May 27, 2021
Aire/Pro Inc.
2921 Meridian Avenue East
Edgewood, WA 98371
Attn: Mr. Scott Raeder
Re: Edmonds HVAC Curb Review
Dear Scott,
Attached is the analysis for the mechanical unit curb installation proposed in Edmonds,
WA. A new roof mounted HVAC unit is proposed to be added (1,150# maximum
operating weight) and a review was requested for the curb installation only. A cut sheet
for the HVAC curb is shown on sheet 2, with an installation detail on sheet 3. The
analysis determined there is no net overturning and the curb should be fastened for the
governing wind shear.
The unit shall be fastened to the curbing and the curbing fastened to the roof framing per
the manufacturers recommendations for 110 mph (ultimate) Exp B wind loading and
Seismic Site Class D (Sds=0.850) per the 2018 International Building Code. As a
minimum, the unit shall be attached with # 10 screws @ 12" o/c each side or per the
attached detail on sheet 3 of the analysis.
Sincerely,
POE Engineering, Inc. ii,
Alan F. Poe, P.E. ' o
Attachments
27060
riz -7 / +
POE Engineering, Inc.
Civil & Structural Engineering/Consulting
1314 8th Street NE, Suite 201
Auburn, WA 98002
(253) 833-4052 FAX (253) 833-4053
SHEET NO. OF
CALCULATED BY Acre DATE S /)' It-9Zt
CHECKED BY DATE
SCALE
v2n C�, L 7-C V ,C,-.9
q..Fv wr C�-sre h ov a ?e-
p-i✓iE ra. G t~i v ha t 4.1v A C. t
DE�4Gv GI►1r�ylrt.A — �Dl$ \�C.r
Se.E SST " 1,, ro+ . P 4E - �-& F� G.vn, St
\.� to dw t 1-0 rs c.aR.S
Sw 1p20 wC r `nr/
Fp o p ��5, w p (t h Z 44'
(i-P fSP
K.p�l,o
: a -45
de- ewe'
fro tJ euT o�a._°TVA..tia�v (J, f
Ham wv�
D PROD -am
z�
Installation
Figure 11. Step four
nels
8. Install three pieces of foam insulation and gasket. See
Figure 12.
Figure 12. Step five
Figure 13. Curb dimensional data — BAYCURB043
Note: Curb plenum drops/duct inserts were designed and tested to hold 250 lbs. Please ensure that duct drops are
supported per local building codes.
(�PNCE 36 lg1Q MMl
C EP` 4ll8 MM
34 3/8' 9 2
873 MM
<3<18-
i's
1 3/4- SVpp�V
44 MM
9114
2146/MM
YB--
rI2z9 512MM�
c�F
c
9
18 1/4•
470 MM
M 6 5/8"168 S1 MMJ
/GMM
is 1/2" 80 12" MM�'��iQ
y� 470 MM 2045 MM �Q
1' 83 J/8-
8"
5 MM
2130 MM �R tiF
25 MM 9�
34 3/8"
823 MM
4s J/8"
126J MM
50 1280�MM 91A MMl
21 c��p0.PNG� 36
MM
SP.c.V �ec� vs l: l� ��n VVi�yq
Strap, {�o� un� -1-c corb on
cj'l �o x S r1 e S w; jj\ 3/4 C4o�
10 ACC-SVN43N-EN
POE Engineering, Inc.
Civil & Structural Engineering/Consulting
1314 8th Street NE, Suite 201
Auburn, WA 98002
(253) 833-4052 FAX (253) 833.4053
'4y9'1' SE6.f i'APP1eaCa
Bo..zl '�!, tyu Tbc v uNtY
(—X } C; N /
iVIG•l'y'� luSVt..A'T�cr,..�
�1C.. it--LC��D ✓
SHEET NO.
CALCULATED BY
CHECKED BY_
SCALE
'L\o O-iv
Mi
DATE
DATE
�. � Vvl'C
F' idAe.7Co✓
V.X90�
14. /
C�1E;�.e+vJ
o.� x
-f 14�
STRUCTURAL NOTES:
DESIGN LOADS / CODES
Building Code-----------------_---__2015 IBC
Roof Snow Load ------ — --- _-------- _---- -------_25 PSF
Roof Sead Load------------------------ ------- 15 PSF
Wind Load Zone --- ------------------ —---------------- 110 MPH (Ultimate), EXP. B
Seismic ------------------------------- —------------------ Site Class D, Use Group 1
Sds = 0- BSca
GENERAL NOTES
All materials and workmanship shall conform to the drawings and the specifications (if any). During the
construction period the contractor shall be responsible for the safety of the building. The contractor shall
provide adequate shoring, bracing, and guys in accordance with all national, state, and local safety
ordinances. Any deviation must be approved prior to erection. All erection procedures shall conform to
OSHA standards. Any deviations must be approved by OSHA prior to erection.
Drawings/details indicate general and typical details of construction. Where conditions are not
specifically indicated but are of similar character to details shown, similar details of construction shall be
used subject to review by the Engineer.
Provide openings and supports, as required for heaters, mechanical equipment, vents, ducts, piping, etc.
All suspended mechanical equipment to be sway or laterally braced.
All information shown on the drawings relative to existing conditions is given as the best present
knowledge, but without guarantee of accuracy. Where actual conditions conflict with the drawings they
shall be reported to the Engineer so that the proper revisions may be made. Modification of details of
construction shall not be made without written approval of the Engineer.
STRUCTURAL TIMBER
Lumber shall be Hem Fir #2 Grade, E=1300000 PSI, unless noted otherwise. Studs shall be Hem Fir#2,
unless noted otherwise. All lumber shall be graded and stamped per WWPA and the 201SIBC. All
lumber shall be seasoned with moisture content not over 19%. Nail all framing using common nails
(typical) per Table 2304.9.1, 20101BC, unless noted otherwise.