Loading...
REVIEWED BLD2021-0775+Structural_Analysis_or_Calculations+6.7.2021_12.55.06_PM+22354321 of 23 REVIEWED BY CITY OF EDMONDS LONGITUDE ONE TWENTY° ENGINEERING & DESIGN Calculation Package for Foundation Stabilization/Left STRUCTURAL ENGINEER L120 ENGINEERING & DESIGN 1315091"PLNE KIRKLAND, WA 98034-5901 10623 229th PI SW, Edmonds, WA 98020 Project No: 5210419-2XR June 3, 2021 Prepared for: R&R Foundation Specialist 3409 McDougall Ave, suite 204 Everett, WA 98201 P: 425.760.5071 CONTACT: MANS THURFJELL, PE EMAIL: MTHURFJELL@L120ENGINEERING.COM PHONE: (425) 636-3313 RECEIVED Jun 07 2021 CITY OF EDMONDS DEVELOPMENTSERVICES DEPARTMENT LT 'ENGINEERING&D- ,. (425) 636-3313 L120Engineering.com LOCATEPILEWITHIN '.. I 0" OF OPENING LOCATE PILES WITHIN 3'-0" OF CENTER PILE CORNER 27' BETWEEN OPENING AND CORNER - (2)PILES @ - 8'-0" O. .MAX (4) PILES @ ]'-0" O.C. MAX LOCATE PILE WITHIN LOCATE PILE WITHIN 6'-0".OF CORNER N T-O" OF CORNER SSE B' 1 14 10' 1 ' IS. �5 5/B -3 12 11 g �Q Y tfi Pol .'Kane W �aam U JO �Gea a 5 R = ExIs0El8 Post 17. 3R tl4r -1I4 -1 y =SE F.I. Pil. 2 3l4 3/4 '. An=Crack in Fountlation � 3/B Poly�Oeimane 3 '] -119 -73 2 Q 27' U `LIT a O 1 1 1/4 -]/B�o LOCATE PILE WITHIN Y-O" OF CORNER R&R LEVEL SURVEY SEE STRUCTURAL CALCULATION PACKAGE FOR ADDITIONAL REQUIREMENTS SITE PLAN LEGEND PARCEL NO. 00610500000300 ■ EXISTING RESIDENCE STRUCTURE LEGAL DESCRIPTION EXISTING ADJACENT STRUCTURE WESTGATE MANOR BLK 000 D-00 - LOT 3 _ AREA OF PROPOSED WORK OWNER NAME 8 ADDRESS ---- PROPERTYLINE PETERSON ERIC A&PEGGY 10623 229TH PL SW, ' APPROXIMATE DIMENSION EDMONDS, WA 98020 PROPERTY LINE i_________ _____________i i ! ZI ZI 0 a w 4 ¢14 W wl� 0Io si m ! z ! ! oryo o - �� ! ! wn K ED _ o0 w SITE PLAN ! 3 N ! -9 III I U I •p o �rv��n� -WATER-wATFR-IwAIER__ ATFA� TELL a%yj6wE- ATFR-wATFR- n 84'•0" 229TH PL SW OVERALL PARCEL PLAN PILE SPACING S LOAD REOUIRMENTS TABLE PILES PILE PILE TYPE MAXO.C.SPACING,R MIN VERTICAL CAPACITY, kip. PROOF TESTING LOAD, kip. LOCATION PILES END OFFSET ALLOWABLE LOADING % MIN VERTICAL CAPACITY (MIN ULTIMATE CAPACITY) 1-6 HELICAL 7-0'UNO PER PLAN 110Mp 220 bp TYP 10-11917-18 HELICAL 7'0`LINO PER PLAN 130 up 28.OMP TYP 12-16 HELICAL "UNO PERPLAN 1501op 300k* TYP 7E HELICAL IT-WUNO PER PLAN 100 Np 211.O kq TYP NOTES: a. MINIMUM AND MAXIMUM INSTALLATION TORQUE FOR HELICAL ASSEMBLIES SHALL BE SPECIFIED BY THE PILE MANUFACTURER. THE MINIMUM INSTALLATION TORQUE SHALL BE HIGH ENOUGH TO ACHIEVE THE REQUIRED BEARING CAPACITY LOADING INCLUDING ASAFETY FACTOR NO LESS THAN 2. THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF THE PILE SHAFTS OR ANY PART OF THE PILE ASSEMBLY. MAXIMUM INSTALLATION TORQUE RATING OF S300FT•LB6 FOR A 2-718 INCH DIAMETER HELICAL PILE WITH 0.203INCH SHAFT WALL THICKNESS PER ESRJ750. b. FOR HELICAL PILES, PER IDEAL GROUP DWG NO.: 278TFG, THE ALLOWABLE STRUCTURAL CAPACITY FOR THE 2718" TRU-FORCE UNDERPINNING BRACKET IS LIMITEDTOWKIPS. c HE LICALASSEMBLIESAS MANUFACTURED BY IOEAL.144NUFACMRING, INC., IN ACCORDANCE WITH ESR-3750. I PILE OR ANCHOR LOADS NOT TO EXCEED MAXIMUM CAPACITY AS DETERMINED BY THE MANUFACTURER FOR ANY PART OF THE ASSEMBLY e. MAXIMUM ON -CENTER SPACING LISTED FOR TYPICAL PILE INSTALLATION UNLESS NOTED OTHERWISE ON PLAN. CENTER PILE BETWEEN OPENING AND CORNER LOCATE PILE WITHIN 6'-0" OF CORNER 1 X U 9 o m FOUNDATION NOTES 1. VERIFY ALL DIMENSIONS ON SITE. 2. FOUNDATION DIMENSIONS ARE TO OUTSIDE FACE OF CONCRETE STEM WALL PER RBR LEVEL SURVEY. 3. REFER TO THE FOLLOWING DETAILS FOR ADDITIONAL INFORMATION: HELICAL PILES.......... ............ ...- .............. 115D1.1 4. REFER TO STRUCTURAL CALCULATONSPACKAGEDATED JUNE 3,2021,FOR ADDITIONAL INFORMATION, SPECIFICATIONS,ANDREQUIREMENTS. 5. LEVEL SURVEY PER RBR REPAIR PLAN DATED FEBRUARY A,Ml. REFER TO STRUCTURAL CAICUJATAXIS PACKAGE FOR MODIFICATIONS AND ADDITIONAL REQUIREMENTS FOR REPAIR FILM. 8. MINI MUM PILE DIAMETERSHALLBE2-718°. 7. IT IG ACCEPTABLE TO INSTALL PILES AT THE SPACING SHOWN WITH t 96 TOLERANCE MALLOW FOR UNEXPECTED OBSTRUCTIONS ENCOUNTERED DURING PILE INSTALLATION PROVIDED THAT NO TWO ADJACENT SPANS EXCEED THE SPACING LIMITATION AS INDICATED ON LEVEL SURVEY. 8. IF REQUIRED ALL SUPPLEMENTAL CHANNELS TO SPAN FROM PILE TO PILE AND EXTEND MIN B' PAST SUPPORTING PILE EA END. 9, IF REQUIRED ALL SUPPLEMENTAL CHANNELS TO BE ANCHORED TO THE FOUNDATION WITH 5 T DIAM. SIMPSON TITEN HD SCREW ANCHORS OR APPROVED EQUIVALENT) ATA MAXIMUM SPACING fYOC WIMIN /'EMBED. ANCHORS TO BE CENTERED ON OR INSTPLLEDPBOVE THE CENTER LINE OF THE CHANNEL. 