Loading...
APPROVED BLD LIGHTING PLANS (2);; c� 0 ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE City Of Edmonds Building Department Work I,�y,13r��pGRADES - -- ............. ����3:::::: .............................. Address ; S \NAY Owner ' � L� ..... . Approved Date 11-zo- S Building Official Ert.(i �{ZY ........................................................: Permit Number BLD2020-1160 Zone Corner Flag Setbacks: Required Actual Front Sides Rear Other Height LIGHTING UPGRADES WELLS FARGO BRANCH NO. 192663 9727 EDMONDS WAY, CITY OF EDMONDS SNOHOMISH COUNTY, WASHINGTON DRAWING INDEX: SHEET No. DESCRIPTION C 1 COVER SHEET S 101 POLE DETAILS &CALCULATIONS DIRECTORY: RESPONSIBLE PARTY DISCIPLINE CONTACT INFORMATION NANNIS &ASSOCIATES STRUCTURAL ENGINEERING 1 (470) 655-2242 RESUB Nov 17 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT �y� ��� Facility Analysis t Engineering Z 0 a o' U w 0 n i a U rah V O � � O W z ��W � �°z W �W� ��w z�" � �wQ Z zz W ��w 3zz w w�� o � � �� 0 z cry o w Q� off �� � Qz W �C� c� � w � �o� ��� �w � z�� �� W u�� �� � zoo Hw � �z� x� U �o � Qo ►� � z �� PROJECT 006-272 DATE 09/14/20 SCALE DRAWN NONE MAS DESIGNED CHECKED NES NES zrx-��.j = s�f r � c, �f f_ �Rt�y -.s a.�. 09/17/20� OF REV 2 0 } 00 Jamie L. Davis, P.E. - PROFESSIONAL ENGINEER Page : 1 Project WELLS FARGO 192663 -Edmonds Project # : 200814 Location Edmonds. WA Eng : JDAVIS ��� 1'��b GEOCOORDINATES: 47.790809,-122.363754 �P� of�nsf� qG� SITE LIGHTING POLE TYPE A VW1" A VT1. �►-ViC? > +;o�o��z �� �• �.( .F J REFERENCE STANDARDS 2015(113C) International Building code, 2015 edition (AASHTO LTS) LRFD Specifications for Structural Supports for Highway Signs, Luminaries, and Traffic Signals, First Edition with 2015 - 2020 updates. (AASHTO) AASHTO LRFD Bridge Design Specifications, 8`h Edition (ASCE 7-10) Minimum Design Loads and Associated Criteria for Buildings and Other Structures DESIGN CRITERIA WIND SEISMIC Wind Speed : VULT = 1 10 MPH Ss = 1.28 IBC 1609.3 Exposure Category : C S1 = 0.449 Importance Factor : 1 SDS = 1.024 SD 1 = 0.449 Ground Snow Load : Pg = 20 psf Fv = 1.5 Elevation (Above Sea Level) : 328 ft SMi = 0.67 E7 11.4-2 Frost Depth : 18 in. Site Class D MATERIAL PROPERTIES SDC D Concrete Compressive Strength : f'c = � ksi R 3 ASC TBL15.4-2 Concrete Unit Weight : '�c= 150 pcf le 1 Steel Reinforcement : fy = 60 ksi T� b ASC FIG22-14 Steel Density : ys = 490 pcf T 0.21 E7 12.8-7 Aluminum Density : 7ei = 175 pcf Ts 0.44 1.5Ts 0.66 GEOMETRY POLE (by others) Pole Length : Lp = 23 ft Pole Base Diam. (o.d.) : QSpb = 4.00 in Pole Top Diam. (o.d.) : QSpt = 2.25 in Pole Wall thickness : Tp = 0.19 in ARM Depth to Arm : Larm = 0.25 ft Arm Diam.: QSarm = 3.00 in Arm Area = 0.01 ft.^2 Arm Wpll thickness : Ta = 0.19 in FIXTURE Fixture Type RSX2 LED-P1-40K-R4-MVOLT-RPA-DDBXD /POLE MOUNT / LITHONIA Mounting Height : Ht = 23.00 ft Fixture Length : FL = 29.30 in. # of Fixtures : 2 Fixture Width : FW = 13.40 in. Fixture Area 5.45 ft.^2 Fixture Weight : Fw = 39.00 Lbs Jamie L. Davis, P.E. - PROFESSIONAL ENGINEER Page : 2 Project WELLS FARGO 192663 -Edmonds Project # : 200814 Location Edmonds. WA Eng : JDAVIS DEAD LOADS (DC) Pole Weight Arm Weight Fixture Weight Misc Weight LIVE LOADS (LL) ICE LOADS (ICE) WIND LOADS (W) Velocity Pressure Coefficient Topographic Factor Wind Directionality Factor Ground Elevation Factor Velocity Pressure at height (h) Gust Factor Gross Area of Fixture Clearance Ratio (s�h) Aspect Ratio (B�s) Net Force Coefficient Design Wind Force (fixture) Design Wind Force (arm) Design Wind Force (pole) SEISMIC LOADS (EQ) Seismic Base Shear: Seismic Repsonse Coefficient: DCl = ((QJPOLE-B + OPOLE-T) x 0.5) x LPOLE x galuminum = 16.4 Lbs DC2 = �4RM x LARM x Yaluminum - O.2 Lbs DC3 = 78.0 Lbs DC4 = �4 � Lbs DL = 133.5 Lbs Not Applicable AASHTO LTS 3.6 Not Applicable AASHTO LTS 3.7 Kz = 0.92 Kzt = 1.00 Kd = 0.85 Ke = 0.99 qh = 0.00256 Kz Kzt Kd Ke V^2 (psf) qh = 23.94 psf G = 0.85 f As = 10.91 ft.