APPROVED_BLD2022-0906+Transportation_Impact_Form+7.11.2022_10.28.49_AM+2980458RECEIVED BLD2022-0906
APPENDIX A
Jul 11 2022 Ot ge] of2
CITY OFE���ERMIT EXPIRED WITH
DEVELOPMENTTSERVI SERVI 1•
DEPARTMENT � vy
�� psp�qR13tgRl 1nLAna lysis
W0MtRECTIONS
PERMITTING & DEELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771. D220
www.edmondswa.gov
Name of Proposed Project: V u ► ee Ii Joe-
Owner/Applicant
rVL4Ci 1�- (—JLA, 'tff'C) +;C>ta l✓lG .
Name
(055 E'd► oot' ds lja l
Street/Mailing Address
E, vwo ►ds (").A "980z 0
City
Applicant Contact Person:
Name 1
Street/Mailing Address
ECI wAe"ds
State zip City
Telephone: t4 2-17- -7-7 6- 136; -2
toy 9�020
State zip
Telephone: 17 - 1 2->( `!
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): W/�4
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location -Street address: 11S `� ' Avg
c� �u �V r'�k �zl� (Attach a vicinity map and site plan.)
V " C i A "'tit IL1 Ar ova 'Fro'
b. Specify existing land use: i7e41 es-(a-Fe-;�-
c. Specify proposed type and size of development: c s- tzt- sic cl �j te�u' 1i 3cC)c-,f
_ (# of residential units and/or square footage of building)
�� �`a.�"�+s�' �4JW.�11t�
d. Date construction will begin and be completed:.o-f O._teow e,' ,r
e. Define proposed access locations: uo ,,,
APPENDIX A
Page 2 of 2
£ Define proposed sight distance at site egress locations: 2 7 t:. Cs 6,c k cmL'i
`t .
`� IMuG+ ��n our 5}��
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use Spcc?�; I $ X
$ X
New Use Fee: $ - Prior Use Fee: $ kcx
❑ NEW DEVELOPMENT
Units in
Per Unit square feet,
ITE Land Use Category Fee Rate # of dwelling, Fee
vi , etc.
New Use $ X — $
❑ OTHER
EPENDENT FEE CALCULATION: $240.00 (+
TOTAL TRANSPORTATION IMPACT FEE $
7/21 /2022
City of Edmonds, -Engineering Division Approval Date
No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.