 1,911 478 2,389 11 1,911 11 Lights 0 0 0.00 MinStop/Rh 0 0 People 6,300 0 6,300 30 3,500 19 People 0 0 0.00 Return 970 970 Misc 478 0 478 2 478 3 Misc 0 0 0.00 Exhaust 67 67 Sub Total =_> 8,689 478 9,167 44 5,889 33 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 121 -121 0 0 121 1 Ceiling Load -196 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -499 -2 0 0 Ventilation Load 0 -3,101 30.42 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 65 -0.64 ENGINEERING CKS Exhaust Heat -40 -40 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.9 6.9 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfm/ftZ 1.39 1.39 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 559.28 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 403.67 Btu/hr•ftZ 29.73 -14.56 Grand Total =_> 20,766 542 20,809 100.00 17,966 100.00 Grand Total ==> -6,217 -10,195 100.00 No. People 14.0 20.0/1000 ftZ COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm -F -F gr/lb Main Clg 1.7 20.8 18.5 970 75.5 62.5 65.2 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 1.7 20.8 Project Name: ELCFA Dataset Name: ELCFA.TRC Leave DB/WB/HR °F °F gr/lb 58.1 55.3 61.7 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass ftZ (%) Floor 700 Part 0 Int Door 1 ExFlr 119 Roof 700 0 0 Wall 860 240 28 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of -F Main Htg -10.2 970 64.3 73.8 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -10.2 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 10 of 11 HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629.3441 P.O. Box "" 10031 'a532, sure B sla ood. WA 98292 wwww.designsnw.com ECOTOPE 1 91 7 1 ST AVE, #300 SEATTLE WA 9a 1 O 1 PH: (Z06) 3ZZ-3753 FAX: (206) 325-7270 W CD CV O 00 am Cn O �C ') Z O Z 0 LLI C� J LLI M � Z � 1� Cn H W W LLI c, a Cf) H OJaM CD CV =WaN L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date= Description RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL CALCULATIONS SCALE: DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: MO,06 System Checksums By ECOTOPE IHP-A3 (CHILDRENS) Fan Coil COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADB/WB/HR: Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Envelope Loads Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 0 -36 9 / 16 75 / 60 / 55 Net Percent Total Of Total Btu/h (%) 0 0 0 0 -36 0 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 -777 7.62 TEMPERATURES Cooling Heating SADB 58.1 73.8 Ra Plenum 75.6 67.1 Return 75.6 67.1 Ret/OA 75.5 64.3 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Glass Solar 11,296 0 11,296 54 11,296 63 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond -35 0 -35 0 -35 0 Glass/Door Cond -2,372 -2,372 23.26 Cooling Heating Wall Cond 695 262 957 5 695 4 Wall Cond -960 -1,320 12.95 Diffuser 970 970 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Floor 0 0 0 0.00 0 Floor -2,690 -2,690 26.38 Terminal 970 970 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 970 970 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 11,956 226 12,182 59 11,956 67 Sub Total =_> -6,021 -7,159 70.22 Nom Vent 67 67 AHU Vent 67 67 Internal Loads Internal Loads Infil 0 0 Lights 1,911 478 2,389 11 1,911 11 Lights 0 0 0.00 MinStop/Rh 0 0 People 6,300 0 6,300 30 3,500 19 People 0 0 0.00 Return 970 970 Misc 478 0 478 2 478 3 Misc 0 0 0.00 Exhaust 67 67 Sub Total =_> 8,689 478 9,167 44 5,889 33 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 121 -121 0 0 121 1 Ceiling Load -196 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -499 -2 0 0 Ventilation Load 0 -3,101 30.42 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 65 -0.64 ENGINEERING CKS Exhaust Heat -40 -40 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.9 6.9 Duct Heat Pkup 0 0 0 cfm/ft' 1.39 1.39 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 559.28 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 403.67 Btu/hr•ftz 29.73 -14.56 Grand Total =_> 20,766 542 20,809 100.00 17,966 100.00 Grand Total ==> -6,217 -10,195 100.00 No. People 14 AREAS Gross Total Glass ftz (%) Floor 700 Part 0 Int Door 1 ExFlr 119 Roof 700 0 0 Wall 860 240 28 Ext Door 0 0 0 Project Name: ELCFA Dataset Name: ELCFA.TRC System Checksums By ECOTOPE IHP-A4 (CORRIDOR) HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of Main Htg -10.2 970 64.3 73.8 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -10.2 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 3 of 5 Fan Coil COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADB/WB/HR: Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Envelope Loads Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 0 0 9 / 14 75 / 61 / 60 Net Percent Total Of Total Btu/h (%) 0 0 0 0 0 0 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 TEMPERATURES Cooling Heating SADB 55.0 70.7 Ra Plenum 75.9 67.9 Return 75.9 67.9 Ret/OA 75.8 65.2 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Glass Solar 4,517 0 4,517 63 4,986 70 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond -23 0 -23 0 -145 -2 Glass/Door Cond -553 -553 28.12 Cooling Heating Wall Cond 120 64 185 3 115 2 Wall Cond -103 -158 8.05 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 323 323 Floor 0 0 0 0.00 0 Floor -295 -295 14.98 Terminal 323 323 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 323 323 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 4,614 64 4,679 65 4,957 70 Sub Total =_> -951 -1,007 51.15 Nom Vent 21 21 AHU Vent 21 21 Internal Loads Internal Loads Infil 0 0 Lights 1,584 396 1,980 28 1,584 22 Lights 0 0 0.00 MinStop/Rh 0 0 People 0 0 0 0 0 0 People 0 0 0.00 Return 323 323 Misc 396 0 396 6 396 6 Misc 0 0 0.00 Exhaust 21 21 Sub Total =_> 1,980 396 2,375 33 1,980 28 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 157 -157 0 0 156 2 Ceiling Load -19 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 120 2 0 0 Ventilation Load 0 -964 48.97 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 2 -0.12 ENGINEERING CKS Exhaust Heat -20 -20 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.5 6.5 Duct Heat Pkup 0 0 0 cfm/ft' 0.56 0.56 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 541.26 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 972.77 Btu/hr•ftz 12.34 -3.39 Grand Total =_> 6,751 283 7,155 100.00 7,092 100.00 Grand Total ==> -970 -1,968 100.00 No. People 0 Project Name: ELCFA Dataset Name: ELCFA.TRC AREAS Gross Total Glass ftz (%) Floor 580 Part 0 Int Door 1 ExFlr 13 Roof 0 0 0 Wall 130 56 43 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of Main Htg -2.0 323 65.2 70.7 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -2.0 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 4 of 5 System Checksums By ECOTOPE IHP-A1 (COMMUNITY) Fan Coil COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADB/WB/HR: Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Envelope Loads Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 0 152 7 / 11 73 / 61 / 62 Net Percent Total Of Total Btu/h (%) 0 0 0 0 152 1 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 -558 7.70 TEMPERATURES Cooling Heating SADB 59.0 72.2 Ra Plenum 75.5 67.4 Return 75.5 67.4 Ret/OA 75.4 65.3 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Glass Solar 11,907 0 11,907 62 11,907 