10. FIELD VERIFY ALL EXISTING STEM WALLS AT AND BETWEEN PILE ATTACHMENT LOCATIONS ARE T THICK MINIMUM WITH Y4E HEIGHT (MEASURED FROM BIFTG TO TICONC) MINIMUM. 11. PARCEL DIMENSIONS APPROXIMATED BY SNOHOMISH COUNW ASSESSOR GIS MAPPING TOOLS 8 TAXSIFTER INCLUDING THE SELECTED PARCEL. PROPERTY DIMENSIONS ARE APPROXIMATE FOR REPRESENTATIVE PURPOSES ONLY. NOT TO SCALE. NOT TO BE USED FOR LEGAL PURPOSES OR IN PLACE OF A FIELD SURVEY. 12, SITE FEATURES ME EXISTING STRUCTURES ON ADJACENT PARCELS NOT SHOWN FOR CLARITY. 13. PILES SHALL BE INSTALLED TO A MINIMUM EMBEDMENT OF 5'4' OR UNTIL REFUSAL, WHICHEVER IS SHALLOWER. HELICAL PILE REFUSAL CRITERIA: TORQUING OF THE PILE SHALL CONTINUE UNTLA HYDRAULIC PRESSURE IS ACHIEVED TO PROVIDE THE SPECIFIED MINIMUM VERTICAL CAPACITY WITH ASAFETY FACTOR OF NO LESS THAN TWO. ADVANCEMENT SHALL BE HALTED IMMEDIATELY IF THE STRUCTURE BEGINS TO EXPERIENCE UPLIFT FLEXURE. E DECK LLOCATE PILES WITHIN LOCATE PILE WITHIN 3'-O" OF CORNER 2'-0" OF OPENING 6(20) PILES @ OC_ ...-... . .. ...................................................................................... MAX ,�(4) PILES @ T 7'-0" O.C. MAX 71 81 9i U121 13.E i 15y U O m i U E GARAGE O U) a AREA OF WORK 1 LOCATE PILE WITHIN 22'-0" 2'-0" MAX OF CORNER :...................................................................: (E) RESIDENCE 10623 229TH PL SW, EDMONDS, WA 98020 Ali E PORCH LOCATE PILE WITHIN T-O" MAX OF CORNER SITE PLAN PRO]ECT NAME 10623 229TH PL SW, EDMONDS, WA 98020 5210419-2XR FY C IEam m - MRT SHEF DATE - 06/03/2021 s: aLE NOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS. PROJECT LONGITUDE SUBJECT ONE TWENTYO ENGINEERING & DESIGN BY FY PROJECT NO. SHEET NO. S210419-2XR 10623 229TH PL SW, EDMONDS, WA 98020 Foundation Stabilization/Jackin DATE 06/03/2021 Scope/Objective: To determine the required pile spacing and geometry to stabilize and lift (where required) the existing structural foundation. These findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the existing structure above (based on as -built assessments). The R&R Foundation Specialists' (R&R) proposed pile layout can be found in the following pages with structural recommendations based upon the findings of L120 Engineering & Design. Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the structural scope presented here. It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl -space support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support posts, adjustable post -base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas shall be monitored and further adjustments shall be made if necessary. Structural Summary: - The foundation of the residence consists of continuous cast -in -place concrete stem wall and concrete strip footings. Below the footings, piles are to be spaced at a distance no larger than 7'-0" on -center at the locations indicated on the attached Level Survey. Piles to be installed in accordance with SSK-01. - End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance as per plan. - A maximum allowable loading of 2,080 plf was utilized in this analysis. This was determined through inspection of building geometry and conservative span/tributary loading assumptions based on standard construction practices - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment assemblies with capacities equal to or greater than the indicated load values. Allowable Load Capacity Requirement: Helical Pile: #1-6 @ T-0" Max ....................................................... 11.0 kip minimum vertical capacity (allowable load) Helical Pile: #10-11 &17-18 @ T-0" Max ....................................... 13.0 kip minimum vertical capacity (allowable load) Helical Pile: #12-16 @ T-0" Max ................................................... 15.0 kip minimum vertical capacity (allowable load) Helical Pile: #7-9 @ 10'-0" Max ..................................................... 