Loading...
SEE RV1 APPROVED PLN BLD2023-1248+Architectural_Plan+10.5.2023_11.09.17_PM+3825127APPROVED NORTH ELEVATION PLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE City Of Edmonds Building Department ---------------------- Work DECK 960 VIEWMOOR PL SWIRES I Date: 1 /1212023 --------------------------- )fficial ; Eri & C&v to r ----------------------------------- amber BLD2023-1248 ------------------- APPROVED BY PLANNING iz Oct 20 2023 4-0 U N RECEIVED o WEST ELEVATION a) Oct 06 2023 U � CITY OF EDMONDS DEVELOPMENT SERVICES L Q DEPARTMENT (3 �/ V) �� ry ELEVATIONS SCALE: 1 if = 209-0" Mike Swires 9/25/23 960 Viewmoor PI Edmonds, WA 98020 425-772-6704 mucklebuckle@gmail.com A 1 o'o o'o 0 I■ ■ Hardware and fasteners in contact with I preservative -treated wood shall be of ■ hot -dipped zinc galvanized steel, I I stainless steel, silicon bronze or copper. ■ In the absence of manufacturer's I I recommendations a minimum of ASTM A 653 ■ type G185 zinc -coated galvanized steel, or I I equivalent, shall be used. ■ IRC R317.3.1 IBC 2304.10.5.1 I FLOOR FOUNDATION/FRAMING PLAN SCALE: 1 If = 4'-0" 0 N PROP LINE o. o.. o`o o.o 0 o. 06 Z Z Q 5.8 ft 10 -2.9ft 2.9ft Q o 0 Z Z 2i RAILING POSTS & =) Q INTERMEDIATE SUPPORT O fy_ BRACES (TYP) L.L L.L MIN. 36" HIGH RAILING RAILFX RFX400 CABLE RAILING OR SIMILAR RAILING POSTS @ 5'9" OC W/INTERMEDIATE SUPPORT BRACES (TYP) SURFACE MOUNT, INSTALL PER MFG RQMTS COMPOSITE TREX DECKING TREX UNDERDECK RAINESCAPE DRAINAGE SYSTEM INSTALL PER MFG RQMTS DECK 16.0 ft DECK FLOOR PLAN SCALE: 1 If = 4'-0" RECEIVED Oct 06 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Mike Swires 960 Viewmoor PI Edmonds WA 98020 U � N E o (D � U V) LL 9/25/23 11 If = 4'-0" 1 425-772-6704 mucklebuckle@gmail.com A2 SIMPSON LUS210 JOIST HANGERS SEE DETAIL 1 OPTION 2 ON PAGE A5 \ 2" x 10" PT HF JOISTS @ 12" OC (TYP) \ i" x 10" PT HF BEAMS (TYP) SIMPSON AC6 POST CAP _ OR SIMILAR (TYP) 6" x 6" PT HF POSTS (TYP) MPSON ABA66Z POST BASE / MIN 1" AIRSPACE OR SIMILAR (1 J Q W U w 0 \ �--+ NEW 18" x 18" x 12" CONC. FTGS. / NORTH ELEVATION W/ (2) #4 REBAR EACH WAY (TYP) Q) a) WEST ELEVATION RECEIVED o a) Oct 06 2023 U ^U CITY OF EDMONDS i DEVELOPMENT SERVICES Q DEPARTMENT L V J LW DECK DETAILS SCALE: 1 " = 4'-0" Mike Swires 960 Viewmoor PI Edmonds, WA 98020 425-772-6704 mucklebuckle@gmail.com 9/25/23 11 " = 4'-0" I A3 Sizing of Structural Elements Maximum Deck Joist Span �,c Joist Joist Spacing b inches Joist Back Span Size 2 16 1 24 4 6 8 10 12 14 16 18 Allow ble Joist Span Maximum Cantilever feet -inches Adjacent Joist Span feet 2x6 7-11 1 7-1 5-9 1-0 1 1-6 NP NP NP NP NP NP 2 x 8 10-5 9-5 7-8 1-0 1-6 2-0 2-1 NP NP NP NP 2x 10 13-3 1 11-6 1 9-5 1-0 1-6 2-0 2-6 2-8 NP NP NP 2x 12 15-5 13-4 10-11 1-0 1-6 2-0 2-6 3-0 3-3 NP NP a. Includes Incising Factor. b. When using composite decking, refer to manufacturer's installation instructions for maximum spacing of joists. c. Spans based on Doug Fir -Larch, Hem Fir and Spruce -Pine -Fir, No. 2 grade, wet service factor. Minimum Beam Size Deck Joist Span feet 6 1 8 1 10 12 14 1 16 1 18 Beam Size c,d,e Maximum eam SpE n a,b,d (feet -inches) 46 5-2 4-6 4-0 3-5 3-1 2-10 2-7 4x8 6-11 6-0 5-3 4-7 4-1 3-8 3-5 4x10 8-5 7-4 6-6 5-10 5-2 4-9 4-5 4x12 9-10 8-6 7-7 6-11 6-4 5-9 5-4 6x6 6-6 5-7 5-0 4-7 4-2 3-9 3-5 6x8 8-8 7-6 6-8 6-1 5-6 1 5-0 4-7 6x10 10-7 9-2 8-2 7-6 6-11 6-4 5-10 6x12 12-4 10-8 9-7 8-9 8-1 7-7 7-1 a. Spans based on Doug Fir -Larch, Hem Fir and Spruce -Pine -Fir, No. 2 grade, wet service factor. b. If 2x built up beams to make 4x or 6x beams, they shall be fastened with two rows of 10d (3-inch x 0.128-inch) nails minimum at 16 inches on center along each edge (507.5) c. Beam depth shall be equal to or greater than the depth of intersecting joist for a flush beam connection. d. Beam cantilevers are limited to the adjacent beam's span divided by 4. e. Includes incising factor. Maximum Deck Post Height Tributa Area e Post 20 40 60 1 80 100 120 140 160 Size c.d N aximum Deck Post Hei ht a feet -inches 44 10-0 10-0 8-7 7-0 5-8 4-1 NP NP 46 14-0 13-10 11-1 9-5 8-2 7-3 6-4 5-4 6x6 14-0 14-0 14-0 14-0 14-0 13-3 10-9 6-11 8x8 14-0 14-0 14-0 14-0 14-0 1 