APPROVED_ENG_PLN_BLD2022-0743+Site_Plan+6.7.2022_12.11.31_PM+2917126APPROVAL STAMP PAGE
PLEASE KEEP WITH THE PLANS
PERMITTING & DEVELOPMENT
BUILDING DIVISION
121 5th Avenue N
P: 1.0220
RECEIVED
www.edw.edmondswa.gov
Jun 08 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
MARTINEZ
24131 104TH AVE W EDMONDS, WA 98020
ALL DISTURBED SOILS SHALL BE
COMPOST AMENDED PER CITY OF
EDMONDS STANDARD DETAIL SD-642 OR
APPROVED EQUAL.
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
ENGINEERING D O v
APPROVED` n+� G
v
NON
LLB F S
PEG
DNS
BLD2022-0743
e'-, e?
v
Y PLANNING
P�`v 6/1.:/2022
08 p;L
PLC
�NSP
NOTE: This Stamp page must remain with the city approved plans at all times. Failure to have this
Stamp page with the City approved plans could result in delay of the inspections including the FINAL
inspection. If lost please contact the city as soon as possible to find a solution. Thank You.
_
- AL
36' long segment with 2' high trellis toppe
146' long an 6' high cedar fef*e,•
Public Storm Main = ;
approx locationj,
Jun 08 2022 �r
CITY OF EDMONDS
DEVELOPMENT SERVIC
DEPARTMENT tl�'