Loading...
REVIEWED Sunrise of edmonds curb attachmentPOE Engineering, Inc. 10 CIVIL & STRUCTURAL ENGINEERING/CONSULTING �011i 1314 8TH STREET N.E., SUITE 201 rrf i AUBURN, WASHINGTON 98002 (253) 833 4052 FAX (253) 833 4053 May 27, 2021 Aire/Pro Inc. 2921 Meridian Avenue East Edgewood, WA 98371 Attn: Mr. Scott Raeder Re: Edmonds HVAC Curb Review Dear Scott, Attached is the analysis for the mechanical unit curb installation proposed in Edmonds, WA. A new roof mounted HVAC unit is proposed to be added (1,150# maximum operating weight) and a review was requested for the curb installation only. A cut sheet for the HVAC curb is shown on sheet 2, with an installation detail on sheet 3. The analysis determined there is no net overturning and the curb should be fastened for the governing wind shear. The unit shall be fastened to the curbing and the curbing fastened to the roof framing per the manufacturers recommendations for 110 mph (ultimate) Exp B wind loading and Seismic Site Class D (Sds=0.850) per the 2018 International Building Code. As a minimum, the unit shall be attached with # 10 screws @ 12" o/c each side or per the attached detail on sheet 3 of the analysis. Sincerely, POE Engineering, Inc. ii, Alan F. Poe, P.E. ' o Attachments 27060 riz -7 / + POE Engineering, Inc. Civil & Structural Engineering/Consulting 1314 8th Street NE, Suite 201 Auburn, WA 98002 (253) 833-4052 FAX (253) 833-4053 SHEET NO. OF CALCULATED BY Acre DATE S /)' It-9Zt CHECKED BY DATE SCALE v2n C�, L 7-C V ,C,-.9 q..Fv wr C�-sre h ov a ?e- p-i✓iE ra. G t~i v ha t 4.1v A C. t DE�4Gv GI►1r�ylrt.A — �Dl$ \�C.r Se.E SST " 1,, ro+ . P 4E - �-& F� G.vn, St \.� to dw t 1-0 rs c.aR.S Sw 1p20 wC r `nr/ Fp o p ��5, w p (t h Z 44' (i-P fSP K.p�l,o : a -45 de- ewe' fro tJ euT o�a._°TVA..tia�v (J, f Ham wv� D PROD -am z� Installation Figure 11. Step four nels 8. Install three pieces of foam insulation and gasket. See Figure 12. Figure 12. Step five Figure 13. Curb dimensional data — BAYCURB043 Note: Curb plenum drops/duct inserts were designed and tested to hold 250 lbs. Please ensure that duct drops are supported per local building codes. (�PNCE 36 lg1Q MMl C EP` 4ll8 MM 34 3/8' 9 2 873 MM <3<18- i's 1 3/4- SVpp�V 44 MM 9114 2146/MM YB-- rI2z9 512MM� c�F c 9 18 1/4• 470 MM M 6 5/8"168 S1 MMJ /GMM is 1/2" 80 12" MM�'��iQ y� 470 MM 2045 MM �Q 1' 83 J/8- 8" 5 MM 2130 MM �R tiF 25 MM 9� 34 3/8" 823 MM 4s J/8" 126J MM 50 1280�MM 91A MMl 21 c��p0.PNG� 36 MM SP.c.V �ec� vs l: l� ��n VVi�yq Strap, {�o� un� -1-c corb on cj'l �o x S r1 e S w; jj\ 3/4 C4o� 10 ACC-SVN43N-EN POE Engineering, Inc. Civil & Structural Engineering/Consulting 1314 8th Street NE, Suite 201 Auburn, WA 98002 (253) 833-4052 FAX (253) 833.4053 '4y9'1' SE6.f i'APP1eaCa Bo..zl '�!, tyu Tbc v uNtY (—X } C; N / iVIG•l'y'� luSVt..A'T�cr,..� �1C.. it--LC��D ✓ SHEET NO. CALCULATED BY CHECKED BY_ SCALE 'L\o O-iv Mi DATE DATE �. � Vvl'C F' idAe.7Co✓ V.X90� 14. / C�1E;�.e+vJ o.� x -f 14� STRUCTURAL NOTES: DESIGN LOADS / CODES Building Code-----------------_---__2015 IBC Roof Snow Load ------ — --- _-------- _---- -------_25 PSF Roof Sead Load------------------------ ------- 15 PSF Wind Load Zone --- ------------------ —---------------- 110 MPH (Ultimate), EXP. B Seismic ------------------------------- —------------------ Site Class D, Use Group 1 Sds = 0- BSca GENERAL NOTES All materials and workmanship shall conform to the drawings and the specifications (if any). During the construction period the contractor shall be responsible for the safety of the building. The contractor shall provide adequate shoring, bracing, and guys in accordance with all national, state, and local safety ordinances. Any deviation must be approved prior to erection. All erection procedures shall conform to OSHA standards. Any deviations must be approved by OSHA prior to erection. Drawings/details indicate general and typical details of construction. Where conditions are not specifically indicated but are of similar character to details shown, similar details of construction shall be used subject to review by the Engineer. Provide openings and supports, as required for heaters, mechanical equipment, vents, ducts, piping, etc. All suspended mechanical equipment to be sway or laterally braced. All information shown on the drawings relative to existing conditions is given as the best present knowledge, but without guarantee of accuracy. Where actual conditions conflict with the drawings they shall be reported to the Engineer so that the proper revisions may be made. Modification of details of construction shall not be made without written approval of the Engineer. STRUCTURAL TIMBER Lumber shall be Hem Fir #2 Grade, E=1300000 PSI, unless noted otherwise. Studs shall be Hem Fir#2, unless noted otherwise. All lumber shall be graded and stamped per WWPA and the 201SIBC. All lumber shall be seasoned with moisture content not over 19%. Nail all framing using common nails (typical) per Table 2304.9.1, 20101BC, unless noted otherwise.