14-0 14-0 14-0 a. Measured from t e un erside of the beam to top of footina. b. Based on Doug Fir, Hem Fir and Spruce -Pine -Fir, No. 2 grade, wet service factor. c. Notched deck posts shall be sized to accommodate beam size. d. Includes incising factor. e. Area, in square feet, of deck surface supported by post and footing. Footing Size a Tributary Area b Side of Square Footing (inches) Diameter of a Round Footing inches Thickness {inches} 5 7 8 6 20 12 14 6 40 18 20 6 60 21 24 8 80 25 28 9 100 28 31 11 120 30 34 12 140 33 37 13 160 1 35 1 40 15 a. Footing dimensions shall allow complete bearing of the post. b. Area, in square feet, of deck surface supported by post and footings. 12" min. frost depth in allowable soils Grade e Thickness °. per Table — Manufactured post connector 12" t1" Note: Posts must be Wldth 1/2" diameter per through -bolts In both cantered on or in footing Table directions Note: not screws DETAILS AND NOTES RECEIVED Oct 06 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 4" gravel 07 Q w Y U w 0 W O z 0 z Q Typical P.T. post • • I-11 4_0 e V ^^E' W • E Ut) � Ca Min. 12" of Q embedment (3) U) ry Mike Swires 960 Viewmoor PI Edmonds, WA 98020 425-772-6704 mucklebuckle@gmail.com 9/25/23 Deck Ledger and Connections Deck Ledger Connection to Band Joist On -Center Spacing of Fasteners inches Joist Span c (feet) '/z-inch diameter lag screw with '/2-inch maximum sheathing b.c.e 'h-inch diameter bolt with '/2-inch maximum sheathing D '/z-inch diameter bolt screw with 1-inch maximum sheathing d 6 22 36 35 8 16 31 26 10 13 25 21 12 11 20 17 14 9 17 15 16 8 15 13 18 7 13 11 a. Ledgers shall be flashed in accordance with Section R703.4 to prevent water from contacting the house band joist. b. The tip of the lag screw shall fully extend beyond the inside face of the band joist. c. Sheathing shall be wood structural panel or solid sawn lumber. d. Sheathing shall be permitted to be wood structural panel, gypsum board, fiberboard, lumber, or foam sheathing. Up to 1/2-inch thickness of stacked washers shall be permitted to substitute for up to 1/2-inch of allowable sheathing thickness where combined with wood structural panel or lumber sheathing. e. For on -center spacing of specialized fasteners refer to the manufacturer's installation instructions. Placement of Lag Screws and Bolts in Ledgers and Band Joists Minimum End and Edge Distance and Spacing Between Rows Top Edge Bottom Edge Ends Row Spacing Ledger' 2 inches d 3/4 inch 2 inches b 1-5/8 inches b Band joist ` 3/4 inch 2 inches e 2 inches b 1-5/8 inches b a. Lag screws or bolts must be staggered from the top and bottom along the horizontal run. See figure below. b. Maximum 5 inches. c. For engineered rim joists, the manufacturer's recommendations govern. d. The minimum distance from the bottom row to the top edge of the ledger must be in accordance with figure below. e. 2 inches may be reduced to 3/4-inch when the band joist is directly supported by a mudsill, header, or by double top wall plates. DETAILS AND NOTES EXTERIOF EXISTING STUI Existing 2x BAND JOIST OR ENGINEERING RIM BOARD 2" min. 5" max. Hold•downor tension device w,th 1500 # capacity Flashing Deck Joist Lag screw or bolt �i2" min. Minimum edge distance for specialized screws. See manufacturer's technical bulletin. Ledger DECK JOIST _AG SCREWS OR BOLTS JOIST HANGER Stagger fasteners in 2 rows 5 112" min. for 2x8 ' 6 112" min. for 2x10 7 112" min. for 2x12 --k 3/4" min. ' Distance can be reduced to 4 112" if lag screws are used or if bolt spacing is reduced to that of lag screws to attach 2x8 ledgers to 2x8 band joists Detail 1 — Ledger Attachment for Lateral Loads (Knee braces are required on posts greater than 4 feet in height.) Option # 1 Floor sheathirih nailing at 6' o.c (ma ) co joist with hold -dowP Sheathing Siding Flashing Decking Joists Joist Hangers Treated 2x ledger Floor st 7509 capacity holddown i at 4 locations evenly distr along the deck and within each end. Install per manuf� Fully threaded 318" diameter I: predrilled with a minimum or s in embedment into solid framing. RECEIVED Oct 06 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 2' min. or