Loading...
APPROVED_BLD2022-0906+Transportation_Impact_Form+7.11.2022_10.28.49_AM+2980458RECEIVED BLD2022-0906 APPENDIX A Jul 11 2022 Ot ge] of2 CITY OFE���ERMIT EXPIRED WITH DEVELOPMENTTSERVI SERVI 1• DEPARTMENT � vy �� psp�qR13tgRl 1nLAna lysis W0MtRECTIONS PERMITTING & DEELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771. D220 www.edmondswa.gov Name of Proposed Project: V u ► ee Ii Joe- Owner/Applicant rVL4Ci 1�- (—JLA, 'tff'C) +;C>ta l✓lG . Name (055 E'd► oot' ds lja l Street/Mailing Address E, vwo ►ds (").A "980z 0 City Applicant Contact Person: Name 1 Street/Mailing Address ECI wAe"ds State zip City Telephone: t4 2-17- -7-7 6- 136; -2 toy 9�020 State zip Telephone: 17 - 1 2->( `! Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): W/�4 Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location -Street address: 11S `� ' Avg c� �u �V r'�k �zl� (Attach a vicinity map and site plan.) V " C i A "'tit IL1 Ar ova 'Fro' b. Specify existing land use: i7e41 es-(a-Fe-;�- c. Specify proposed type and size of development: c s- tzt- sic cl �j te�u' 1i 3cC)c-,f _ (# of residential units and/or square footage of building) �� �`a.�"�+s�' �4JW.�11t� d. Date construction will begin and be completed:.o-f O._teow e,' ,r e. Define proposed access locations: uo ,,, APPENDIX A Page 2 of 2 £ Define proposed sight distance at site egress locations: 2 7 t:. Cs 6,c k cmL'i `t . `� IMuG+ ��n our 5}�� 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use Spcc?�; I $ X $ X New Use Fee: $ - Prior Use Fee: $ kcx ❑ NEW DEVELOPMENT Units in Per Unit square feet, ITE Land Use Category Fee Rate # of dwelling, Fee vi , etc. New Use $ X — $ ❑ OTHER EPENDENT FEE CALCULATION: $240.00 (+ TOTAL TRANSPORTATION IMPACT FEE $ 7/21 /2022 City of Edmonds, -Engineering Division Approval Date No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.