71 Glass Solar 0 0 0.00 AIRFLOWS Glass/DoorCond -270 0 -270 -1 -270 -2 Glass/DoorCond -1,977 -1,977 27.25 Cooling Heating Wall Cond 937 153 1,090 6 937 6 Wall Cond -1,302 -1,515 20.89 Diffuser 960 960 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Floor 0 0 0 0.00 0 Floor -1,021 -1,021 14.07 Terminal 960 960 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 960 960 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 12,573 305 12,878 67 12,573 75 Sub Total =_> -4,299 -5,071 69.92 Nom Vent 48 48 AHU Vent 4 4 Internal Loads Internal Loads 00 00 Lights 1,365 341 1,707 9 1,365 8 Lights 0 0 0.00 MinStop/Rh 0 0 People 4,500 0 4,500 24 2,500 15 People 0 0 0.00 Return 960 960 Misc 341 0 341 2 341 2 Misc 0 0 0.00 Exhaust 48 48 Sub Total =_> 6,207 341 6,548 34 4,207 25 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 84 -84 0 0 84 1 Ceiling Load -101 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -264 -1 0 0 Ventilation Load 0 -2,215 30.54 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 34 -0.46 ENGINEERING CKS Exhaust Heat -28 -28 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.0 5.0 Duct Heat Pkup 0 0 0 cfm/ftz 1.92 1.92 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 602.12 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 313.59 Btu/hr•ftz 38.27 -14.51 Grand Total =_> 18,864 534 19,133 100.00 16,864 100.00 Grand Total ==> -4,400 -7,253 100.00 No. People 10 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm -F of gr/lb Main Cig 1.6 19.1 17.3 960 75.4 62.6 65.7 Aux Cig 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 1.6 19.1 Project Name: ELCFA Dataset Name: ELCFA.TRC IHP-A2 Leave DB/WB/HR °F °F gr/lb 59.0 55.9 62.9 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass ftz (%) Floor 500 Part 0 Int Door 1 ExFlr 45 Roof 500 0 0 Wall 909 200 22 Ext Door 0 0 0 System Checksums By ECOTOPE HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm -F -F Main Htg -7.3 960 65.3 72.2 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -7.3 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 1 of 5 Fan Coil COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADB/WB/HR: Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Envelope Loads Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 0 -54 9 / 15 75 / 61 / 57 Net Percent Total Of Total Btu/h (%) 0 0 0 0 -54 -1 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond HEATING COIL PEAK Mo/Hr: Heating Design OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 -734 14.93 TEMPERATURES Cooling Heating SADB 61.2 72.1 Ra Plenum 75.8 66.9 Return 75.8 66.9 Ret/OA 75.8 64.6 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Glass Solar 3,700 0 3,700 38 4,055 45 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond -13 0 -13 0 -120 -1 Glass/Door Cond -474 -474 9.65 Cooling Heating Wall Cond 1,011 281 1,292 13 958 11 Wall Cond -788 -1,005 20.44 Diffuser 595 595 Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Floor 0 0 0 0.00 0 Floor -1,179 -1,179 23.98 Terminal 595 595 Adjacent Floor 0.00 0.00 0.00 0.00 0.00 0.00 Adjacent Floor 0.00 0.00 0.00 Main Fan 595 595 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 4,698 227 4,925 50 4,893 54 Sub Total =_> -2,442 -3,393 69.00 Nom Vent 34 34 AHU Vent 34 34 Internal Loads Internal Loads Infil 0 0 Lights 1,816 454 2,270 23 1,816 20 Lights 0 0 0.00 MinStop/Rh 0 0 People 1,496 0 1,496 15 831 9 People 0 0 0.00 Return 595 595 Misc 1,362 0 1,362 14 1,362 15 Misc 0 0 0.00 Exhaust 34 34 Sub Total =_> 4,674 454 5,128 52 4,009 44 Sub Total =_> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 166 -166 0 0 116 1 Ceiling Load -232 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -188 -2 0 0 Ventilation Load 0 -1,565 31.83 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 41 -0.83 ENGINEERING CKS Exhaust Heat -29 -29 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.7 5.7 Duct Heat Pkup 0 0 0 cfm/ft' 0.90 0.90 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 726.38 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ftZ/ton 811.32 Btu/heft' 14.79 -7.39 Grand Total =_> 9,538 486 9,836 100.00 9,018 100.00 Grand Total ==> -2,674 -4,917 100.00 No. People 3 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm -F -F gr/lb Main Cig 0.8 9.8 9.4 595 75.8 62.7 65.4 Aux Cig 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.8 9.8 Project Name: ELCFA Dataset Name: ELCFA.TRC Leave DB/WB/HR °F °F gr/lb 61.2 57.2 64.6 0.0 0.0 0.0 0.0 0.0 0.0 AREAS Gross Total Glass ftz (%) Floor 665 Part 0 Int Door 1 ExFlr 52 Roof 665 0 0 Wall 520 48 9 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of Main Htg -4.9 595 64.6 72.1 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -4.9 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 2 of 5 HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629.3441 P.O. Box I'll,10031 'a532, suite B sla ood. WA 98292 wwww.designsnw.com ECOTOPE 1 91 7 1 ST AVE, #300 SEATTLE WA 9a 1 O 1 PH: (Z06) 3ZZ-3753 FAX: (206) 325-7270 W co CV O 00 M am Cn O �Z (n Z O Z0 0 Lu C� J W M � Z � 1� Cn H- LLI W LLI - c, a Cf) H- O J a co CV Liu _M L0 CV 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # aa-te= Description RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL CALCULATIONS SCALE: DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: MO,07 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 15 Outside Air: OADB/WB/HR: 80 / 64 / 64 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Envelope Loads Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 0 119 Glass Solar 300 0 Glass/Door Cond 17 0 Wall Cond 155 37 Partition/Door 0 Floor 0 Adjacent Floor 0.00 0.00 Infiltration 0 Sub Total =_> 471 156 Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Dv/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> System Checksums By ECOTOPE CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btu/h (%) Envelope Loads 0 0 Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 291 8 Glass Solar 19 1 Glass/Door Cond 208 6 Wall Cond 0 0 Partition/Door 0.00 0 Floor 0.00 0.00 Adjacent Floor 0 0 Infiltration 518 14 Sub Total =_> Internal Loads 1,338 36 Lights 613 17 People 1,003 27 Misc 2,954 80 Sub Total =_> 232 6 Ceiling Load 0 0 Ventilation Load 0 0 Adj Air Trans Heat Ov/Undr Sizing 0 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 3,704 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -208 -606 0 -862 0.00 0 -1,676 M M N -270 0 0 0 -1,946 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 0 0.00 -533 15.35 0 0.00 -208 5.98 -762 21.97 0 0.00 -862 24.84 0.00 0.00 0 0.00 -2,364 68.14 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -1,153 33.24 0 0 0 0.00 48 -1.38 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -3,470 100.00 AREAS Gross Total Glass w (%) Floor 490 Part 0 Int Door 1 ExFlr 38 Roof 490 0 0 Wall 380 21 6 Ext Door 0 0 0 Fan Coil TEMPERATURES Cooling Heating SADB 59.6 76.1 Ra Plenum 76.2 66.3 Return 76.2 66.3 Ret/OA 76.7 61.7 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 AIRFLOWS Cooling Heating Diffuser 219 219 Terminal 219 219 Main Fan 219 219 Sec Fan 0 0 Nom Vent 25 25 AHU Vent 25 25 Infil 0 0 MinStop/Rh 0 0 Return 219 219 Exhaust 25 25 Rm Exh 0 0 Auxiliary 0 0 Leakage Dwn 0 0 Leakage Ups 0 0 ENGINEERING CKS