joists VFJI<IV11 " L Mike Swires 960 Viewmoor PI Edmonds, WA 98020 425-772-6704 mucklebuckle@gmail.com J_ Q W 0 U w 0 U N 0 U) v! w O Z 0 Z Q 9/25/23 A5 Deck Construction Notes Connections and Fasteners (All fasteners, nails, bolts, screws, and connectors must be corrosion resistant.) Type of Connection: Notes: Manufactured Connectors Follow manufacturer's instructions Post to Footing Post base is required Post to Footing (High Winds) Consult with jurisdiction about additional uplift loads where wind exposure is greater than Risk Category B Post to Beam Connector is required Ledger to House Framing See information on Sheet 5 and Sheet 6 Joist to Beam or Girder 3 8d — Toe nailed Blocking or Bridging to Joist 2 10d — Toe nailed at each end Wooden Deck Boards 2 8d threaded nails OR 2 No. 8 scre,.vs Composite Decking Follow manufacturer's instructions • Design loading for decks is based on 60 pounds per square feet (PSF) live load, 10 PSF dead load, and 1500 PSF soil -bearing capacity. • The illustrations and information in this tip Sheet may be used for decks whether or not they require a permit. See Tip Sheet 0 for when a permit is required. • All wood must be pressure -treated or naturally resistant to decay. Treat cuts. holes, and notches with end -cut solution. • Fasteners, hangers, nails, etc., must be stainless steel, hot -dipped galvanized. or as specifically required for the specified wood preservative used. The coating weights for zinc -coated fasteners to be in accordancewith ASTM A 153. Provide documentation in the field showing the required fastener protection for the wood chosen for your deck. • You may modify any components of this Tip Sheet using accepted engineering practices. Any modifications must be reviewed prior to permit issuance. All attachments must be per manufacturer's installation instructions. • Visit MyBuildingPermit.com for additional Tip Sheets for stairs, handrails, and notching and Post to Beam Connection with Knee Brace boring. U) (Knee braces are required on posts greater than 4 feet in height.) J 36" minimum high guard F--- Ill Or 113 the height of the post, ---_ with intermediate rails Attachment of w whichever is greater Beam splices must occur spaced so that a sphere pre -manufactured guardal 4" in diameter cannot systems to deck components Q Q over posts with 1.112" min. bearing Existing building shall be per manufacturer. Corrosion resistant, ��� Flashing Sheet 3ass ) ugh (See Tip Special blocking details may be Y z Min. required by the reviewer. metal column cap. Girder beam See detail 1 on page U Ili Follow manufacturer's s for ledger Refer table on page See page 8 for guardrail w z installation instructions. attachmentDeck! 3 for Joist and Spans ��� post connection Q Ile �`� • `� , 1 Secure ballusters with (1) #8d ` ( wood screw top & bottom spacin Refer to Table on page 3 for recommengded Beam Size and Spans r 46" 4 x 4 knee brace Note. fordralnage Contractor to field verify adequacy of Knee braces are required 'ti sold lumber for ledger distance from grade to top of (1 ) 3/$" diameter thrU-bolt or 112 " connection. ff an exit or egress from ponsteeds 48". see detai la screws with washers, to 8 bottom the existing building page Alternate Knee Brace Detail. 9 P �- passes under the 2x4 knee brace face nailed ea. side of ` (typical) proposed deck, or if there Far post size and maximum Is an existing patio under alowable height, see page 4 post and beam with 4-16d nails at each Pressure treated the pproposed deck, 6'-8" face and connection wood post minimum clearance must be maintained. Please Indicate openings In Manufactured post base cast in existing wall In elevation footing view. Refer to Table on page 4 for Footing Size 3,000 psi concrete (no special inspection required) i"' _�e C: ile­ Finished grade 0 1"dear Minimum I 1 �ll (2) #4 ea. way, 3" clear de th of I III� I _ I .y I —I to bottom of footing. footing 12" IF71hll�ll_ 1= Footing to bearon (� undisturbed earth. v! n/ DETAILS AND NOTES RECEIVED Mike Swires 9/25/23 Oct 06 2023 960 Viewmoor PI CITY OFEDMONDS Edmonds, WA 98020 DEVELOPMENTSERVICES 4257726704 DEPARTMENTMENT - - A6 mucklebuckle@gmail.com