Loading...
22156 Pt. Edwards 45 and 65 RCW SI ltrLACIFIC \/ ENGINEERING TECHNOLOGIES, INC. October 24, 2024 CITY OF EDMONDS BUILDING DEPARTMENT 121 - 51h Avenue North Edmonds, Washington 98020 Subject: Buildings 45 and 65 - Patio and Planter Waterproof Consulting Services Membrane Replacement Since 1960 POINT EDWARDS CONDOMINIUMS Principals Michael P. Smith, PE, SE 31 Pine Street Kyle J. Bozick, PE, SE Nathan L. Fritz, AIA Edmonds, Washington 98020 Ryan P. Barrett, PE Jeffrey M. Bozick, PE Christian E. Juenke, PE, SE Re: Permit Nos. BLD2023-0702, BLD2023-0703, BLD2023- 0710, BLD2023-0711, BLD2023-0712, BLD2023-0713, BLD2023-0714, BLD2023-0715, BLD2023-0716, To Whom It May Concern, Our firm has conducted periodic field reviews during the construction phase of the waterproof membrane replacement project at Buildings 45 and 65 of the Pt. Edwards Condominiums. It is our professional judgment that the specified repairs were completed in general accordance with our repair documents, appropriate to satisfy the requirements of RCW 64.55.005 through RCW 64.55.090 for those portions of the building that were repaired. Sincerely, PACIFIC Nathad4.. Fritz, AIA Principal TECHNOLOGIES, INC. 12363 REGISTERED ARCHITECT NATHAN LEE FRITZ STATE OF WASHINGTON cc: Mr. Eli Langdon, Pt. Edwards Condominiums Ms. Deb Carter, PRIME, Inc. Mr. Jared Brown, CDK Construction Services, Inc. Mr. Jay Edelman, CDK Construction Services, Inc. 22156 Pt. Edwards RCW Letter 1 2150 NORTH 107" STREET, SUITE 320 1 SEATTLE, WASHINGTON 98133 www.pacenQtech.com I Ph:206-281-7500