Cooling Heating % OA 11.4 11.4 cfm/ftz 0.45 0.45 cfm/ton 586.35 ftZ/ton 1,311.67 Btu/hr•ftz 9.15 -7.08 No. People 2 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm of of n Htg -3.5 219 61.7 76.1 Htg 0.0 0 0.0 0.0 heat 0.0 0 0.0 0.0 nidif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 31 -3.5 TRACE® 700 v6.3.5 calculated at 02:29 PM on 01/19/2023 Alternative - 1 System Checksums Report Page 5 of 5 AW\ HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629.3441 P.O. Box 1^_70 10031 SR 532, sure B $I,nWOod. WA 98292 wwww.des i gn sn-coin ECOTOPE V 1 91 7 1 ST AVE, #300 SEATTLE WA 9B 1 O 1 PH: (Z06) 3ZZ-3753 FAX: (206) 325-7270 W CD CV O 00 am Cn O �C ,) Z Q Z 0 W C� J LLI M � Z _ W _ (� w W w c, a C) O J a CV _M L0 CV ao CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date= Description RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL CALCULATIONS SCALE: DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: M0108 REFER TO PLUMBING PLANS FOR MORE INFORMATION ON HEAT PUMP WATER HEATERS (TYP) i MECHANICAL SITE PLAN 3/32" = V-0" HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 L" C W cfl N O 00 O �z U) Z Q zO w C' J Liu Z LLI U) w w V Q U) O J a M N LLI N 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # I Date Description KEYPLAN C A 4/7/2023 CITY OF ED O DS B E SERVICES DEPARTMENT CONTENTS: MECHANICAL SITE PLAN SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: m 1 1 10 I GENERAL NOTES 1 2 3 4 5 A 7 8. 9. 10 11 ALL DUCTWORK IN NON -CONDITIONED SPACES SHALL BE INSULATED TO R-8. REFRIGERANT PIPING SHALL BE INSULATED WITH MINIMUM1" PIPING INSULATION, INCLUDING CONTINUSOUS INSULATION AT SUPPORTS WITH NO THERMAL BRIDGING. REFRIGERANT PIPING, ELECTRICAL CONNECTIONS, AND CONDENSATE PIPING AND CONNECTIONS TO INDOOR HEAT PUMPS UNITS SHALL BE CONCEALED BEHIND WALL OR CEILING (NO SURFACE MOUNTING) MECHANICAL CONTRACTOR SHALL COORDINATE PROVISION OF ALL REQUIRED ACCESS PANELS FOR EQUIPMENT LOCATED ABOVE CEILINGS, INCLUDING BUT NOT LIMITED TO HEAT PUMPS, BALANCING DEVICES, MOTORIZED DAMPERS, FIRE DAMPERS, ERVs, AND FANS. ENSURE THAT ALL MANUFACTURER RECOMMENDED CLEARANCES FOR EQUIPMENT ARE PROVIDED. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. AIR TERMINAL LOCATIONS AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF AIR TERMINALS WITH CEILINGS, STRUCTURAL ELEMENTS, LIGHTS PIPING, EQUIPMENT, ETC. PROVIDE MANUAL VOLUME DAMPERS ON ALL BRANCH DUCTS TO PROVIDE MEANS OF BALANCING FOR ALL TERMINAL DEVICES. VOLUME DAMPERS SHALL BE LOCATED AS FAR AS POSSIBLE FROM AIR TERMINAL SERVED. ANY VOLUME DAMPERS REQUIRED TO BE PLACED IN ACCESSIBLE LOCATIONS SHALL BE EQUIPED WITH REMOTE ACTUATORS (YOUNG REGULATOR TYPE) ANY FLEXIBLE DUCTWORK RUNS SHALL NOT EXCEED 6' IN LENGTH AND SHALL BE INSTALLED WITH NO KINK OR SHARP BENDS/TURNS. INCLUDE TURNING VANES ON ALL RECTANGULAR DUCT ELBOWS. WHERE POSSIBLE ABOID UTILIZING (2) 90 DEGREE ELBOWS WITH DUCT LENGTH BETWEEN THEN OF LESS THAN 2x DIAMETER (OR EQUIVALENT DIAMETER) CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. D 6> T 8 9 10 11 12 MECHANICAL FLOOR PLAN - LEVEL 1 - BLDG A & B HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629.3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W c0 N 0 00 am Cn O �z U) Z Q zO t] LU C' J LLI Z _ L LI _ 3; w m DC w V a U) O J a M N m: LL1 L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. KEYPLAN R9 0% 0 0 r!b C r%jA 4/7/2023 CITY OF ED O DS B E SERVICES DEPARTMENT CONTENTS: MECHANICAL - FLOOR PLAN - LEVEL 1 - BUILDING A & B SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: NM2,1 1 1/8" = 1'-011 GENERAL NOTES 1. ALL DUCTWORK IN NON -CONDITIONED SPACES SHALL BE INSULATED TO R-8. 2. REFRIGERANT PIPING SHALL BE INSULATED WITH MINIMUM1" PIPING INSULATION, INCLUDING CONTINUSOUS INSULATION AT SUPPORTS WITH NO THERMAL BRIDGING. 3. REFRIGERANT PIPING, ELECTRICAL CONNECTIONS, AND CONDENSATE PIPING AND CONNECTIONS TO INDOOR HEAT PUMPS UNITS SHALL BE CONCEALED BEHIND WALL OR CEILING (NO SURFACE MOUNTING) 4. MECHANICAL CONTRACTOR SHALL COORDINATE PROVISION OF ALL REQUIRED ACCESS PANELS FOR EQUIPMENT LOCATED ABOVE CEILINGS, INCLUDING BUT NOT LIMITED TO HEAT PUMPS, BALANCING DEVICES, MOTORIZED DAMPERS, FIRE DAMPERS, ERVs, AND FANS. ENSURE THAT ALL MANUFACTURER RECOMMENDED CLEARANCES FOR EQUIPMENT ARE PROVIDED. 5. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 6. AIR TERMINAL LOCATIONS AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF AIR TERMINALS WITH CEILINGS, STRUCTURAL ELEMENTS, LIGHTS PIPING, EQUIPMENT, ETC. 7. PROVIDE MANUAL VOLUME DAMPERS ON ALL BRANCH DUCTS TO PROVIDE MEANS OF BALANCING FOR ALL TERMINAL DEVICES. VOLUME DAMPERS SHALL BE LOCATED AS FAR AS POSSIBLE FROM AIR TERMINAL SERVED. ANY VOLUME DAMPERS REQUIRED TO BE PLACED IN ACCESSIBLE LOCATIONS SHALL BE EQUIPED WITH REMOTE ACTUATORS (YOUNG REGULATOR TYPE) 8. ANY FLEXIBLE DUCTWORK RUNS SHALL NOT EXCEED 6' IN LENGTH AND SHALL BE INSTALLED WITH NO KINK OR SHARP BENDS/TURNS. 9. INCLUDE TURNING VANES ON ALL RECTANGULAR DUCT ELBOWS. 10. WHERE POSSIBLE ABOID UTILIZING (2) 90 DEGREE ELBOWS WITH DUCT LENGTH BETWEEN THEN OF LESS THAN 2x DIAMETER (OR EQUIVALENT DIAMETER) 11. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. EXHAUST LOUVER, 0.6 SF NFA r- / M� D-MAI MAINTENANCE C123 A.3 o 174 SF E RISER EH-LND ' EF- AUND T MD LAUND TIl BD- AUND LAUNDRY' C122 4"0 UP TO ROOF o HEAVY METAL RIGID 4" ROUND DUCTS ONLY FOR DRYER EXHAUST. DRYER VENT UP TO ROOF TERMINATION VIA FURRED WALL (2x6) TYP (8)- 10"x6" MAKE UP AIR INTAKE LOUVER DRYER MAKE UP AIR INTAKE LOUVER 3.0 SF NFA D 2 2 MAINT. INTAKE AIR LOUVER, DAMPER 7 INTERLOCK W/ EXH FAN L �4 5 6 3) r T T EF-MNT C124 EH -FIRE SF L EH-MNT EH-MECH 0 I i❑ M�E- -IDF-CH I HPWH I 3-BEC104PE B ELEC C120 1 901 SF ILI 128 SF ELEC. Fff -1 C121 27 SF i i i PROVIDE LOUVERED DOOR d---- 6"0 EXHAUST DUCT UP TO ROOF p L MECHANICAL FLOOR PLAN - LEVEL 1 - BLDG C & D 1/8" = 1'-0" 1 2 2 7 2-BED TYPE B C 001 734 SF i i i i II II II ;I'_I I 0----- iF =� u= A El PROVIDE LOUVERED DOOR 6"0 LI 8 AW\, HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629.3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 c0 N O 00 W 00 04 Cn 3: a U) w O � z w 0 Q z z W w C' J J m Z LLI U) LU m w U) V a OJaM N m: LLI 00 L0 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. KEYPLAN C "IrA 4/7/2023 CITY OF ED O DS B E SERVICES DEPARTMENT CONTENTS: MECHANICAL - FLOOR PLAN - LEVEL 1 - BUILDING C & D SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: N M 2,12 1 2 3 4 61 0 7 8. 9. 10 11 GENERAL NOTES I ALL DUCTWORK IN NON -CONDITIONED SPACES SHALL BE INSULATED TO R-8. REFRIGERANT PIPING SHALL BE INSULATED WITH MINIMUM1" PIPING INSULATION, INCLUDING CONTINUSOUS INSULATION AT SUPPORTS WITH NO THERMAL BRIDGING. REFRIGERANT PIPING, ELECTRICAL CONNECTIONS, AND CONDENSATE PIPING AND CONNECTIONS TO INDOOR HEAT PUMPS UNITS SHALL BE CONCEALED BEHIND WALL OR CEILING (NO SURFACE MOUNTING) MECHANICAL CONTRACTOR SHALL COORDINATE PROVISION OF ALL REQUIRED ACCESS PANELS FOR EQUIPMENT LOCATED ABOVE CEILINGS, INCLUDING BUT NOT LIMITED TO HEAT PUMPS, BALANCING DEVICES, MOTORIZED DAMPERS, FIRE DAMPERS, ERVs, AND FANS. ENSURE THAT ALL MANUFACTURER RECOMMENDED CLEARANCES FOR EQUIPMENT ARE PROVIDED. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. AIR TERMINAL LOCATIONS AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF AIR TERMINALS WITH CEILINGS, STRUCTURAL ELEMENTS, LIGHTS PIPING, EQUIPMENT, ETC. PROVIDE MANUAL VOLUME DAMPERS ON ALL BRANCH DUCTS TO PROVIDE MEANS OF BALANCING FOR ALL TERMINAL DEVICES. VOLUME DAMPERS SHALL BE LOCATED AS FAR AS POSSIBLE FROM AIR TERMINAL SERVED. ANY VOLUME DAMPERS REQUIRED TO BE PLACED IN ACCESSIBLE LOCATIONS SHALL BE EQUIPED WITH REMOTE ACTUATORS (YOUNG REGULATOR TYPE) ANY FLEXIBLE DUCTWORK RUNS SHALL NOT EXCEED 6' IN LENGTH AND SHALL BE INSTALLED WITH NO KINK OR SHARP BENDS/TURNS. INCLUDE TURNING VANES ON ALL RECTANGULAR DUCT ELBOWS. WHERE POSSIBLE ABOID UTILIZING (2) 90 DEGREE ELBOWS WITH DUCT LENGTH BETWEEN THEN OF LESS THAN 2x DIAMETER (OR EQUIVALENT DIAMETER) CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. f:3 NOTE: BLDG A LEVELS 2 & 3 ARE 3'-6" HIGHER THAN B, C & D MECHANICAL FLOOR PLAN - LEVEL 2 - BLDG A & B 1/8" = 1'-011 HOUSING i HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360.629.3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www.designsnw.com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 `0 N CD 00 W CO O �z zO Q UJI LU C' J U) Z UIU) w � w U V a = CD O J a co N UJI 00 Lo CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 I REVISION SCHEDULE Rev # Date Description KEYPLAN R9 g%m EM C r%jA 4/7/2023 CITY OF ED O DS B E SERVICES DEPARTMENT CONTENTS: MECHANICAL - FLOOR PLAN - LEVEL 2 - BUILDING A & B SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: N M 2,21 1 2 3 4 5 0 i7 8. 9. 10 11 GENERAL NOTES ALL DUCTWORK IN NON -CONDITIONED SPACES SHALL BE INSULATED TO R-8. REFRIGERANT PIPING SHALL BE INSULATED WITH MINIMUMV PIPING INSULATION, INCLUDING CONTINUSOUS INSULATION AT SUPPORTS WITH NO THERMAL BRIDGING. REFRIGERANT PIPING, ELECTRICAL CONNECTIONS, AND CONDENSATE PIPING AND CONNECTIONS TO INDOOR HEAT PUMPS UNITS SHALL BE CONCEALED BEHIND WALL OR CEILING (NO SURFACE MOUNTING) MECHANICAL CONTRACTOR SHALL COORDINATE PROVISION OF ALL REQUIRED ACCESS PANELS FOR EQUIPMENT LOCATED ABOVE CEILINGS, INCLUDING BUT NOT LIMITED TO HEAT PUMPS, BALANCING DEVICES, MOTORIZED DAMPERS, FIRE DAMPERS, ERVs, AND FANS. ENSURE THAT ALL MANUFACTURER RECOMMENDED CLEARANCES FOR EQUIPMENT ARE PROVIDED. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. AIR TERMINAL LOCATIONS AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF AIR TERMINALS WITH CEILINGS, STRUCTURAL ELEMENTS, LIGHTS PIPING, EQUIPMENT, ETC. PROVIDE MANUAL VOLUME DAMPERS ON ALL BRANCH DUCTS TO PROVIDE MEANS OF BALANCING FOR ALL TERMINAL DEVICES. VOLUME DAMPERS SHALL BE LOCATED AS FAR AS POSSIBLE FROM AIR TERMINAL SERVED. ANY VOLUME DAMPERS REQUIRED TO BE PLACED IN ACCESSIBLE LOCATIONS SHALL BE EQUIPED WITH REMOTE ACTUATORS (YOUNG REGULATOR TYPE) ANY FLEXIBLE DUCTWORK RUNS SHALL NOT EXCEED 6' IN LENGTH AND SHALL BE INSTALLED WITH NO KINK OR SHARP BENDS/TURNS. INCLUDE TURNING VANES ON ALL RECTANGULAR DUCT ELBOWS. WHERE POSSIBLE ABOID UTILIZING (2) 90 DEGREE ELBOWS WITH DUCT LENGTH BETWEEN THEN OF LESS THAN 2x DIAMETER (OR EQUIVALENT DIAMETER) CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. A� PROVIDE T CLEARANCE BETWEEN EXHAUST AND OPENINGS INTO BUILDING (TYP (1 i 2 3 � �) (6i 7 T I PROVIDE BACKDRAFT DAMPERS (TYP) (15) 16j (17! 181 19 (20i 21% MECHANICAL 1/8" = 1'-011 FLOOR PLAN - LEVEL 2 - BLDG C & D 8 HOUSING rl I HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1 27 0 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 _ W N Q am C U) U) O � z w w 0 Q z z W w z C' J J m z LLI i U) W w U) V Q O J a M N LLI 00 L0 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. KEYPLAN C J-LJFA 4/7/2023 CITY OF ED O DS B E SERVICES DEPARTMENT CONTENTS: MECHANICAL - FLOOR PLAN - LEVEL 2 - BUILDING C & D SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: N M 2,2 2 GENERAL NOTES 1. ALL DUCTWORK IN NON -CONDITIONED SPACES SHALL BE INSULATED TO R-8. 2. REFRIGERANT PIPING SHALL BE INSULATED WITH MINIMUM1" PIPING INSULATION, INCLUDING CONTINUSOUS INSULATION AT SUPPORTS WITH NO THERMAL BRIDGING. 3. REFRIGERANT PIPING, ELECTRICAL CONNECTIONS, AND CONDENSATE PIPING AND CONNECTIONS TO INDOOR HEAT PUMPS UNITS SHALL BE CONCEALED BEHIND WALL OR CEILING (NO SURFACE MOUNTING) 4. MECHANICAL CONTRACTOR SHALL COORDINATE PROVISION OF ALL REQUIRED ACCESS PANELS FOR EQUIPMENT LOCATED ABOVE CEILINGS, INCLUDING BUT NOT LIMITED TO HEAT PUMPS, BALANCING DEVICES, MOTORIZED DAMPERS, FIRE DAMPERS, ERVs, AND FANS. ENSURE THAT ALL MANUFACTURER RECOMMENDED CLEARANCES FOR EQUIPMENT ARE PROVIDED. 5. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 6. AIR TERMINAL LOCATIONS AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF AIR TERMINALS WITH CEILINGS, STRUCTURAL ELEMENTS, LIGHTS PIPING, EQUIPMENT, ETC. 7. PROVIDE MANUAL VOLUME DAMPERS ON ALL BRANCH DUCTS TO PROVIDE MEANS OF BALANCING FOR ALL TERMINAL DEVICES. VOLUME DAMPERS SHALL BE LOCATED AS FAR AS POSSIBLE FROM AIR TERMINAL SERVED. ANY VOLUME DAMPERS REQUIRED TO BE PLACED IN ACCESSIBLE LOCATIONS SHALL BE EQUIPED WITH REMOTE ACTUATORS (YOUNG REGULATOR TYPE) 8. ANY FLEXIBLE DUCTWORK RUNS SHALL NOT EXCEED 6' IN LENGTH AND SHALL BE INSTALLED WITH NO KINK OR SHARP BENDS/TURNS. 9. INCLUDE TURNING VANES ON ALL RECTANGULAR DUCT ELBOWS. 10. WHERE POSSIBLE ABOID UTILIZING (2) 90 DEGREE ELBOWS WITH DUCT LENGTH BETWEEN THEN OF LESS THAN 2x DIAMETER (OR EQUIVALENT DIAMETER) 11. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. D� 2-BED C301 734 SF N M N w w 0 co U C7 z 0 J D m 00 2-BED 2-BED D302 LD301 689 SF 733 SF O O n r O o O oo 1 (20 l 8 9 10 2 NOTE: BLDG A & C LEVELS 2 & 3 ARE 3'-6" HIGHER THAN B & D M 5.06 22 MECHANICAL FLOOR PLAN - LEVEL 3 - BLDG A & B 1/8" = 1'-011 11 12 1 M 5.07 1 2 1 2 1 M5.01 M5.02 M5.04 M5.06 22.5) i 24 HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629.3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 w ww. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9S 1 O 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �z U) Z Q zO LU C' J LLI U) Z W � LU Cl) LL Nw L.L V a U) O J a c� M N mc � L0 N 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # I Date Description KEYPLAN C qr"A 4/7/2023 CITY OF ED O DS B E SERVICES DEPARTMENT CONTENTS: MECHANICAL - FLOOR PLAN - LEVEL 3 - BUILDING A & B SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: N M 2,31 1 2 3 4 i 7 8. 9. 10 11 GENERAL NOTES ALL DUCTWORK IN NON -CONDITIONED SPACES SHALL BE INSULATED TO R-8. REFRIGERANT PIPING SHALL BE INSULATED WITH MINIMUM1" PIPING INSULATION, INCLUDING CONTINUSOUS INSULATION AT SUPPORTS WITH NO THERMAL BRIDGING. REFRIGERANT PIPING, ELECTRICAL CONNECTIONS, AND CONDENSATE PIPING AND CONNECTIONS TO INDOOR HEAT PUMPS UNITS SHALL BE CONCEALED BEHIND WALL OR CEILING (NO SURFACE MOUNTING) MECHANICAL CONTRACTOR SHALL COORDINATE PROVISION OF ALL REQUIRED ACCESS PANELS FOR EQUIPMENT LOCATED ABOVE CEILINGS, INCLUDING BUT NOT LIMITED TO HEAT PUMPS, BALANCING DEVICES, MOTORIZED DAMPERS, FIRE DAMPERS, ERVs, AND FANS. ENSURE THAT ALL MANUFACTURER RECOMMENDED CLEARANCES FOR EQUIPMENT ARE PROVIDED. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. AIR TERMINAL LOCATIONS AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF AIR TERMINALS WITH CEILINGS, STRUCTURAL ELEMENTS, LIGHTS PIPING, EQUIPMENT, ETC. PROVIDE MANUAL VOLUME DAMPERS ON ALL BRANCH DUCTS TO PROVIDE MEANS OF BALANCING FOR ALL TERMINAL DEVICES. VOLUME DAMPERS SHALL BE LOCATED AS FAR AS POSSIBLE FROM AIR TERMINAL SERVED. ANY VOLUME DAMPERS REQUIRED TO BE PLACED IN ACCESSIBLE LOCATIONS SHALL BE EQUIPED WITH REMOTE ACTUATORS (YOUNG REGULATOR TYPE) ANY FLEXIBLE DUCTWORK RUNS SHALL NOT EXCEED 6' IN LENGTH AND SHALL BE INSTALLED WITH NO KINK OR SHARP BENDS/TURNS. INCLUDE TURNING VANES ON ALL RECTANGULAR DUCT ELBOWS. WHERE POSSIBLE ABOID UTILIZING (2) 90 DEGREE ELBOWS WITH DUCT LENGTH BETWEEN THEN OF LESS THAN 2x DIAMETER (OR EQUIVALENT DIAMETER) CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. ,C 1 2 3 4 5 6 �7/) (8 j MECHANICAL FLOOR PLAN - LEVEL 3 - BLDG C & D 1/8" = 1'-011 HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629.3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W c0 N O 00 am Cn O �z U) Z Q zO t] LU C' J Liu Z LLI U) w w V a U) O J a M N LLI L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # I Date Description 2 01/04/2023 PERMIT RESUBM. KEYPLAN C "Ir A 4/7/2023 CITY OF ED O DS B E SERVICES DEPARTMENT CONTENTS: MECHANICAL - FLOOR PLAN - LEVEL 3 - BUILDING C & D SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: N M 2,3 2 A N W W 0) 06 U 0 z J m D 6 7 8 9 10 11 (12 AWN HOUSING HOPE we keep hope alive I 1 � (21 22 22.5 MECHANICAL ROOF PLAN - BLDG A & B 1/8" = 1'-011 DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1 27 0 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 N O 00 W m a i O �z C/) z Q 0 L] LU C' J LLI U) Z W � LU Nw L.L V Q U) = O J a C.0 Cy') N LLI N 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description I KEYPLAN A 4/7/2023 CITY OF JEDO DS B E SERVICES DEPARTMENT CONTENTS: 23 24 25 i MECHANICAL - ROOF PLAN - BUILDING A & B SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: N M 2,41 q 3 4 5 6 7 8 T �1 15 16 17 18 19 20 21 MECHANICAL ROOF PLAN - BLDG C & D 1 /8 = 11-011 HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1 27 0 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W N O 00 a Cn LU U) w O coZ � U) z (3 z a z LLI 0 0 W J m C' J � Z LLI U) W m W V Q U) = O J a C.0 M N LLI N 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # I Date Description KEYPLAN EC A 4/7/2023 CITY OF :E DI O 1DS B E SERVICES DEPARTMENT CONTENTS: MECHANICAL - ROOF PLAN - BUILDING C & D SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: NM 2,42 MECHANICAL 1/4" = 1'-011 TYPICAL UNIT PLAN - 1 BD MIRRORED 6" EXHAUST DIN MECHANICAL TYPICAL UNIT PLAN - 1 BD - UNIT B203 1/4" = 1'-011 GENERAL NOTES - TYPICAL UNIT PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"06") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 6" HOOD VENT FOR EACH KITCHEN EXHAUST. 9. COVE HEATERS TO BE PROVIDE IN EACH LIVING SPACE AND BEDROOM. REFERENCE HEAT LOAD CALCULATIONS FOR SIZING. 10. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 11. UNIT ERV ARE TO BE LOCATED WITHIN THE CEILING CAVITY WITHIN BOXED OUT FRAMING. REFERENCE STRUCTURAL PLANS FOR DETAILS. 12. DROPPED CEILINGS AND SOFFITS TO BE PROVIDED FOR MECHANICAL EQUIPMENT AND DUCTING. FINAL LOCATION PENDING FURTHER COORDINATION. REFERENCE ARCHITECTURAL PLANS FOR DETAILS. 13. CFM OF DOMESTIC HOODS TO BE A MINIMUM OF 100 CFM. REF ARCH PLANS FOR DETAILS. SHEET NOTES Note # Note Text 1 6" VENT CAP ON ERV INTAKE, ERV EXHAUST, AND RANGE HOOD EXHAUST (TYP) 2 6"0 CONNECTION TO RANGE HOOD. CONTRACTOR TO FIELD CONNECT. 3 ROUTE DUCT ABOVE TO JOIST -BAY. NO FIRE DAMPERS REQUIRED PER 2018 IBC 714.5.2 EXCEPTION 1. AGGREGATE AREA OF THE OPENINGS THROUGH THE FIRE MEMBRANE SHALL NOT EXCEED 100 SQ IN. IN ANY 100 SF OF CEILING AREA. HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �z U) Z zO Lu C' J W Z L L1 U) LU w V Q U) O�aM N LL1 L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. 3 03/27/2023 CONFORMED 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL TYPICAL UNIT PLANS - 1 BD SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: M5,0 GENERAL NOTES - TYPICAL UNIT PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"x36") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 6" HOOD VENT FOR EACH KITCHEN EXHAUST. 9. COVE HEATERS TO BE PROVIDE IN EACH LIVING SPACE AND BEDROOM. REFERENCE HEAT LOAD CALCULATIONS FOR SIZING. 10. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 11. UNIT ERV ARE TO BE LOCATED WITHIN THE CEILING CAVITY WITHIN BOXED OUT FRAMING. REFERENCE STRUCTURAL PLANS FOR DETAILS. 12. DROPPED CEILINGS AND SOFFITS TO BE PROVIDED FOR MECHANICAL EQUIPMENT AND DUCTING. FINAL LOCATION PENDING FURTHER COORDINATION. REFERENCE ARCHITECTURAL PLANS FOR DETAILS. 13. CFM OF DOMESTIC HOODS TO BE A MINIMUM OF 100 CFM. REF ARCH PLANS FOR DETAILS. SHEET NOTES Note # Note Text 1 6" VENT CAP ON ERV INTAKE, ERV EXHAUST, AND RANGE HOOD EXHAUST (TYP) 2 6"0 CONNECTION TO RANGE HOOD. CONTRACTOR TO FIELD CONNECT. 3 ROUTE DUCT ABOVE TO JOIST -BAY. NO FIRE DAMPERS REQUIRED PER 2018 IBC 714.5.2 EXCEPTION 1. AGGREGATE AREA OF THE OPENINGS THROUGH THE FIRE MEMBRANE SHALL NOT EXCEED 100 SQ IN. IN ANY 100 SF OF CEILING AREA. HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �z U) Z zO Lu C' J W Z LLI U) LU w V Q U) O�aM N LLI L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 3 03/27/2023 CONFORMED SET RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL TYPICAL UNIT PLANS - 1 BD SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: 5,02 C 1 19 O IF - I \ I I m I � EH-RES1 Cgl� 1-BED TYPE-B 6"x6" 1-BED TYPE-B B 004 1 50 CFM B 003 432 SF S1 6"x4" 479 SF 30 CFM 2 lO R 1 6„x6 �, I 2 6"x4" 50 CFM S1 20 CFM O S1 30 CFM m EH-RES2 IRE RIS —B 120' 66 SF ERV-RES 3 0 6" EXHAUST UP' I MECJLC WHI 105 SF EH-MECH EH -FIRE DERV -REST S 1 6"x4" o 20 CFM " EXHAUST UP zz 22.� MECHANICAL TYPICAL UNIT PLAN - 1BD.ADA-B 1/4" = 1'-0" E F-ID F-B ELEC. B122 [---'27SF 01 • \_6" EXHAUST UP IEH-RES21 A �C 1_ C20 ; 21 MECHANICAL TYPICAL UNIT PLAN - 1BD.ADA-A 1/4" = 1'-0" GENERAL NOTES - TYPICAL UNIT PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"x36") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 6" HOOD VENT FOR EACH KITCHEN EXHAUST. 9. COVE HEATERS TO BE PROVIDE IN EACH LIVING SPACE AND BEDROOM. REFERENCE HEAT LOAD CALCULATIONS FOR SIZING. 10. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 11. UNIT ERV ARE TO BE LOCATED WITHIN THE CEILING CAVITY WITHIN BOXED OUT FRAMING. REFERENCE STRUCTURAL PLANS FOR DETAILS. 12. DROPPED CEILINGS AND SOFFITS TO BE PROVIDED FOR MECHANICAL EQUIPMENT AND DUCTING. FINAL LOCATION PENDING FURTHER COORDINATION. REFERENCE ARCHITECTURAL PLANS FOR DETAILS. 13. CFM OF DOMESTIC HOODS TO BE A MINIMUM OF 100 CFM. REF ARCH PLANS FOR DETAILS. SHEET NOTES Note # Note Text 1 6" VENT CAP ON ERV INTAKE, ERV EXHAUST, AND RANGE HOOD EXHAUST (TYP) 2 6"0 CONNECTION TO RANGE HOOD. CONTRACTOR TO FIELD CONNECT. 3 ROUTE DUCT ABOVE TO JOIST -BAY. NO FIRE DAMPERS REQUIRED PER 2018 IBC 714.5.2 EXCEPTION 1. AGGREGATE AREA OF THE OPENINGS THROUGH THE FIRE MEMBRANE SHALL NOT EXCEED 100 SQ IN. IN ANY 100 SF OF CEILING AREA. HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �mmWz Z ZO t] Lu C' J W Z W U) LU Lu V Q U) O�aM c� N LLI L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. 