10.0 kip minimum vertical capacity (allowable load) Note: Refer to the attached General Notes for additional requirements. - As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or expected additional structural analysis will be required. Structural recommendations contained in this package are based on site photographs, dated February 26, 2021, provided by R&R. To the knowledge of L120, a geotechnical investigation was not performed on this site. Consequently, all structural recommendations assume adequate soil conditions to obtain the required pile capacities. Please inform L120 of site -specific conditions that were unconsidered by, may conflict with, or otherwise compromise the recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage, or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need to be revisited to consider and address the new findings Refer to the following pages for pile and connection specifications. L120 ENGINEERING & DESIGN Cl9W491 GENERAL NOTES HELICAL PILES 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE (IBC). 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC., AND SHALL BE IN ACCORDANCE WITH ESR-3750. 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 7. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. 14. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2012 IBC SECTION 1705.9 MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: A. PRODUCT MANUFACTURER B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS, EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT USED, AND THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS E. ANTICIPATED AND ACTUAL PILING DEPTH F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. HELICAL PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE (IBC). THE MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. 3 r49] GENERAL NOTES STRUCTURAL STEEL 1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". 2. MATERIALS: BOLTS - ASTM A307, UNLESS OTHERWISE NOTED ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI) 3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. WHERE ON -SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2012 IBC SECTION 1705.2 IS ALSO REQUIRED. CONCRETE 1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC. 2. MINIMUM CONCRETE STRENGTH (28 DAYS): FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX BASEMENT FOUNDATION RETAINING WALLS .......................3,000 PSI - 5 SACK MIX SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX SLAB -ON -GRADE... EXPOSED WEATHERING SURFACES ...... 3,000 PSI AIR -ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE 3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE SURFACE WATER. 4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS. 5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP. GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING APPROVED ADMIXTURES. 6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM. 7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER. 8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR COLD WEATHER. 9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL. 10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG -TIE, HILTI, OR EQUIVALENT. SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER. LONGITUDE ONE TWENTY° ENGINEERING & DESIGN .. PROJECT NO. SHEET NO. S210419-2XR PROJECT 10623 229TH PL SW, EDMONDS, WA 98020 SUBJECT Stabil-Loc Concentric Pile Installation Chart BY FY DATE 06/03/2021 Idea! Foundation Systems 2-7/8"0 Helical Pile (0.203-inch wall thickness) -Soil Capacity per ESR-3750 DIGGA 6K Drive Head Pressure Torque Correlation Factor, K, Ultimate Axial Compressive Allowable Axial Compressive L120 ENGINEERING &DESIGN LONGITUDE ONE TWENTY° ENGINEERING & DESIGN PROJECT NO. SHEET NO. S210419-2XR PROJECT 10623 229TH PL SW, EDMONDS, WA 98020 SUBJECT Stabil-Loc Concentric Pile Installation Chart BY FY DATE 06/03/2021 Ideal Fotwrdatron Systems 2-7/8"0 Helical Pile (0103-inch wall thickness) -Soil Capacity per ESR-3750 C IGGA SOK Drive Torque Correlation Factor, IC, Ultimate Axial Compressive Allowable Axial Compressive L120 ENGINEERING &DESIGN 8 of 23 DocuSign Envelope ID: E4499F3C-56A3-4004-803A-190AC9EE6A58 Friday, February 26, 2021 SCOPF OF WORK FOUNDATIONI Crew will install 18 helical piles to lift foundation to maximum structural recovery. Crew will do 12 concrete remove and repalace. 