^2 0.05 0.1 1 Cf = 1.81 Ff = 401.E Lbs Fa = 1.5 Lbs Fp = 176.3 Lbs �T M r ASCE7 29.3-1 ASCE7 26.6-1 ASCE7 26.9.1 ASCE7 29.4-1 V= 45.5846 Lbs ASCE712.8-1 Cs= 0.341 ASCE712.8-2 Cs= 0.713 T<T� Upper bound ASCE7 1 2.8-3 C5= 0.045 lower bound ASCE7 1 5.4-1 Cs= 0.127 Lower bound ASCE7 15.4-2 Project Location Jamie L. Davis, P.E. - PROFESSIONAL ENGINEER WELLS FARGO 192663 -Edmonds Edmonds, WA SUMMARY OF LOADS AND MOMENTS AT TOP OF SHAFT Load Case DC 1 Descri ion Pole Weight Load Dir. Load M Arm Direction (Lbs) (ff.) Y 16.4 0 DC2 Arm Weight Y 0.2 0.125 DC3 Fixt. Weight Y 78.0 0.125 DC4 Misc. Weight Y 39.0 0.125 LL live load Y 0.0 0 Wx pole Wind on Pole X 176.3 1 1.5 Wz fixt.+arm Wind Fixt.+Arm Z 403.1 23.0 Wz fixture Wind on Fixt. Z 401.6 0.8 Wz arm Wind on Arm Z 1.5 0.125 Wz pole Wind on Pole Z 176.3 1 1.5 SUMMARY OF LOADS AND MOMENTS AT TOP Axial = 0.1 34 kips Moment = 1 1.30 kip-ft. Shear = 0.579 kips LOAD COMBINATIONS OF SHAFT Load Combo Application DC LL W Strength 1 Gravity 1.25 1.60 - Extreme l a Wind max 1 .l 0 - 1.00 Extreme 1 b Wind min 0.90 - 1.00 Service 1 Translation 1.00 - 1.00 FOUNDATION DESIGN Shaft Diameter D = 2.00 ft. Ultimate Shear Strength for Cohesive Soil c = 0.13 ksf Factored Moment Mf = 14.13 kip-ff. Factored Shear Vf = 0.64 kip H = 22.16 q = 0.27 Embed. Length L = 8.52 ft. Max. Moment Mu = 16.12 kip-ft. Self weight of Pier 5429.8 Lbs. Unfactored Axial Load 5.56 kips Allowable End Bearing 1.50 ksf Skin friction : 0.68 ksf End bearing area : 3.142 ft."2 Bearing pressure : 1.771 ksf Interaction ratio : 0.81 MAX. AREA OF FIXTUR & ARM = 51/2 SQUARE FEET SEE ELECTRICAL DWGS FOR ALL OTHEI NOTES AND REQUIREMENT POLE, BASE PLATE 8r ANCHOR LIGHT POLE MANUF. 3 #3 HOOPS IN TOP 5 REM. 12"o.c. MAX. 6 #5 VERTICAL PLUS HOOK �, �� .; Mom•M M t.o.Caisson Direction (k-ff.) Z 0.00 Z 0.00 Z 0.01 Z 0.00 Z 0.00 Z 2.03 X 9.27 Y 0.32 Y 0.00 X 2.03 ,.,i AASHTO LTS C13.6.1.1 „�,,, L 371.45 9cD �I h� Page : 3 Project # : 200814 Eng : JDAVIS Broms Method G.C. TO VERIFY HOOPS AS ANCHOR BOLT HOWN, PATTERN WILL BE 12"O.C. M IN STEEL CAGE r, " CLR. FINISH GRADE OR PAVING � ° ..� ' - `o . a. N I I� II -w g w � P _ 4 _ �.; ; - '�. : CONCRETE- - -°' •`� • a J: P f'7 L i 6 #5 VERT.+ HK' 'ANCHORS FOR BASE PLATE - MUSTALWAYS FALL WITHIN CAGED REINF. HOOKS MAY BE ROTATED TO FACILITATE. INSTALLATION. PLAN AT BASE 0 Base Detail for Light Pole Type A -VW 1 Jamie L. Davis, P.E. Professional En inee 192663 - WELLS FARGO EDMONDS EDMONDS, WA PRIOR TO ANY INSTALLATION, G.C. SHALL FIELD LOCATE AND MARK EXISTING UTILITY LINES AND BUILDING FOUNDATIONS INS THE VICINITY OF T� PROPOSED POLE FOUNDATION. NOTIFY DESIGN TEAM OF ANY POTENTIAL INTERFERENCES. Site Light Pole Foundation A -VW 1 Project numbers 200814 Date 09/10/2020 RESU B Drawn b MG herby JD � 171/20zQP-0" 97��1�"T�N�i9449 PM w H a 0 w U �Z W w Z w O U O � z ``'Oa W `n W o Q z � W U z�z W �Wz z p�A �oz W � rs' O °` o�`fl � � rnlO PROJECT 006-272 DATE 09/14/20 SCALE DRAWN NTS MAS DESIGNED CHECKED JLD NES ��� ���� OF REV Facility Analysis f Engineering 2 0