3 03/27/2023 CONFORMED 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL TYPICAL UNIT PLANS - 1 B D .ADA SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: 5,0 MECHANICAL 1/4" = 1'-011 TYPICAL UNIT PLAN - 213D MIRRORED MECHANICAL 1/4" = 1'-011 TYPICAL UNIT PLAN - 213D GENERAL NOTES - TYPICAL UNIT PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"x36") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 6" HOOD VENT FOR EACH KITCHEN EXHAUST. 9. COVE HEATERS TO BE PROVIDE IN EACH LIVING SPACE AND BEDROOM. REFERENCE HEAT LOAD CALCULATIONS FOR SIZING. 10. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 11. UNIT ERV ARE TO BE LOCATED WITHIN THE CEILING CAVITY WITHIN BOXED OUT FRAMING. REFERENCE STRUCTURAL PLANS FOR DETAILS. 12. DROPPED CEILINGS AND SOFFITS TO BE PROVIDED FOR MECHANICAL EQUIPMENT AND DUCTING. FINAL LOCATION PENDING FURTHER COORDINATION. REFERENCE ARCHITECTURAL PLANS FOR DETAILS. 13. CFM OF DOMESTIC HOODS TO BE A MINIMUM OF 100 CFM. REF ARCH PLANS FOR DETAILS. SHEET NOTES Note # Note Text 1 6" VENT CAP ON ERV INTAKE, ERV EXHAUST, AND RANGE HOOD EXHAUST (TYP) 2 6"0 CONNECTION TO RANGE HOOD. CONTRACTOR TO FIELD CONNECT. 3 ROUTE DUCT ABOVE TO JOIST -BAY. NO FIRE DAMPERS REQUIRED PER 2018 IBC 714.5.2 EXCEPTION 1. AGGREGATE AREA OF THE OPENINGS THROUGH THE FIRE MEMBRANE SHALL NOT EXCEED 100 SQ IN. IN ANY 100 SF OF CEILING AREA. HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �z U) Z zO Lu C' J W Z LLI U) LU w V Q U) O�aM N LLI L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL TYPICAL UNIT PLANS -2BD SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: 5,04 GENERAL NOTES - TYPICAL UNIT PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"x36") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 6" HOOD VENT FOR EACH KITCHEN EXHAUST. 9. COVE HEATERS TO BE PROVIDE IN EACH LIVING SPACE AND BEDROOM. REFERENCE HEAT LOAD CALCULATIONS FOR SIZING. 10. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 11. UNIT ERV ARE TO BE LOCATED WITHIN THE CEILING CAVITY WITHIN BOXED OUT FRAMING. REFERENCE STRUCTURAL PLANS FOR DETAILS. 12. DROPPED CEILINGS AND SOFFITS TO BE PROVIDED FOR MECHANICAL EQUIPMENT AND DUCTING. FINAL LOCATION PENDING FURTHER COORDINATION. REFERENCE ARCHITECTURAL PLANS FOR DETAILS. 13. CFM OF DOMESTIC HOODS TO BE A MINIMUM OF 100 CFM. REF ARCH PLANS FOR DETAILS. SHEET NOTES Note # Note Text 1 6" VENT CAP ON ERV INTAKE, ERV EXHAUST, AND RANGE HOOD EXHAUST (TYP) 2 6"0 CONNECTION TO RANGE HOOD. CONTRACTOR TO FIELD CONNECT. 3 ROUTE DUCT ABOVE TO JOIST -BAY. NO FIRE DAMPERS REQUIRED PER 2018 IBC 714.5.2 EXCEPTION 1. AGGREGATE AREA OF THE OPENINGS THROUGH THE FIRE MEMBRANE SHALL NOT EXCEED 100 SQ IN. IN ANY 100 SF OF CEILING AREA. 5 HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �z U) Z zO Lu C' J W Z LLI U) LU w V Q U) O�aM N LLI L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 3 03/27/2023 CONFORMED SET RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL TYPICAL UNIT PLANS -2BD SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: 5,0 !15�()6 MECHANICAL TYPICAL UNIT PLAN - 3BD MIRRORED 1/4" = 1'-011 m MECHANICAL TYPICAL UNIT PLAN - 3BD 1/4" = 1'-011 GENERAL NOTES - TYPICAL UNIT PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"x36") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 6" HOOD VENT FOR EACH KITCHEN EXHAUST. 9. COVE HEATERS TO BE PROVIDE IN EACH LIVING SPACE AND BEDROOM. REFERENCE HEAT LOAD CALCULATIONS FOR SIZING. 10. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 11. UNIT ERV ARE TO BE LOCATED WITHIN THE CEILING CAVITY WITHIN BOXED OUT FRAMING. REFERENCE STRUCTURAL PLANS FOR DETAILS. 12. DROPPED CEILINGS AND SOFFITS TO BE PROVIDED FOR MECHANICAL EQUIPMENT AND DUCTING. FINAL LOCATION PENDING FURTHER COORDINATION. REFERENCE ARCHITECTURAL PLANS FOR DETAILS. 13. CFM OF DOMESTIC HOODS TO BE A MINIMUM OF 100 CFM. REF ARCH PLANS FOR DETAILS. SHEET NOTES Note # Note Text 1 6" VENT CAP ON ERV INTAKE, ERV EXHAUST, AND RANGE HOOD EXHAUST (TYP) 2 6"0 CONNECTION TO RANGE HOOD. CONTRACTOR TO FIELD CONNECT. 3 ROUTE DUCT ABOVE TO JOIST -BAY. NO FIRE DAMPERS REQUIRED PER 2018 IBC 714.5.2 EXCEPTION 1. AGGREGATE AREA OF THE OPENINGS THROUGH THE FIRE MEMBRANE SHALL NOT EXCEED 100 SQ IN. IN ANY 100 SF OF CEILING AREA. HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360.629.3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �z U) Z zO Lu C' J W Z LLI U) LU Cl) LL DC w V Q U) O�aM N LLI L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. 3 03/27/2023 CONFORMED 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL TYPICAL UNIT PLANS-3BD SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: 5,0 MECHANICAL TYPICAL UNIT PLAN - 3BD MIRRORED - UNITS C204 & C304 1/4" = 1'-011 GENERAL NOTES - TYPICAL UNIT PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"x36") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 6" HOOD VENT FOR EACH KITCHEN EXHAUST. 9. COVE HEATERS TO BE PROVIDE IN EACH LIVING SPACE AND BEDROOM. REFERENCE HEAT LOAD CALCULATIONS FOR SIZING. 10. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 11. UNIT ERV ARE TO BE LOCATED WITHIN THE CEILING CAVITY WITHIN BOXED OUT FRAMING. REFERENCE STRUCTURAL PLANS FOR DETAILS. 12. DROPPED CEILINGS AND SOFFITS TO BE PROVIDED FOR MECHANICAL EQUIPMENT AND DUCTING. FINAL LOCATION PENDING FURTHER COORDINATION. REFERENCE ARCHITECTURAL PLANS FOR DETAILS. 13. CFM OF DOMESTIC HOODS TO BE A MINIMUM OF 100 CFM. REF ARCH PLANS FOR DETAILS. SHEET NOTES Note # Note Text 1 6" VENT CAP ON ERV INTAKE, ERV EXHAUST, AND RANGE HOOD EXHAUST (TYP) 2 6"0 CONNECTION TO RANGE HOOD. CONTRACTOR TO FIELD CONNECT. 3 ROUTE DUCT ABOVE TO JOIST -BAY. NO FIRE DAMPERS REQUIRED PER 2018 IBC 714.5.2 EXCEPTION 1. AGGREGATE AREA OF THE OPENINGS THROUGH THE FIRE MEMBRANE SHALL NOT EXCEED 100 SQ IN. IN ANY 100 SF OF CEILING AREA. MECHANICAL TYPICAL UNIT PLAN - 3BD MIRRORED -UNITS A201 & A�301 1/4" = 1'-011 HOUSING HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �z U) z zo 0 Lu C' J W Z LLI U) LU w V Q U) O�aM N LLI L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 3 03/27/2023 CONFORMED SET RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL TYPICAL UNIT PLANS-3BD SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: 5,0 D MECHANICAL 1/4" = 1'-011 TYPICAL UNIT PLAN - 313D.ADA-13 i Z4 j MECHANICAL ,/1 /4 = 1 -0 TYPICAL UNIT PLAN - 3BD.ADA-A GENERAL NOTES - TYPICAL UNIT PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"x36") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 6" HOOD VENT FOR EACH KITCHEN EXHAUST. 9. COVE HEATERS TO BE PROVIDE IN EACH LIVING SPACE AND BEDROOM. REFERENCE HEAT LOAD CALCULATIONS FOR SIZING. 10. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 11. UNIT ERV ARE TO BE LOCATED WITHIN THE CEILING CAVITY WITHIN BOXED OUT FRAMING. REFERENCE STRUCTURAL PLANS FOR DETAILS. 12. DROPPED CEILINGS AND SOFFITS TO BE PROVIDED FOR MECHANICAL EQUIPMENT AND DUCTING. FINAL LOCATION PENDING FURTHER COORDINATION. REFERENCE ARCHITECTURAL PLANS FOR DETAILS. 13. CFM OF DOMESTIC HOODS TO BE A MINIMUM OF 100 CFM. REF ARCH PLANS FOR DETAILS. SHEET NOTES Note # Note Text 1 6" VENT CAP ON ERV INTAKE, ERV EXHAUST, AND RANGE HOOD EXHAUST (TYP) 2 6"0 CONNECTION TO RANGE HOOD. CONTRACTOR TO FIELD CONNECT. 