50% down & 50% due upon job completion. Piles bid to 25ft depth, $20 per foot beyond that depth. Crawlspace height is 4 feet. Has partial dingo access, most piles will be driven by hand and parking is not a problem. Whomever represents home will need to be onsite upon crew arrival and and upon completion of work. L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and that the maximum indicated pile spacing is achieved. NOTES: 1. It is acceptable to install piles at the spacing shown with ± 0'-6" tolerance to allow for unexpected obstructions encountered during pile installation provided that no two adjacent spans exceed the spacing limitation indicated. 2. End piles are to be placed as close to corners as possible and shall not exceed a maximum corner distance specified below. LcVEL SURVEY LOCATE PILE WITHIN 2'-0" OF OPENING CENTER PILE BETWEEN OPENING AND CORNER LOCATE PILE WITHIN I 6'-0" OF CORNER 7 3/8 u-L LOCATE PILES WITHIN 3'-0" OF CORNER 27' _--.— (2) PILES @ 8'-0" O.C. MAX (4) PILES @ 7'-0" O.C. MAX cli 8.5' >-2 5' 13 -5 5/8 3 12 1 7/8 10 X - 6 Q Poly rethane FoC am J U 11 O 5 0 N , -1 7/8 -3/8 U 44 -2 3/4 -1/4 -3/4 O a) _ 1 1 1-3/8 ■■■■■■■■■■■■■ ■■■ LOCATE PILE WITHIN / 1 •:► V ■Oil ■■■ ■■■■■ ■■■■■■■ ■■■■■ ■■■■■■ 1 • Post so �� •= 3" Helical Pile ON ■I m =Crack in Foundatio Polyy�urethane tJ 34 Foam 17 1 1 /4 -7/ p _ -1 /2 0 � -1 3/4 1 --- - 27 < 18 ro 271 w U - J 1 1 1 /4 r7/8 — — LOCATE PILE WITHIN 2'-0" OF CORNER DocuSign Envelope ID: E4499F3C-56A3-4004-803A-190AC9EE6A58 9 of 23 Friday, February 26, 2021 JUb HHOTOS W . Location of piles 7 - 9 and concrete to be remove and replaced. Hot tub will not need to be moved FOUNDATION SPECIALIST J li 9 AM�t i1 � � y a • ram..-�r5; -mod, Location of piles 1 - 6 on exterior, Homeowner will move plants Location of piles 12 - 16 in crawlspace. Crawlspace height is 4 feet Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -L120 10 of 23 PROJECT NO. NO. S210419-2XR SSK-01 PROJECT 10623 229TH PL SW, EDMONDS, WA 98020 LONGITUDE SUBJECT ONE TWENTY ENGINEERING & DESIGN BY FY (E) WOOD FRAMED FLOOR SYSTEM, FIELD VERIFY 8" MIN THICKNESS, CONTRACTOR TO VERIFY Foundation Stabilization/Jacking Tryd O L}L 4 = Q � z�w V d N O ~ U N o d —"'1=IIII=IIII=IIII=IIII=IIII=III ° -""—"" =IIII=IIII=IIII • d d =IIII—IIII—III d d . '=IIII=IIII • IIII=IIII=III ° ° '—IIII— 11=IIII=IIII=IIII= - 11=IIII=IIII=IIII=IIII= (E) CONTINUOUS CONIC FOOTING NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT CORROSION. DATE 06/03/2021 (E) CONIC STEM WALL T/STEM WALL = FIELD VERIFY T/FIN GRADE _ 11=IIII=IIII=IIII VARIES =IIII=IIII=IIII=III I- 11=_IIII=_IIII=_IIII= (E) FTG TO BE CUT FLUSH IIII=IIII=IIII=III I il-lill-rill=rill=l. WITH FACE OF STEM WALL IIII=IIII=IIII=11 = WITH A 12" MAX WIDTH FOR 11=IIII=IIII=IIII III 1i11-1i11-1i11 IIII= INSTALLATION POCKET _11=IIII=IIII= II=III =IIII=IIII=11 =IIII= 11=IIII=IIII IIII=IIII. =IIII IIII=IIII=1i. T/CONC FTG = FIELD VERIFY IIII=IIII=III 11=IIII=IIII= IIII—IIII—III 11=IIII=IIII- IIII=IIII=1� = 11=IIII=III' =IIII=IIII=IIII IIII=IIII " IDEAL HELICAL PILE & REPAIR BRACKET ASSEMBLY PER R&R FOUNDATION SPECIALIST TO CONFORM TO ESR-3750 L120 ENGINEERING & DESIGN 1 1/2 X 1 SLOT(TYP) 2 7/8" TRUFORCE BRKT BASE GALV. TOP 2 7/8 TRUFORCE BRKT BASE GALV. FRONT" TRUFORCE UNDERPINNING BRACKET FOR 2 7/8" PILE SHAFT 7'Y2 -- + 1 1/2 X 1 2 7/8" TRUFORCE BRKT T-BRKT GALV. SLOT (TYP) TOP -10 2 7/8" TRUFORCE BRKT T-BRKT GALV. FRONT NOTES: 1. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ASTM A572/A1018/A656, 50 KSI. 2. ALL WELDING TO BE PERFORMED BY SHOP QUALIFIED WELDOR TO AWS D1.I STRUCTURAL WELDING CODE - STEEL. 3. GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 4. ULTIMATE STRUCTURAL CAPACITY IS 60 KIPS. 5. (2) 7/8"-9 X 3' GALVANIZED THREADED ROD - ASTM A193 (GRADE B7). 6. (4) 7/8" GALVANIZED HEX NUT - ASTM A194. 7. (6) 7/8" GALVANIZED FLAT WASHERS - ASTM F436. (2) WASHERS MUST BE USED ON THE TOP OF EACH THREADED ROD (ABOVE THE 'T' BRACKET) TO OBTAIN THE FULL BRACKET CAPACITY. 8. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. PICTURE PARKWAY STER, NY 14580 789-4810 1 WWW.IDL-GRP.COM NOT TO SCALE ALL UNITS IN INCHES U.N.O. 3 401DEAL Group 278TFG THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION OF IDEAL MANUFACTURING, INC. IS PROHIBITED. SHEET 1 OF 1 A 1 1 2 W ULTEMA CAPACITY IIS740.7EXCEEKIPS IMUM TORQUE NOT AS ON A CAPACITY TO 2 7/8" O.D. X 0.203'' W.T. HELICAL LEADS & EXTENSIONS TORQUE RATIO OF kt = 9 FT-1 ICC-ES AC358 -REPORT #ESR-3750 [L] EXTENSION FLIGHTED EXTENSION FLIGHTED EXTENSION (EX: 278203EXT[L]G) SINGLE HELIX (SH) DOUBLE HELIX (DH) (EX: 278203FESH[L][Di]X[T]G) (EX: 278203FEDH[L][DID2]X[T]G) NOTES: 1. PILE SHAFT TO MEET OR EXCEED REQUIREMENTS OF ASTM A500, 80 KSI. 2. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ATSM A572, GRADE 50. 3. ALL HELICES ARE FORMED BY PRESS DIE. LEADING EDGE OF HELICES ARE TAPERED TO IMPROVE INSTALLATION CAPABILITIES. 4. HELIX SPACING IS THREE (3) TIMES THE DIAMETER OF THE LOWER HELIX. B SPACING OF LEADING HELIX ON FLIGHTED EXTENSIONS IS THREE (3) TIMES THE DIAMETER OF THE LAST HELIX ON THE PRECEDING SHAFT. 5. STANDARD HELIX DIAMETERS ARE 8", 10", 12", & 14". STANDARD HELIX THICKNESS IS 3/8". 6. ALL WELDING TO BE PERFORMED BY CERTIFIED WELDOR IN ACCORDANCE WITH AWS D1.1 STRUCTURAL WELDING CODE - STEEL. 7. HOT DIP GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 8. (2) 3/4" DIAMETER X 4 1/2" LONG GALVANIZED HEAVY HEX BOLT ASTM A325 AND (2) 3/4" GALVANIZED HEAVY HEX NUT ASTM A194 (GRADE 2H). 9. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 (IDEAL REPORT #ESR-3750) ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. pa I p3 I �I �D3 �D= �{ �D� I I I p3 —Li LING NUTS 5% (TYP) ?� 1 SINGLE HELIX (SH) DOUBLE HELIX (DH) TRIPLE HELIX (TH) QUAD HELIX (QH) LEAD LEAD LEAD LEAD (EX: 278203SH[L][Di]X[T]G) (EX: 278203DH[L][DiD2]X[T]G) (EX: 278203TH[L][D'D2D3]X[T]G) (EX: 278203QH[L][D3D2D3D4]X[T]G) 2%O.D.X� 2 4 IDEAL PART # ABREVIATIONS: 0.203 W.T. 278 = SHAFT DIAMETER = _ 3 PITCH TYPICAL PILE 203 = SHAFT WALL THICKNESS ASSEMBLY EXT = EXTENSION (NP) FE = FLIGHTED EXTENSION O15l6 SH, DH, TH, QH = SINGLE, DOUBLE, TRIPLE, OR QUAD. HELIX [L] = SHAFT LENGTH IN FEET BOLT HOLE HELIX FORMED BY (EXAMPLE: 7' = 7) DETAIL PRESS DIE [D] = HELIX DIAMETER(S) IN INCHES (EXAMPLE: 10" = 10) X = X (SEPARATES HELIX DIAMETER(S) AND HELIX THICKNESS) [T] = HELIX THICKNESS (EXAMPLE: 3/8" = 38) G = GALVANIZED PICTURE PARKWAY STER, NY 14580 789-48101 WWW.IDL-GRP.COM NOT TO SCALE ALL UNITS IN INCHES U.N.O. 3 401DEAL Group 278203 SINGLE HELIX EXTENSION TRIPLE HELIX LEAD TIP CUT AT 45° THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION OF IDEAL MANUFACTURING, INC. IS PROHIBITED. SHEET 1 OF 1 B N O M N W LONGITUDE ONE TWENTY° ENGINEERING & DESIGN LOAD ANALYSIS: IBC 2018 - 2-STORY BUILDING Max Wall Spacing = 7'-0" Max *Typical @ Perimeter Roof LL (snow ground): 25 psf Floor LL: 40 psf Deck LL: 60 psf Floor/Roof DL: 15 psf Wall DL: 12 psf Stemwall DL: 100 psf * 8" stemwall Helical Pile: #1-6: 7'-0" o.c. Roof Trib: 0.5*24' span =12' Floor Trib: 0.5*20' span * 1 story = 10' Typical Flr Ht: 10' *2 story = 20' Concrete Ht = 2'-6" *conserv. assumed for load calculations Helical Pile: #10-11&17.18: 7'-0" o.c. Roof Trib: 0.5*24' span =12' Floor Trib: 0.5*12' span + 0.5*20' span = 16' Typical Flr Ht: 10' *2 story = 20' Concrete Ht = 2'-6" *conserv. assumed for load calculations Helical Pile: #12-16: 7'-0" o.c. Roof Trib: 0.5*28' span =14' Floor Trib: 0.5*20' span * 1 story = 10' Deck Trib: 0.5*12' span = 6' Typical Flr Ht: 10' *1 story = 10' Concrete Ht = 2'-6" *conserv. assumed for load calculations Helical Pile: #7-9: 10'-0" o.c. Roof Trib: 2' Floor Trib: 0.5*20' span * 1 story = 10' Typical Flr Ht: 10' *2 story = 20' Concrete Ht = 2'-6" *conserv. assumed for load calculations Notes: 1. Both uniform and point loads analyzed in the following concrete beam analysis. Uniform loads are assumed to be standard due to load distribution from bearing walls, however, the additional point load is conservatively considered here for any major beam supports from above. 2. Maximum loading was determined by inspection of the building geometry and through conservative assumptions regarding span lengths and support wall/foundation. All concrete walls assumed full tributary span of floor and roof members. PROJECT NO. SHEET NO. S210419-2XR PROJECT 10623 229TH PL SW, EDMONDS, WA 98020 SUBJECT Foundation Stabilization/Jacki BY FY Seam Span = 7.00 ft DATE 06/03/2021 Helical Pile: #1-6: T-0" o.c. Max Story # Trib DL LL RL SL EQ Roof 1 12.0 ft 180 pif 0 plf 240 pif 300 pif 0 plf Floor 1 10.0 ft 150 pif 400 pif 0 plf 0 plf 0 plf Wd Wall Ht 2 10.0 ft 240 pif 0 plf 0 plf 0 plf -onc Wall Ht 1 2.5 ft 250 pif 0 plf 0 plf 0 plf 0 plf Total 820 pif 400 pif 240 pif 300 pif 0 plf Total xSpan w/SW 5.7k 2.8k 1.7k 2.1k 0.0k Total x Span w/o SW 4.0 k 2.8 k 1.7 k 2.1 k 0.0 k Unfactored Uniform Load 1,S20 pif 1,270 plf