Loading...
APPROVED ENG PLN BLD2022-0462+Site Plan+4.28.2022City Of Edmonds Building Der nt Work REMOVE CONeA D SC�EPLACE WILL I Address Jtq J 84T -------------- '(` - - Owner END R -----•----------- --- -- ---------- Approved Date /21 Building Official: IV - • •------ ---- Permit Number BLD2022-0462 APPROVED BY PLANNING May 26 2022 TP1 (Soil) Date IDepthl DSL I Oil 02/01/221 8 1 ND I ND TP2 (Soil) Date JDepthl DSL I Oil 02/01/221 8 1 ND I ND TP3 (Soil) Date IDepthl Gas HVOCs 02/01/22 1 11 1 ND ND TP4 (Soil) Date JDepthl DSL I Oil 02/01/221 9 1 ND I ND TP5A (Groundwater) Date I DSL I Oil HVOCs 02/04/22 69 x ND ND Date lDepthl DSL /01/221 8 1 ND Geotech Consultants TP-6 (Soil) Date Depth Keroseen/Jet Diesel/Fuel Oil I Heavy I Fuel Oil 8/8/2001 5-8+ 1 360 1 ND I ND 0 = Test probe by RGI, 02/01/22 19 = Test probe by RGI, 02/04/22 6m = Test pit by Geotech Consultants, 08/08/01 C-7 = Former residence b = Standing water MFR = Multi -family residence SFR = Single-family residence — — = Property boundary TP6 (Soil) Date Depth HCID Gas DSL Oil 02/01/22 8 ND I D I ND TP9 (Soil) Date Depth DSL Oil /04/22 9 ND ND TP9 (Groundwater) Date I DSL Oil 02/04/22 350 x ND ® = Soil Analytical Results in mg/kg; Depth = Feet below ground surface TP8 (Soil) Gas = Gasoline total petroleum hydrocarbons (TPH) ate Depth DSL DSL/Oil = Diesel/oil TPH 02D01/22 6 ND HVOCs = Halogenated volatile organic compounds ND = Not detected above laboratory detection limits Bold results indicate concentrations above laboratory detection limits Bold and highlighted results (if any) indicate concentrations above MTCA Soil Cleanup Levels ® = Water Analytical Results in ug/L; Gas = Gasoline total petroleum hydrocarbons (TPH) DSL/Oil = Diesel/oil TPH HVOCs = Halogenated volatile organic compounds x = The sample chromatographic pattern does not resemble the standard used for fuel quantitation. ND = Not detected above laboratory detection limits Bold results indicate concentrations above laboratory detection limits Bold and highlighted results (if any) indicate concentrations above MTCA groundwater Cleanup Levels IE SFR 00 r+ s D (D SFR rD SF SFR SFR r------ I Former I Sheds/Barns I I \TP1� Vacant La I I TP3 I TP3A J 'SPECIAL iNSPECTION(S) REQUIRED FOR THIS PROJECT. PLEASE PROVIDE THE CITY INSPECTOR WITH THE APPROPIATE SI ■ DOCUMENTS. ■ 11. SOILS/GRADE MFR TP4 I MFR I I ICommercial/ Retail/ IRestaurants Ll TP5A J MFR ITPA i_ V TPI FIR 1\1M For Enlargement See Figure 2 —TPg Mark White TP8A Paint 238th Street Southwest ENGINEERING DIVISION APPROVED AS NOTED 06/17/2022 Haul Route - No left turn onto Highway 99 unless at a signalized intersection. OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. TP6A (Soil) Date Depth DSL /04/221 8 1 960 TP6A (Groundwater) Date 1DSL Oil /04/22 1170,000 1 ND TP8A (Soil) Date IDepthl DSL Oil 02/04/221 9 1 ND ND TP8A (Groundwater) Date IDSLH RECEIVE 02/04/22 NOD N DCs Apr 28 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Approximate Scale: 1"=80' 0 40 80 160 N Corporate Office Edmonds Terrace Development Figure 1 17522 Bothell Way Northeast RGI Project Number: Property Representation with Soil and Date Drawn: 9 W Bothell, Washington 98011 Groundwater Analytical Results 2022 04 Phone: 425.415.0551 2021-847-4 Y / ILU Fax: 425.415.0311 Address: 23625 84th Avenue West, Edmonds, Washington 98026