3 ROUTE DUCT ABOVE TO JOIST -BAY. NO FIRE DAMPERS REQUIRED PER 2018 IBC 714.5.2 EXCEPTION 1. AGGREGATE AREA OF THE OPENINGS THROUGH THE FIRE MEMBRANE SHALL NOT EXCEED 100 SQ IN. IN ANY 100 SF OF CEILING AREA. HOUSING r HOPE we keep hope alive DESIGNS L v northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 19 1 7 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 W am Cn O �z U) Z zO Lu C' J W Z L L1 U) LU w V Q U) O�aM N LL1 L0 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL TYPICAL UNIT PLANS - 3113D.ADA SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: 5,0 8 R3 6"x6" FSD-A2&A3 E 25 CFM 12"x6" \ R2 200 CFM CF-1 O IHP-A3-A 6"x6" R3 75 CFM CO2) L 0 o� 1 0 IHP- 3-B CF-1 12"x8" S2 300 CFM m ao STORAGE A114 F/ limic J ERV-A A_ —TOILET FA-1 1-3-1 53 SF C 0 m 0 R3 6"x6" 25 CFM x2"x12" 75 CFM EXHAUST LOUVER, 1.5 SQ. FT. NFA M D-A3-S 1 s PACKAGES II II A121 81 SF MD-A2-S m 6"x6" ao R3 75 CFM m w ERV-A2 2 STORAGEV53 Al 00 O 53 SF 0 CORRIDOR A 1070 S6 17 51 25CFM S62CFM �TJ SERVICES OFFICE Al 22 166 SF S5 12"x12" 75 CFM MECHANICAL ENLARGED PLAN - BUILDING A - LEVEL 1 1 /4" = 1'-011 t OUTSIDE AIR INTAKE LOUVER, 1.5 SQ. FT. NFA FSD-A2&A3-S 6"o CONSULTATION 108 12"x12" 11� 0 5 50 CFM R45 0 5CFM PROVIDE CLEARANCE PER MANUFACTURER REQUIREMENTS (TYP) 12"x12 50 CF1 jol 12"S5 12"x12" 50 100 CFM SECURE FILE J) O A104 R4 12 x12 98 4 12"x12" COP Wd4KCFM 50 CFM _105 O 97 SF — n n— n- 8"o 6"x" 6"x6" ,� ,� 6 S6 25 CIF S6 25 CFM S6 25 CFM 6"x6" S6 25 CFM IHP-A4 O O25 CFM 2 S6 R4 12" 2" 12"x12" 75 CF 75 CFM PROPERTY OFFICE Al 33 165 SF R4 100 CFM 8O 1 25 CFM S6 11 (ABOVE) (BELOW) I 10"x8" (2) O STO AGE Al 23 95 3 F IHP-A5 S4 12"x12" 100 CFM 30 FSD-CORR O 6"0 8"o 6"0 SERVICES OFF CE SERVICES OFFICE COM ITY PROPERTY ERV-A1 A107 A106 O P 2 12"x12" OFFICE 163 SF 163 SF A120 R4 75 CFM A102 O O 136 SF 166S5 12"x12" IHP-A2 75 CFM 6"0 S 12"x12" S5 12"x12" 7 75 CFM 75 CFM 8"0 6"0 8"o 8"o / �FSD-AII-S� '\ TFSD-AlOUTSIDE AIR INTAKE�MD-A1-S EXHAUST LOUVER, 1 SQ. FT. NFA LOUVER,1 SQ. FT. NFA ENLARGED PLAN SHEET NOTES Note # I Note Text 1 REF PLUMBING PLANS FOR CONDENSATE TERMINATION. 2 PROVIDE ACCESS PANEL FOR MECHANICAL EQUIPMENT IN CEILING 11"r-P%1-r'1 12"x8" S2 200 CFM 0 _6"x6" 50 CFM CIF II COMMUNITY A 1071 513 SF (CO2)12"x8" R2 100 CFM I O O CF-1 0 GENERAL NOTES - ENLARGED PLANS 1. THERMOSTATS SHALL BE LOCATED AWAY FROM ANY POTENTIAL SOURCES FOR FALSE READINGS SUCH AS OPERABLE WINDOWS, DIRECT SUNLIGHT, ETC. 2. ALL DUCTWORK ROUTING, AIR TEMINAL LOCATIONS, AND EQUIPMENT LOCATIONS ARE APPROXIMATE. CONTRACTORS SHALL FINALIZE DUCT ROUTING, COORDINATE PROVISION OF SOFFITING WITH ARCHITECT AS NEEDED, AND COORDINATE LOCATIONS OF ALL HVAC ELEMENTS WITH STRUCTURE, LIGHTING PIPING, ETC. 3. PROVIDE MANUAL BALANCING DAMPERS ON ALL BRANCH DUCTS SUCH THAT EVERY AIR TERMINAL CAN BE BALANCED. 4. RIGID METAL DUCTING SHALL BE USED FOR ALL VENTILATION. (NO FLEX DUCTS) 5. CONTRACTOR SHALL COORDINATE WITH ARCHITECT TO ENSURE ALL EXHAUST TERMINATIONS IN UNITS MEET THE CLEARANCES REQUIRED IN THE 2018 INTERNATIONAL MECHANICAL CODE TO OPERABLE OPENINGS, INTAKES, AND MECHANICAL EQUIPMENT. 6. COORDINATE FINAL DIFFUSERS AND GRILLE LOCATIONS WITH ARCHITECTURAL RCPs AND ELEVATIONS. 7. PROVIDE AN UNRATED, OVERSIZED ACCESS PANEL (MIN SIZE 28"x36") IN CEILING FOR MAINTENANCE AND FUTURE REMOVAL OF ERV UNIT. 8. PROVIDE 1/2" UNDERCUT AT ALL INTERIOR DOORS. 9. IN ACCORDANCE WITH 2O18 IBC 717.5.4 EXCEPTION 4-ALL DUCTS CROSSING WALLS WITH FIRE -RESISTANCE RATING OF 1-HOUR OR LESS SHALL BE CONSTRUCTED OF SHEET STEEL NOT LESS THAN NO. 26 GAUGE THICKNESS AND SHALL BE CONTINUOUS WITHOUT OPENINGS FROM THE AIR -HANDLING APPLIANCE OR EQUIPMENT TO THE AIR OUTLET AND INLET THERMINALS LOCATED ON THE OPPOSITE SIDE OF THE WALL ASSEMBLY. 11nr-r% 1-01 AW\ HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629. 3441 P.O. Box 1 27 0 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 ry r ON M; W am Cn O Wz Z zO t] LU C' J W U) Z W `; LU m Lu V Q U) = O J a c.0 M N mc L L0 N00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description 1 10/19/22 BID SET 2 01/04/2023 PERMIT RESUBM. RESUB 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL ENGLARGED PLAN - BUILDING A SCALE: As indicated DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 M 5,0 9 1. DUCT 2. SHEET -METAL STRAP 1" (25.4-MM) WIDE OF SAME METAL GAUGE AS DUCT. 3. ANGLE - NOT LESS THAN 1"x1"x1/8" (25.425.43MM), SIZED TO MATCH DUCT. 4. SHEET -METAL BAND 1" (25.4-MM) WIDE OF SAME METAL GAUGE AS DUCT. 5. ALL -THREAD HANGER ROD WITH ACCESSORIES AS USED FOR LIGHT PIPE HANGER. SHEET METAL DUCT HANGERS 1211 — 1'-01' nrSPLICE 1 r PLACE \ ACTUATOR BETWEE IN N SIDE POCKET LOUVERS SEE ARCH DWGS FOR RAINSCREEN DETAIL CAULK LOUVER CAULK SIP PANEL NOTES: 1. CONTRACTOR SHALL COORDINATE REQUIRED WALL OPENING SIZE FOR FINAL LOUVER SELECTION WITH SIP PANEL MANUFACTURER. OUTDOOR AIR NATURAL VENT LOUVER DETAIL 1211 = 1'-01' EXPANSION onnnr�. 4/11 MIN AT TOF SIDE BOLT OR TACK WELD ANGLE T SLEEVE ON 6" CENTERS. DO INC FASTEN ANGLE OR SLEEVE TO WAI I I I I I I I I I I I ACCESS DOOR AS REQUIRED TO SERVICE FIRE DAMPER FIRE DAMPER/ACTUATOR IF PENETRATES FIRE-W_ SOUND -LINED ACOUSTIC TRANSFER BOOT 1211 — 1'-01' MOUNT TO SIP ACCORDING TO SIP MANUFACTURER'S INSTRUCTIONS (TYP) BUG SCREEN MOUNTING BRACKET SIZE OF DUCT DROP TO MATCH NECK SIZE OF GRILLE (TYP) U01 USE 45 DEGREE THROAT AT TAP VD MOUNT TO SIP PANEL ROOF ACCORDING TO SIP MANUFACTURER'S INSTRUCTIONS ARCH FOR DETAILS jNEOPRENE VIBRATION ISOLATORS, SIZED FOR 1/2" TOTAL STATIC ET/OUTLET FROM DEFLECTION :ER BOOT, SIZED FPM MAX / 1/2" THREADED ROD, TYPICAL HVAC UNIT 4' LONG MINIMUM ACOUSTIC TRANSFER BOOT, SEE LOCK NUT, TYPICAL PLANS FOR SIZING NOTES: LINING 1. EQUIPMENT MOUNTING AND CONNECTION AND SEISMIC RESTRAINTS TO BE DESIGNED AND STAMPED BY LICENSED WASHINGTON STATE ENGINEER AS A DEFERRED SUBMITTAL CENTERLINE RADIUS EQUALS 1.5 TIMES WIDTH. NO TURNING VANES REQUIRED UNLESS OTHERWISE NOTED MIN 36" BEFORE VD AND AFTER ELBOW 30 DEGREE MAX PROVIDE REDUCER RFLOW UPSTREAM OF y � 15 DEGREE TYP 1 BRANCH INLET CONICAL OR LO-LOSS 45 DEGREE FITTING RADIUSED WYE BRANCHES. ALTERNATE SQUARE ELBOWS WITH TURNING VANES ALLOWABLE WHERE DUCT VELOCITIES ARE LESS THAN 1500 FPM NOTES PROVIDE REDUCER AT CONNECTION TO GRILLE WHERE BRANCH DUCT IS OVERSIZED 1. PROVIDE DUCT LINER AND/OR EXTERNAL DUCT INSULATION AS NOTED ON PLANS OR IN SPECIFICATIONS 2. PROVIDE HANGERS AND SEISMIC BRACING PER SMACNA AND BUILDING CODE REQUIREMENTS 3. LOCATE MANUAL BALANCING DAMPERS IMMEDIATELY DOWNSTREAM OF EACH DUCT TAP 4. MAINTAIN MINIMUM 36" CLEARANCE BETWEEN LEADING OR TRAILING ELBOW JOINT AND DUCT TAP FITTINGS 5. TURNING VANES REQUIRED ON RECTANGULAR DUCT SYSTEM ELBOWS. SINGLE THICKNESS VANES UP TO 25" HEIGHT AND DOUBLE THICKNESS VANES IN DUCTS GREATER THAN 25" HEIGHT RADIUSED ELBOWS MAY BE USED AS AN ALTERNATE 6. NO TURNING VANES REQUIRED ON DUCT SIZES LESS THAN 180 SQ IN IF DUCT VELOCITY IS LESS THAN 1500 FPM RETURN EXHAUST DUCT FITTINGS 1211 = 1'-01' CONICAL OR LO- LOSS 45 DEGREE BOOT FITTING WITH VOLUME DAMPER ROUND NECK DIFFUSER (TYP) ROUND SHEET METAL DUCT FLEXIBLE DUCT 7' MAX LENGTH W/ ONE 90 DEGREE BEND VIBRATION ISOLATION 1211 — 1'-01' VD 45 DEGREE LO-LOSS BOOT TAP OR CONICAL TAP SQUARE TO ROUND TRANSITION TRANSITION VD 15 DEGREE TYPICAL, 30 DEGREE MAXIMUM 