Unfactored Point Load 10.6 It 8.9 k w/ Sw w/o Sw Helical Pile: #10-11&17-18: T-0" o.c. Max Beam Span = 7.00 ft Story # Trib DL LL RL SL EQ Roof 1 12.0 ft 180 plf 0 pif 240 pif 300 pif 0 pif Floor 1 16.0 ft 240 plf 640 pif 0 plf 0 PH 0 pif Wd Wall Ht 2 10.0 ft 240 plf 0 pif 0 plf 0 pif Conc Wall Ht 1 2.5 ft 250 pif 0 pif 0 pif 0 PH 0 pif Total 910 pif 640 PH 240 pif 300 pif 0 plf TotalxSpan w/SW 6.4k 4.5k 1.7k 2.1k 0.0k Total x Span w/o SW 4.6k 4.5k 1.7k 2.1k 0.0k Unfactored Uniform Load 1,950 pif 1,600 pif Unfactored Point Load 13.0 k 11.2 It w/ Sw w/o Sw Helical Pile: #12-16: T-0" o.c. Max Beam Span = 7.00 ft Story a Trib DL LL RL St. EQ Roof 1 24.0 ft 210 pif 0 plf 280 pif 350 pif 0 plf Floor 1 10.0 ft 150 pif 400 pif 0 plf 0 plf 0 plf Deck 1 6.0 ft 90 plf 360 pif 0 plf 150 plf 0 plf Wd Wall Ht 1 10.0 ft 120 pif 0 plf 0 plf 0 plf Conc Wall Ht 1 2.5 ft 250 pif 0 plf 0 plf 0 plf 0 plf Total 820 pif 760 pif 280 pif S00 pif 0 plf Total xSpan w/SW 5.7k 5.3k 2.0k 3.5k 0.0k Total x Span w/o SW 4.0 k 5.3 k 2.0 k 3.5 k 0.0 k Unfactored Uniform Load 2,080 pif 1,830 pif Unfactored Point Load 14.6 It 12.8 It w/ Sw w/o Sw Helical Pile: #7-9: 10'-0" o.c. Max Beam Span = Story 10.00 ft # Trib DL LL RL SL EQ Roof 1 2.0 ft 30 pif 0 plf 40 plf 50 plf 0 plf Floor 1 10.0 ft 150 pif 400 pif 0 pif 0 plf 0 plf Wd Wall Ht 1 10.0 ft 120 pif 0 pif 0 plf 0 plf Conc Wall Ht 1 2.5 ft 250 pif 0 plf 0 plf 0 plf 0 plf Total 550 pif 400 pif 40 pif 50 plf 0 plf Total xSpan w/SW 5.5k 4.0k 0.4k 0.5k 0.0k Total xspan w/o SW 3.0k 4.0k 0.4k 0.5k 0.0k Unfactored Uniform Load 1,000 pif 750 pif Unfactored Point Load 10.0 It 7.S It w/ SW w/o SW L120 ENGINEERING & DESIGN PROJECT NO. SHEET NO. S210419-2XR PROJECT 10623 229TH PL SW, EDMONDS, WA 98020 LONGITUDE SUBJECT Foundation Stabilization/Jacki ONE TWENTYO ENGINEERING & DESIGN FY DATE 06/03/2021 Maximum loading on grade beam determined based on building geometry, and through conservative assumptions regarding span lengths and support walls/foundation. Basically, all concrete walls assumed full tributary span of floor members and roof members. Conclusion: Based on the loading and geometry of the structure we conclude that the foundation may be stabilized through the use of piles and connections per R&R. These are to be attached to the stem -wall (grade -beam) at an on -center (o.c.) spacing no greater than T-0" o.c. L120 ENGINEERING & DESIGN 15 of 23 Project Number: Plan Name: Sheet Number: S210419-2XR 10623 229TH PL SW, EDMONDS, WA 98020 Engineer: Subject: Date: FY 2ft Unreinforced Conc Beam (T-0" o.c.) 6/3/2021 DEMAND CALCULATION numberofstories # 2stories span L 7.0 ft concrete area A 216 in2 concrete self weight SW 225 plf Pt DL DL 4.00 k = 7.0 ft * 946 Pt LL LL 5.30 k = 7.0 ft * 980 Pt LLr LLr 3.50 k = 7.0 ft * 100 momentfrom DL MDL 8,378 lb-ft 100.5 k-in momentfrom LL MLL 9,275 lb-ft 111.3 k-in momentfromSL MLL, 6,125lb-ft 73.5k-in factored moment MLRFD 140.8 k-in 1.4DL MLRFD 335.5k-in 1.2DL + 1.6LL + 0.5SL MLRFD 349.5 k-in 1.2DL+ 1.6SL+ LL controlling factored moment M„ 349.5 k-in factored shear VLRFD 3.9 k 1.4DL VLRFD 8.5k 1.2DL + 1.6LL + 0.5SL VLRFD 8.8 k 1.2DL+ 1.6SL+ LL controlling factored shear V„ 8.8 k controlling factored bearing B„ 8.8 k STRENGTH CALCULATION concrete strength PC 2.5ksi assumed light wt concrete mod. factor X 1 normal weight concrete flexure strength red. factor 1pfi . 0.9 tension -controlled shear strength red. factor khe 0.75 bearing strength red. factor Obeam, 0.65 moment of ineritia 1„ 11,016 in4 elastic section modulus Sm 1,001 in3 tens fiber to NA C 11.0 in nom flexure strength (T controls) Mn 250.4 k-in Mn = 5AJ cSm nom flexure strength(C controls) Mn 2,128.1 k-in M. =0.85f'S RESIDENTIAL CONCRETE M„ 375.5 k-in Mn = 7.55.i.VfTcSrn CONTROLS flexure strength OW 338.0 k-in < Mu FAILED nom shear strength V„ 14.4 k i7 4 * A n =3 V/ c shear strength 41V� 10.8 k > Vu OK loaded bearing area A, 74 in2 supporting surface bearing area AZ 74 in2 nom bearing strength B„ 156.6 k 0.85f'Al bearing strength 41B* 101.8 k > Bu OK Additional Verification Calc: max concrete tensile strength f, 375 psi f =7.Sd max beam tensile stress Fr 349 psi Ft = (M * c)/ Ixx fr > Ft OK [max on -center pile spacing] *see attached [Includes total height w/o ACI14 §14.5.1.7 redux] [2-story loading] [2-story loading] [2-story loading] [R=V for SS beam] ACI14 [Table 