Loading...
BLD2022-0462+Applicant_Response+6.3.2022_5.15.46_PM+2911890LSyner RECEIVED gy 6/3/2022 CONSTRUCTION, INC. F EDM June 3, 2022 C EITYVELOPMON DS SERVICES DEPARTMENT To: Jennifer Lambert Oennifer.lambert@edmondswa.gov) Christina Barson (christina.barson@edmondswa.gov) From: David Cohanim (david@synergyconstruction.com) Re: Application #: BLD2022-0462 Project: Fill/Grade — Contaminated Soils Project Address: 23625 84th Ave W This message and supporting documents are provided in response to Plan Review Comments from City of Edmonds Engineering Division, requesting additional information, corrections, and clarifications regarding this project. Requests and responses follow. 1) Show a Haul Route to and from the Site. Please note that left turns onto Highway 99 from 2361 St SW will not be permitted. Response: A map indicating the Haul Route to and from the Site has been provided. 2) Provide a Dewatering Plan for the site. Response: A Dewatering Site Plan and comments have been provided. 3) Provide a profile showing that the excavation will not impact neighboring sites and structures. Response: An excavation profile has been provided, along with a narrative description from the Project Engineer. 4) Provide a TESC and Final Restoration Plan. The above referenced Dewatering Site Plan includes details regarding erosion control. The site will be restored by filling the excavated site with uncontaminated soil, and surface grading to bring the site level to its surrounding soil. Dewatering Layout/Erosion Control Notes Permit Application No. BDL2022-0462 23625 84th Avenue West, Edmonds _ a 7. Ir 00 < - - Z TP5/TP5A ■ � y C a . N �, •y� •�.♦ tom... .` r-f - • ___ JIL 4 Remedios Excavation TIa &. A 238th Street Southwest NOTES: Water will be pumped from excavation and conveyed to storage tank using HDPE or PVC pipe. Water will be transported off site for recycling/treatment at fully -permitted facility located in Seattle. Erosion control will consist of visgqueen sheeting for stockpile(s) and CB inserts = See Figure 2 = Test probes in vicinity of Remedial Excavation Site by RGI, 02/22 = Approximate Property boundary TOM TP6/TTP6A I~ TP9� I TP8 P8A 0 -L_J 1L r=....... ... 7M LIMY 1 f I A Approximate Scale: 1"= 50' Mmiiiiiip� 0 25 50 100 N Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone: 425.415.0551 IILEY Fax: 425.415.0311 Edmonds Terrace Development Figure 1 RGI Project Number: 2021-847-2 Dewatering Erosion Site Plan Date Drawn: 06/2022 Address: 23625 84th Avenue West, Edmonds, Washington 98026 mom 1 LW RILEYGROUP June 1, 2022 Liu Brothers LLC 1641 Evergreen Point Road Medina, Washington 98039 clo Lobsong Dargey — Anandacom Subject: Response to City of Edmonds Comments Terrace Place Edmonds 23625 84th Avenue West Edmonds, Washington 98026 RGI Project No. 2021-847-2 References: Geotechnical Report, prepared by The Riley Group, Inc. dated April 12, 2022 Review Comments, prepared by City of Edmonds dated May 24, 2022 Dear Mr. Dargey: As requested, The Riley Group, Inc. (RGI) has evaluated the impact to the neighboring property and provided response to Comment #3. Comment #3. Provide a profile showing that the excavation will not impact the neighboring sites and structures. RGI Response: The proposed remediation excavation is about 10 feet from the property line and 14 feet from the building. The maximum depth of the excavation will be about 15 feet deep and most of the excavation will be in very dense glacial till. The bottom of the excavation will be above the projected 45 degree line from the building foundation. Therefore, the proposed remediation excavation will not affect the neighboring building. When the excavation extends to the bottom 5 feet, it will be below the projected 45 degree line from the property line. Since the native soil is very dense and the excavation will last very short time, RGI doesn't believe that it will have any impact to the stability of the property. We trust the information presented is sufficient for your current needs. If you have any questions regarding this letter report or require additional information, please call us at (425) 415-0551. Sincerely, THE RILEY GROUP, IN( Ricky R. Wang, PhD Principal Engineer Attachment: Excavation Profile Corporate Office 17522 Bothell Way Northeast Bothell, Washington 98011 Phone 425.415.0551 4 Fox 425.415.0311 6l!/ZozZ www.riley-group.com 2-Story Commercial P.L. Building Concrete slab - on -grade IT Footing ND 350 ug/L \ Surcharge Zone Looking North Grass TP6A 51 Clean Soil Overburden —, __[ — — L 17.5' bgsl 17.5' bgs \ 20' 45' Pybu ppm 170,000 u P.L. 6' Depth to Groundwater 15' Depth to Remedial Excavation = Remedial Excavation & Dewatering Diesel -range total Petroleum Hydrocarbon Contaminated Soil & Perched Groundwater m (in blue) = Diesel Soil concentration (mg/kg) ♦ (in red) = Diesel groundwater concentration (ug/L) ND = Not detected at the analytical laboratory Practical Quantification Limit (PQL) Approximate Scale: 1"= 10' 0 5 10 20 N Corporate Office Edmonds Terrace Development Figure 2 17522 Bothell Way Northeast Bothell, Washington 98011 Phone: 425.415.0551 RGI Project Number: 2021-847-2 Cross -Section A -A' Date Drawn: 06/2022 ILEY Fax: 425.415.0311 Address: 23625 84th Avenue West, Edmonds, Washington 98026