N SPECIAL INSPECTION AND TESTING AGREEMENT
Permit Number: BLID2022-0462
DRR Kirldand LLC and `iTPSP LLC,
Project: 23625 84t11 AVENUE WEST --
Prior to Issuance of a permit, this form must be completed in its entirety and retarued to flit, Clty for
approval. The compleled form must (rave signatures of acicnotpledgment 6y all pardes,
DUTIES AND RESPONSIBILITIES
j)ecial Inspection Firm and Special Insnectois
The Special Inspection firm of
will perform special inspection for the following types of work (separate forms must be submitted if more than one
firm is to be employed),
❑ Reinforced Concrete
❑ Bolting in Concrete
❑ Prestressed Concrete
❑ Shotcrete
❑ Structural Masonry
❑ Structural Steel/Welding
❑ High Strength Bolting
❑ Spray applied Fireproofing
❑ Smoke Control Systems
❑ Lateral Wood
❑ Structural Observation by design professional
® Grading/soils
❑ Retaining Wall Block lustallation
❑ Retaining Wall Footings
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified,
a detailed resume of the inspector and firin must be submitted. The resume must show that the inspector and the firm
are qualified by education and experience to perform the work and testing required by the project design and
specifications.
The -8vork shall be inspected for conformance with the plans and specifications approved by the City. Revisions and
addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall
include:
A daily record to be maintained on site, itemizing (lie inspections performed. Any nonconforming work shall
be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any
t►onconforntiug work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued, This report will indicate that inspection and testing was completed in conformance with (lie approved
plans, specifications and approved revisions or addenda, Any unresolved discrepancies must be detailed in
the final report.
Wdmsvr-userfsluserproi$\dnknu\Desklop\Comments Leiters and Special Inspection fomis 2019\Special lnspeclion fomM912022-0462 DRR KRInad I.LC
and VPSP LLC till gmde,does 5/16/2022
Contractor
The contractor shall provide (lie special inspector or agency adequate notification of work requiring inspection. The
City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and
the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties.
The special inspection tunetions are considered to be in addition to the nornutl inspections performed by the City and
the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or
other work covered until approval is given by the City inspector.
Buildlnt; DennrUment
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Desiull Pt•ofessionals
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained;
prior to walk shown on the revisions being perforated in the field.
Owner
The project owner, or (lie architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firn to perform in keeping with the requirements of the IBC, the approved plans
and this document, may void this agreement and the Building Official's approval of the special inspector. In such a
case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or
construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted
on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement. /
Owner: IA a c}-:-L Signature ^�— —Date 0
D r n R. Ness 2 ;�° r- � pate 5/20/20 2
Contractor: Holt Services, Inc. Signature —_ G (( r�,.,ra.,..,,
Arch/Engr: 011a. P u/ a S ,/,Signature _ ( V ^ Date 7_
Speciallnsp: 14:�kA G�!n,0 gSignature — _ Date 5127�2
Special inspection Agency: Alg-�11 r.}�� H, gnature to -PV/22
ACCEPTED FOR THE CITY OF EDMONDS 13U1LD1NG DIVISION
By: _ V _ w W �fs,x�� Date 6/01/2022
\\edmsvr•userrs\usetpro5\dakmi\Desktop\Connncnls Letters and Specinl Inspection forms 201MI)CC1e1 Inspection fMIM12022.0462 DIM Kliklnnd LLC
and M11 LLC fill gmde.Anx 5/16/2022