21.2.1] ACI14 [Table 21.2.1] ACI14 [Table 21.2.1] *see attached *see attached *see attached ACI 318-14 [Eq. 14.5.2.1a] ACI 318-14 [Eq. 14.5.2.1b] ACI 332-14 [Eq. 8.2.1.11 Acceptable by Inspection D/C= 103.42% ACI14 [Table 14.5.5.1(a)] D/C= 81.44% [IDEAL 2-7/8" Tru-Force Underpinning Bracket] [If the supporting surface is > than loaded area] ACI14 [Table 14.5.6.1(c)] D/C= 8.64% ACI 14 [Eq. 19.2.3.1] 16 of 23 Project Number: Plan Name: Sheet Number: 5210419-2XR 10623 229TH PL SW, EDMONDS, WA 98020 Engineer: Subject: Date: FY 2ft Unreinforced Conc Beam (T-0" ox.) 6/3/2021 Final Section Properties Total Area 216.0 in^2 Ixx 11.016.0 in^4 Sxx : - Y 1,001.45 in^3 lyy 1,631.93 in^4 Sxx : +Y 847.38 in^3 Calculated final C.G. distance from Datum : X cg Dist. 0.0 in Zxx 1,349.99 in^3 Syy : - X 271.988 in^3 Syy : +X 271.988 in^3 Y cg Dist. 0.0 in Zyy 504.0 in^3 Edge Distances from CG.: r xx 7.141 in +X 6.0 in +Y 13.0 in r yy 2.749 in -X -6.0 in -Y In Rotation of All Components @ , 0.00 deg CCW Per AC114 §14.5.1.7 General - I : #1 Xcg = 0.000 in Ycg = 0.000 in Rotation = 0 deg CCW Top Flange Width = S.00Oin Top Flange Thick = 8.000in Web Thickness = 8.00Oin Bottom Flange Wid 12.000in Bottom Flange This 6.00Oin Top Height = 24.00Oin 17 of 23 Project Number: Plan Name: Sheet Number: S210419-2XR 10623 229TH PL SW, EDMONDS, WA 98020 Engineer: Subject: Date: FY 2ft Unreinforced Conc Beam (10'-0" o.c.) 6/3/2021 DEMAND CALCULATION numberofstories # Istories span L 10.0 ft concrete area A 216 in2 concrete self weight SW 225 plf Pt DL DL 3.00 k = 10.0 ft * 946 Pt LL LL 4.00k = 10.0 ft * 980 Pt LLr LLr 0.50 k = 10.0 ft * 100 momentfrom DL MDL 10,313 lb-ft 123.8 Wn momentfrom LL MLL 10,000lb-ft 120.0 Wn momentfromSL MLL, 1,250lb-ft 15.0k-in factored moment MLRFD 173.3 k-in 1ADL MLRFD 348.0k-in 1.2DL + 1.6LL + 0.5SL MLRFD 292.5 k-in 1.2DL+ 1.6SL+ LL controlling factored moment M„ 348.0 k-in factored shear VLRFD 3.7 k 1ADL VLRFD 6.5k 1.2DL + 1.6LL + 0.5SL VLRFD 5.6 k 1.2DL+ 1.6SL+ LL controlling factored shear V„ 6.5 k controlling factored bearing B„ 6.5 k STRENGTH CALCULATION concrete strength PC 2.5ksi assumed light wt concrete mod. factor X 1 normal weight concrete flexure strength red. factor 1pfi . 0.9 tension -controlled shear strength red. factor khe 0.75 bearing strength red. factor Obeam, 0.65 moment of ineritia 1„ 11,016 in4 elastic section modulus Sm 1,001 in3 tens fiber to NA C 11.0 in nom flexure strength (T controls) Mn 250.4 k-in Mn = 5AJ cSm nom flexure strength(C controls) Mn 2,128.1 k-in M. =O.R5f'S RESIDENTIAL CONCRETE M„ 375.5 k-in Mn = 7.55.i.VfTcSrn CONTROLS flexure strength OW 338.0 k-in < Mu FAILED nom shear strength V„ 14.4 k i7 4 * A n =3 V/ c shear strength 41V� 10.8 k > Vu OK loaded bearing area A, 74 in2 supporting surface bearing area AZ 74 in2 nom bearing strength B„ 156.6 k 0.85f'Al bearing strength 41B„ 101.8 k > Bu OK Additional Verification Calc: max concrete tensile strength f, 375 psi %r = 7.SA max beam tensile stress Fr 347 psi Ft = (M * c)/ Ixx fr > Ft OK [max on -center pile spacing] *see attached [Includes total height w/o ACI14 §14.5.1.7 redux] [1-story loading] [1-story loading] [1-story loading] [R=V for SS beam] ACI14 [Table 21.2.1] ACI14 [Table 21.2.1] ACI14 [Table 21.2.1] *see attached *see attached *see attached ACI 318-14 [Eq. 14.5.2.1a] ACI 318-14 [Eq. 14.5.2.1b] ACI 332-14 [Eq. 8.2.1.11 Acceptable by Inspection D/C= 102.96% ACI14 [Table 14.5.5.1(a)] D/C= 59.95% [IDEAL 2-7/8" Tru-Force Underpinning Bracket] [If the supporting surface is > than loaded area] ACI14 [Table 14.5.6.1(c)] D/C= 6.36% ACI 14 [Eq. 19.2.3.1] 18 of 23 Project Number: Plan Name: Sheet Number: 5210419-2XR 10623 229TH PL SW, EDMONDS, WA 98020 Engineer: Subject: Date: FY 2ft Unreinforced Conc Beam (10'-0" ox.) 6/3/2021 Final Section Properties Total Area 216.0 in^2 Ixx 11.016.0 in^4 Sxx : - Y 1,001.45 in^3 lyy 1,631.93 in^4 Sxx : +Y 847.38 in^3 Calculated final C.G. distance from Datum : X cg Dist. 0.0 in Zxx 1,349.99 in^3 Syy : - X 271.988 in^3 Syy : +X 271.988 in^3 Y cg Dist. 0.0 in Zyy 504.0 in^3 Edge Distances from CG.: r xx 7.141 in +X 6.0 in +Y 13.0 in r yy 2.749 in -X -6.0 in -Y In Rotation of All Components @ , 0.00 deg CCW Per AC114 §14.5.1.7 General - I : 1f1 Xcg = 0.000 in Ycg = 0.000 in Rotation = 0 deg CCW Top Flange Width = S.00Oin Top Flange Thick = 8.000in Web Thickness = 