REVIEWED BLD - BLD2022-0801+Structural+6.20.2022_3.01.41_PM+2942749Swires Bathrooms Remodel
Supplemental Information
Wall Removal and Relocation Evaluation
REVIEWED
BY
CITY OF EDMONDS
BUILDING DEPARTMENT
RECEIVED
Mike Swires Jun 222022
DMONDS
960 Viewmoor PI 'ELOPMETSERVI
DEVELOPMENT SERVICES
DEPARTMENT
Edmonds, WA 98020
425-772-6704 BLD2022-0801
mucklebuckle@gmail.com
Main Bedroom Bathroom and Closet
The south wall of the walk-in closet will be relocated approx. 2'2" south creating a larger closet that opens to
the bathroom. This wall is non -load bearing.
o l�A�I Zv b
LV�C
op
e f
b EN5UITE
6-4" X 5'-11 "
The images following page show the original floor plan, including notes about truss alignment and spacing, as
well as pictures from original framing that show truss placement.
1
The image on the left shows the approximate location pictures of the main bathroom framing are taken from.
Picture 1A shows the upper portion of the south wall between the closet and bathroom, which will be moved
2'2". Picture 1B shows the lower portion of the same wall. Trusses are visible in 1A, extending across the south
wall to the south exterior wall.
r�
J
I P,
7
L
Guest Bathroom
The internal wall of the guest bath, which includes a pocket door, will be removed to create a single open
space. This wall is non -load bearing.
The images following show the original floor plan, including notes about truss alignment and spacing, as well
as pictures from original framing that show truss placement.
The top image shows the approximate location pictures of the guest bathroom framing are taken from. In the
distance of Picture 2A is a window, and to the left of that is framing for the wall (with pocket door) that will be
removed. Above the window trusses are visible. Picture 2B shows the same location from a closer vantage.
Trusses are visible extending across the bathroom to the east exterior wall.
�
N
Pictures 2A ind
4
n
'Y
IL
w
ice" �l
fI Picture 2B
-Zast "d sir, T,L