7 TYPICAL SQUARE NECK DIFFUSER SIZE OF DUCT DROP TO MATCH DIFFUSER NECK SIZE VD VDT VD MIN 36" BEFORE AND AFTER ELBOW VD CENTERLINE RADIUS EQUALS 1.5 TIMES WIDTH i REDUCER TO MATCH ` DIFFUSER NECK SIZE IF BRANCH DUCT IS OVERSIZED. LOCATE AT CONNECTION TO DIFFUSER } SPLITTER DAMPER WHERE AIRFLOW SHOWN. DO NOT USE ON VAV SYSTEMS NOTES 1. PROVIDE DUCT LINER AND/OR EXTERNAL DUCT INSULATION AS NOTED ON PLANS OR IN SPECIFICATIONS 2. PROVIDE HANGERS AND SEISMIC BRACING PER SMACNA AND BUILDING CODE REQUIREMENTS 3. LOCATE MANUAL BALANCING DAMPERS IMMEDIATELY DOWNSTREAM OF EACH DUCT TAP 4. CUSHION HEADS OR BILL HEAD TEES ARE NOT ALLOWED 5. MAINTAIN MINIMUM 36" CLEARANCE BETWEEN LEADING OR TRAILING ELBOW JOINT AND DUCT TAP FITTINGS 6. RADIUSED ELBOWS OR TURNING VANES REQUIRED ON RECTANGULAR DUCT SYSTEM ELBOWS SINGLE THICKNESS VANES UP TO 25" HEIGHT AND DOUBLE THICKNESS VANES IN DUCTS GREATER THAN 25" HEIGHT SUPPLY DUCT FITTINGS 1211 = 1'-01' HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 R 31 M W a V ♦ O u) z Z ZO 0 W C' J UJI Z W U) LU w D' V Q = O J a c.0 M N U Lo N 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description RES U B 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL DETAILS A SCALE: 12" = 1'-0" DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: M810 INDOOR UNIT DISCONI SHALL BE RECESSI CEILING, SU DISCONNECT TO ECO- FOR RE STRUCTURE ATION ISOLATION SMIC STRAPPING, 'EQUIRED -ING RECESSED DOR UNIT EILING TILE 11IXL I V IXINI LLE MAINTENANCE ACCESS NOTES: 1. EQUIPMENT MOUNTING AND CONNECTION TO BE DESIGNED AND STAMPED BY LICENSED WASHINGTON STATE ENGINEER AS A DEFERRED SUBMITTAL. INSTALL SEISMIC RESTRAINTS IF REQUIRED CEILING RECESSED FAN COIL DETAIL 1 211 = 1 1-011 SHEET METAL SHEET METAL TO CEILING FIR GWB CEILING MIN. FOR TOP JCT DNNECTION MIN. FOR SIDE JCT DNNECTION GWB CEILING (TYPICAL RETURN/EXHAUST GRILLE) CEILING GRILLE DETAIL 1 211 = 1 1-011 EXPANSION SPACE: 1/2" MIN AT TOP, 1/4" MIN EACH SIDE BOLT OR TACK WELD ANGLE TO SLEEVE ON 6" CENTERS. DO NOT FASTEN ANGLE OR SLEEVE TO WALL I FASTEN DAMPER TO SLEEVE WITH SHEET METAL SCREWS ❑ o OR WELD FIRE DAMPER ACTUATOR INDICATED DUCT CONNECTION SHEET METAL BOOT. FASTEN TO CEILING GRILLE FOR T-BAR CEILINGS T-BAR CEILING FIREWALL 2"x2"x1/8" ANGLE ON ALL FOUR SIDES OF DUCT AND BTHIDE o S SOF FIREWALL 14 GAUGE SHEET METAL SLEEVE THRU WALL DAMPER UNIT ROUND OR RECTANGULA R DUCT ACCESS DOOR \ AS REQUIRED a TO SERVICE FIRE SHEET METAL EXTENSION FOR DAMPER ATTACHMENT OF DUCTWORK. CONNECT DUCT TO FASTEN EXTENSION SECURELY EXTENSION USING TO FLANGE OF DAMPER AND TO PLAIN S SLIPS. SLEEVE THRU WALL PROVIDE ONE SHEET METAL SCREW THRU THE S SLIP ON EACH VERTICAL SIDE. FIRE/SMOKE DAMPER CONNECTION DETAIL 1211 = 11-011 2 MOUNT TO SIP PANEL ROOF ACCORDING TO SIP MANUFACTURER'S INSTRUCTIONS EISMIC TRAPPING, IF EQUIRED FLEXCV IN IN- I IV IN (TYP) NOTES: 1. EQUIPMENT MOUNTING AND CONNECTION TO BE DESIGNED AND STAMPED BY LICENSED WASHINGTON STATE ENGINEER AS A DEFERRED SUBMITTAL. INSTALL SEISMIC RESTRAINTS IF REQUIRED CEILING HUNG MECH EQUIPMENT DETAIL 1 211 = 1 1-011 )-1 ROOF LOPEn SIDE VIEW STRUCTURE CUSTOM EXT MANUFF COORDINATE E HOUSING HOPE we keep hope alive DESIGNS northwest ARCHITECTS 360. 629. 3441 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 www. designs nw. com 'ING ECOTOPE 1 9 17 1 ST AvE, #300 SEATTLE WA 9B 1 o 1 PH: (206) 322-3753 FAX: (206) 325-7270 NOTES: 1. COORDINATE FAN LOCATION WITH LIGHTS AND SPRINKLER HEADS (MINIMUM 3' DISTANCE). 2. INTERLOCK FANS LARGER THAN 60' WITH FIRE SYSTEM, TURN FANS OFF IN THE EVENT OF AN ALARM. 3. EQUIPMENT MOUNTING AND CONNECTION TO BE DESIGNED AND STAMPED BY LICENSED WASHINGTON STATE ENGINEER AS A DEFERRED SUBMITTAL INSTALL SEISMIC RESTRAINTS IF REQUIRED CEILING FAN MOUNTING DETAIL 1 211 = 1 1-011 GENERAL NOTE: 1. PROVIDE VRF OUTDOOR UNIT BASE DESIGN AS A DEFERRED SUBMITTAL. DESIGN SHALL BE STAMPED BY A LICENSED WASHINGTON STATE STRUCTURAL ENGINEER. NUMBER NOTES: 1. PROVIDE STRUCTURAL INTERSTITIAL ANGLE IRON MOUNTING MEMBER OR SIMILAR ATTACHED DIRECTLY TO BOTTOM OF UNIT MOUNTING FLANGE AND PROVIDE CROSS BRACING FOR RIGIDITY. ENSURE IT CARRIES FULL MOUNTING FOOT WIDTH ON UNIT. FINAL SPECIFICATION OF MEMBER BY STRUCTURAL ENGINEER OF RECORD. 2. PROVIDE BRAIDED COPPER FLEXIBLE CONNECTOR, R410A RATED, 650PSI MAX WORKING PRESSURE, PACKLESS INDUSTRIES OR EQUAL ON ALL MAIN PIPING DOWNSTREAM OF TWINNING KITS/CONVERGING FITTINGS PRIOR TO PENETRATION THROUGH ROOF. 3. PIPE ROOF CURB, FLASHED AND SEALED WATER TIGHT, PROVIDE FLEXIBLE WATER TIGHT COLLAR TO ALLOW FOR MOVEMENT WHERE PIPE ENTERS CURB. DO NOT ENTER PIPE CURB FROM VERTICAL DIRECTION. COORDINATE OPENING WITH GENERAL CONTRACTOR. 4. TYPICAL BASE SUPPORT POSTS, SECURELY ANCHORED TO BUILDING STRUCTURE BELOW, QUANTITY, SIZE, AND CARRYING CAPACITY DETERMINED BY STRUCTURAL ENGINEER OF RECORD. 5. STRUCTURAL ANGLE IRON BASE MOUNTING FRAME WITH CROSS MEMBERS FOR RIGIDITY - FINAL SIZING BY STRUCTURAL ENGINEER OF RECORD. 6. VIBRATION SPRING SLR TYPE ISOLATORS (MASON INDUSTRIES OR EQUIV.) WITH RUBBER BASE PADS, SECURELY FASTENED TO STRUCTURAL BASE AND TO VRF UNIT INTERSTITIAL SUPPORT STEEL. SPRING ISOLATOR TO PROVIDE MINIMUM 1" DEFLECTION OR 10 TIMES THE STATIC DEFLECTION OF THE ROOF DECK FROM EQUIPMENT WEIGHT - DETERMINED BY STRUCTURAL ENGINEER OF RECORD. AT A MINIMUM, PROVIDE SPRING ISOLATORS AT EACH EQUIPMENT BASE MOUNTING HOLE LOCATION. 7. IF REQUIRED, ONLY SUPPORT LATERAL PIPE EMANATING FROM VRF UNIT CONNECTIONS BY CROSS MEMBER SUPPORT THAT IS ATTACHED DIRECTLY TO VRF UNIT MOUNTING ANGLE IRON FRAME ABOVE SPRING ISOLATORS. DO NOT ATTACH ANY PIPING TO LOWER FIXED SUPPORT BASE. 8. USE NEOPRENE ISOLATION COLLARS ON PIPE CLAMS WHEN FASTENING PIPING TO SUPPORTS. 9. USE LONG RADIUS SWEEPING COPPER ACR TUBE PIPE BENDS WHERE PIPE ENTERS BUILDING AT FIRST ELBOW INTO CEILING SPACE TO MINIMIZE REFRIGERANT FLOW NOISE AND VIBRATION. 10. ALL ELECTRICAL CONNECTIONS TO UNITS TO BE VIA FLEXIBLE CONDUIT, PROVIDE SUFFICIENT SLACK TO ALLOW FOR UNIT MOVEMENT ON SPRING ISOLATORS. 11. ENSURE CROSS MEMBERS OF INTERSTITIAL FRAME AND BOTTOM SUPPORT FRAME ARE NOT DIRECTLY BELOW ENDS OF MODULES IN ALL LOCATIONS AND DO NOT BLOCK DRAINAGE WEEP HOLES IN BOTTOM OF UNIT CASING, FAILURE TO DO THIS MAY RESULT IN ICE DAMMING/BUILDUP BENEATH UNIT AND SUBSEQUENT BUILDUP OF ICE IN BOTTOM OF UNIT CASING BELOW COIL AND POTENTIAL DAMAGE TO BOTTOM OF COIL. 12. WHEN SELECTING SPRING ISOLATORS ALWAYS CONSIDER WEIGHT DISTRIBUTION BY REFERENCING EQUIPMENT WEIGHT AND CENTER OF GRAVITY. NEAR RIGHT ENDS OF UNITS (VIEWED FROM FRONT PANEL) SPRING WEIGHT CAPACITY MAY BE LARGER. IF HIGHER SPRING WEIGHT CAPACITY IS REQUIRED VS OTHER SPRING LOCATIONS, CONSIDER AN ADDITIONAL SPRING OF EQUAL "K" VALUE (Ibs/in) NEAR RIGHT END OF LAST MODULE. IN GENERAL IT IS RECOMMENDED TO SELECT ALL MOUNTING SPRINGS OF EQUIVALENT "K" VALUE (Ibs/in). VRF OUTDOOR UNIT MOUNTING DETAIL 1 211 = 1 1-011 R M; W a O �z CO Z zO t] LU C' J LL1 W 3;Z LU w V Q U) O�aM c� N L L0 N 00 CONSTRUCTION DOCUMENTS ISSUE DATE: JAN. 3, 2023 REVISION SCHEDULE Rev # Date Description RES U B 4/7/2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CONTENTS: MECHANICAL DETAILS B SCALE: 12" = 1'-0" DRAWN: Author CHECKED: Checker PROJECT NO: 2021031.00 SHEET: M8m02