8.00Oin Bottom Flange Wid 12.000in Bottom Flange This 6.00Oin Top Height = 24.00Oin Appendix Parcel Details & Photographs 20 of 23 Snohomish Online Government Information & Services County Washington Home Other Property Data Help > Search Results > Property Summary Property Account Summary 5/31/2021 Parcel Number 100610500000300 lProperty Address 10623 229TH PL SW, EDMONDS, WA 98020-6151 I General Information )erty Description WESTGATE MANOR BLK 000 D-00 -LOT 3 )erty Category Land and Improvements as Active, Locally Assessed Code Area 00216 Property Characteristics Use Code 111 Single Family Residence -Detached Unit of Measure Acre(s) Related Properties No Related Properties Found Parties Role Percent Name Address Taxpayer 100 MAXIN JEFFREY/GARCIA NAYELI 2845 EASTLAKE AVE E, C, SEATTLE, WA TORRES 98102 Owner 100 MAXIN JEFFREY/GARCIA NAYELI 2845 EASTLAKE AVE E, C, SEATTLE, WA TORRES 98102 Owner 100 PETERSON ERIC A & PEGGY 10623 229TH PL SW, EDMONDS, WA 98020 United States Property Values Value Type Tax Year 2021 Tax Year 2020 Tax Year 2019 Tax Year 2018 Tax Year 2017 Taxable Value Regular $653,900 $628,000 $575,600 $522,700 $462,100 Exemption Amount Regular Market Total $653,900 $628,000 $575,600 $522,700 $462,100 Assessed Value $653,900 $628,000 $575,600 $522,700 $462,100 Market Land $415,000 $404,000 $355,000 $325,000 $280,000 Market Improvement $238,900 $224,000 $220,600 $197,700 $182,100 Personal Property Active Exemptions No Exemptions Found Events Effective Date Entry Date -Time Type Remarks 04/12/2021 04/12/2021 13:45:51 Excise Processed Temporary Excise: T136986 Finalized to: E160168 04/05/2021 04/12/2021 13:45:00 Excise Processed Property Transfer Filing No.: T136986, submitted by eREET 04/05/2021 by ASCEREET ax Balance 21 of 23 Pay Online Visit our payment site to make an online payment. F I PAY NOW Pay By Mail Make Check/Money Order to: Snohomish County Treasurer Send to: Snohomish County Treasurer 3000 Rockefeller Ave M/S 501 Everett, WA 98201 Installments Payable Tax Year linstaliment IDue Date I Principall Interest, Penalties and Costsl Total Duel 2021 12 10/31/2021 1 $2,706.331 $0.001 $2,706.331 View Detailed Statement Detailed information about taxes and all other charges displayed above. Calculate Future Payoff Taxes, interest and penalty due on a specific future date. Cumulative Due $2,706.33 Distribution of Current Taxes District Rate 0.20 Amount $128.88 Voted Amount $0.00 Non -Voted Amount $128.88 CENTRAL PUGET SOUND REGIONAL TRANSIT AUT CITY OF EDMONDS 1.26 $826.33 $233.75 $592.58 EDMONDS SCHOOL DISTRICT NO 15 2.80 $1,830.15 $1,830.15 $0.00 PORT OF EDMONDS 0.06 $37.86 $0.00 $37.86 PUB HOSP #2 0.061 $40.39 $0.00 $40.39 SNO-ISLE INTERCOUNTY RURAL LIBRARY 0.42 $277.53 $0.00 $277.53 SNOHOMISH COUNTY-CNT 0.64 $416.00 $0.00 $416.00 STATE 2.83 $1,847.49 $0.00 $1,847.49 SNOHOMISH CONSERVATION DISTRICT $8.02 $0.001 $8.02 TOTAL 8.27 $5,412.651 $2,063.901 $3,348.75 Levy Rate History Tax Year Total Levy Rate 2020 9.337975 2019 9.270960 2018 10.730353 Real Property Structures Description IType IYear Built iMore Information Tri-Level IDwelling 11967 View Detailed Structure Information Receipts Date Receipt No. Amount Tendered Amount Due 04/16/2021 13:32:00 11513982 $2,706.32 $5,412.65 09/17/2020 00:00:00 11173323 $2,936.13 $2,936.13 04/24/2020 00:00:00 11065801 $2,936.13 $5,872.26 10/29/2019 00:00:00 10802329 $2,671.69 $2,671.69 04/29/2019 00:00:00 10537873 $2,671.69 $5,343.38 11/07/2018 00:00:00 10284129 $2,807.39 $2,807.39 04/30/2018 00:00:00 9976498 $2,807.38 $5,614.77 10/30/2017 00:00:00 9683828 $2,372.03 $2,372.03 05/01/2017 00:00:00 9418669 $2,372.03 $4,744.06 11/01/2016 00:00:00 9135048 $2,190.72 $2,190.72 04/29/2016 00:00:00 18852192 $2,190.72 $4,381.44 Sales History Sale Entry Recording Recording Sale Excise Deed Transfer r Other Date Date Date Number Amount Number Type Type Grantor(Seller) Grantee(Buyer) Parcels No Sales History Found Property Maps Neighborhood Code ITownship IRange Section IQuarter IParcel Map 22 of 23 22 22 Za— Wd Dk 320 s.f. 16 42 10— FWd Dk 120 s.f. 1 sFr C 1698 s.f. 9� 2 10 28 27 14 22 Existing building plan provided by King County records for Parcel #: 00610500000300 for address: 10623 229TH PL SW, EDMONDS, WA 98020. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -1-120 23 of 23 Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -L120