Loading...
APPROVED BLD-BLD2021-0351+Structural_Analysis_or_Calculations+3.9.2021_9.18.34_AM+20824161 of 28 LONGITUDE ONE TWENTY° ENGINEERING & DESIGN calculation Package for Foundation Stabilization/Lift STRUCTURAL ENGINEER L120 ENGINEERING & DESIGN 1315091"PLNE KIRKLAND, WA 98034-5901 709 71h Ave S Edmonds, WA 98020 Project no: S201208-2XR January I8t ; 2021 Prepared for: R&R Foundation Specialist 3409 McDougall Ave, suite 204 Everett, WA 98201 P: 425.760.5077 CONTACT: MANS THURFJELL, PE EMAIL: MTHURFJELL@L120ENGINEERING.COM PHONE: (425) 636-3313 FL12(425) 636-3313 FM 00Engineering.com 11' $fq c�mn g ne 1 S �9 R R&R LEVEL SURVEY See Structural Calculation Package for Additional Requirements PARCEL NO. 00464500503601 LEGAL DESCRIPTION KELL000 PLAT OF EDMONDS BLK 005 D-02 THE NIQ LOTS 36-3138- 39 & 40 EXC E 10FT LOT 36 THOF OWNER NAME & ADDRESS VENABLE ROBERT A & NANCY 109 ]TH AVE S EDMONDS, WA M020 TIEACK SPADING & LOAD REQUIREMENTSTABIF E NG&LOAD REQUIREMTABLE PGN TEBAIX• TEACKIYPE MAX O.G SPACING,k MIN TENLON UPAOTY,Nq PROOFTESTING LOAD,Mq lOGl10N ILE PILE TYPE TY,kipn AD, kips B1WN%IFS ENOOFFSET ALLOWABLE LOADING 200%MIN TENSXIN GPAUTY 'MIN ULTIMATE UPAORY) (MIN ULTIMATE CAPACITY) 200M MIN VERTICALOCAPACIT'j—E—RIOR TYP HELICAL 8'-0' PER PLAN 5.0 k/PILE 10.0 k/PILE TYP EXTERIOR 3/1 HELICAL/CONCENTRIC 6'-0" PER PI -AN 22.0 k/PILE 44.0 k/PILE NOTES: 1-2 HELICAL N/A N/A 26.0 k/PILE 52.0 k/PILE 2.0 k/PILE 4.0 k/PILE �AO2HXMMIAAOOQV AEDAEDONCATNTPAHAADITIONLFCTOFTFTENSTTNTREU B SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE TIEBACK ASSEMBLY. a. MINIMUM AND MAXIMUM INSTALLATION TORQUE FOR HELICAL ASSEMBLIES SHALL BE SPECIFIED BY THE PILE MANUFACTURER. THEM NIMUM INSTALLATION TORQUE SHALL BE HIGH ENOUGH TO ACHIEVE THE REQUIRED BEARING CAPACITY LOADING, INCLUDING A SAFETY FACTOR NO LESS THAN 2. THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF THE PILE SHAFTS OR ANY PART OF THE PILE ASSEMBLY. MAXIMUM INSTALLATION TORQUE RATING OF 8,300FT'LBS FOR A 2-7I8 INCH DIAMETER HELICAL PILE WITH 0.203 INCH SHAFT WALL THICKNESS PER ESRJ750. b. FOR HELICAL PILES, PER IDEAL GROUP DWG NO.:2]8TFG, THE ALLOWABLE STRUCTURAL CAPACITY FOR THE 2718" TRU-FORCE UNDERPINNING BRACKET IS LIMITED TO 30 KIPS. c. HELICAL ASSEMBLIES AS MANUFACTURED BY IDEAL MANUFACTURING, INC., IN ACCORDANCE WITH ESR-3750. d. PILE ORANCHOR LOADS NOT TO EXCEED MAXIMUM CAPACITY AS DETERMINED BYTHE MANUFACTURER FOR ANY PART OF THEASSEMBLY. e. MAXIMUM ON -CENTER SPACING LISTED FOR TYPICAL PILE INSTALLATION UNLESS NOTED OTHERWISE ON PLAN. I SITE NOTES 1. VERIFY ALL DIMENSIONS ON SITE. 1 _ 2. FOUNDATION DIMENSIONS ARE TO OUTSIDE FACE OF CONCRETE STEM WALL PER R&R LEVEL SURVEY. 710 SPRUCE BT 3. REFERTOSTRUCTURALCALCULATIONS PACKAGE DATED JANUARY I8TH, EDMONDS, WA 98020 2021, FOR ADDITIONAL INFORMATION, SPECIFICATIONS, AND REQUIREMENTS. LEVEL SURVEY PER RAR REPAIR PLAN DATED DECEMBER]TH, 2020. REFER TO STRUCTURAL CALCULATIONS PACKAGE FOR MODIFICATIONS AND ` ADDITION AL REQUIREMENTS FOR REPAIR PLAN. 5. PARCEL DIMENSIONS PROVIDED BY SNOHOMISH COUNTY. NOT TO SCALE. PROPERTY LINE AND RESIDENCE LOCATING DIMENSIONS (WITH ASTERISK,') APPROXIMATED PER SNOHOMISH COUNTY GIS MAPPING TOOLS. NOT TO BE USED FOR LEGAL PURPOSES. 11. SITE FEATURES AND EXISTING STRUCTURES ON ADJACENT PARCELS NOT • SHOWN FOR CLARITY. _3 PRIMARY <p ACCESS = RESIDENCE ]09 ]TH AVE S EDMONDS, WA 98020 ' N Qf __- --- ---------- ------- ---------------- _ 138'6"" __ ___ _ _ •� PROPERTYLINE AREA OF WORK I • r EDMONDS. WA 98020 NOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS. 7f. I I I 111 HEMLOCK ST EDMONDS, WA 98020 1 IMI ■ EXISTING RESIDENCE STRUCTURE EXISTING ADJACENT STRUCTURE _ AREA OF PROPOSED WORK ' PROPERTY LINE ---- APPROXIMATE DIMENSION �A} SITE PLAN PROJECT LONGITUDE SUBJECT ONE TWENTYO ENGINEERING & DESIGN BY ZT PROJECT NO. SHEET NO. 1 1: 709 7th Ave S, Edmonds, WA 98020 Foundation Stabilization/Jackin DATE 1/18/2021 Scope/Objective: To determine the required pile spacing and geometry to stabilize and lift (where required) the existing structural foundation. These findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the existing structure above (based on as -built assessments). The R&R Foundation Specialists' (R&R) proposed pile layout can be found in the following pages with structural recommendations based upon the findings of L120 Engineering & Design. Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the structural scope presented here. It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl -space support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support posts, adjustable post -base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas shall be monitored and further adjustments shall be made if necessary. Structural Summary: - The foundation of the residence consists of continuous cast -in -place concrete stem wall and concrete strip footings. Below the footings, piles are to be spaced at a distance no larger than 6-0" o.c. as indicated on the attached Level Survey. - End piles shall not exceed the maximum corner offset as specified on the attached Level Survey. - A maximum allowable loading of 3,549 plf was utilized in this analysis. This was determined through inspection of building geometry and conservative span/tributary loading assumptions based on standard construction practices - The foundation wall also retains approximately 4'-0" of soil. It is restrained at the base by concrete stairs and the structure above at the top. A single tieback will be installed at the corner of the wall where it has leaned out. - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment assemblies with capacities equal to or greater than the indicated load values. Allowable Load Capacity Requirement Helical Pile #3 & Concentric #1 @ 6-0" o.c. ........... 22.0 kip minimum vertical capacity (allowable load) Helical Pile #142 @ Door ........... 26.0 kip minimum vertical capacity (allowable load) Concentric Pile #248 @ 6'-0" o.c. ........... 12.0 kip minimum vertical capacity (allowable load) Helical Tieback Anchors @ 8'-0" o.c. ........... 5.0 kip minimum tensile capacity (allowable load) Note: Refer to the attached General Notes for additional requirements. - As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or expected additional structural analysis will be required. - Structural recommendations contained in this package are based on site photographs dated December 7th, 2020, provided by R&R. To the knowledge of L120, a geotechnical investigation was not performed on this site. Consequently, all structural recommendations assume adequate soil conditions to obtain the required pile capacities. Please inform L120 of site -specific conditions that were unconsidered by, may conflict with, or otherwise compromise the recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage, or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need to be revisited to consider and address the new findings. Refer to the following pages for pile and connection specifications. L120 ENGINEERING & DESIGN Elmo W3 GENERAL NOTES HELICAL PILES & TIEBACKS 1. HELICAL PILES & TIEBACKS SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC). 2. HELICAL PILES & TIEBACKS SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC., AND SHALL BE IN ACCORDANCE WITH ESR-3750. 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. 4. CORROSION PROTECTION OF ALL COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 7. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. 9. MONITOR AND RECORD DEPTH OF PENETRATION. PROVIDE TORQUE MONITORING DEVICE AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS. 10. HELICAL PILES & TIEBACKS SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. 11. ALL BRACKETS AND HELICAL PILE & TIEBACK ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. 13. ALL HELICAL PILE & TIEBACK ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. 14. THE PILE & TIEBACK QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2O15 AND 2012 IBC SECTION 1705.9 MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES & TIEBACKS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: A. PRODUCT MANUFACTURER B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS, EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT USED, AND THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS E. ANTICIPATED AND ACTUAL PILING DEPTH F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. 16. PILES & TIEBACKS IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. HELICAL PILE & TIEBACKS PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2015 SEATTLE BUILDING CODE (SBC). THE MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. 3.9W GENERAL NOTES CONCENTRIC/DRIVEN PILES 1. "CONCENTRIC" OR DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC). 2. IT IS RECOGNIZED THAT THE SEATTLE BUILDING CODE (SBC) REQUIRES 8 INCH MINIMUM DIAMETER PIPE FOR PIPE PILE INSTALLATION. THE APPROPRIATE ANALYSIS/EVALUATION AND TESTING REQUIREMENTS IN ACCORDANCE WITH SEATTLE DEPARTMENT OF CONSTRUCTION & INSPECTIONS (SDCI) DIRECTOR'S RULE 10-2009 ARE PROVIDED TO ALLOW FOR USE OF PILES LESS THAN 8 INCHES IN DIAMETER AS REQUIRED BY SECTION 104.5 OF THE SBC. 3. DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED BY STABIL-LOC SYSTEMS, LLC, AND SHALL BE IN ACCORDANCE WITH ESR-4121. 4. ALL MATERIAL PROPERTIES OF DRIVEN PILE COMPONENTS SHALL COMPLY WITH ESR-4121. 5. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 6. ALL PILE COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 7. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 8. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 9. DRIVEN PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF 1 DEGREE FROM VERTICAL PER SECTION 5.7 OF ESR-4121. 10. DRIVEN PILES SHALL BE INSTALLED TO THE MINIMUM FORCE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION FORCE SHALL NOT EXCEED THE ALLOWABLE CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE ASSEMBLY. 11. ALL BRACKETS AND PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION. 13. SPECIAL INSPECTION IN ACCORDANCE WITH IBC SECTION 1705.7 IS REQUIRED FOR INSTALLATION OF THE STABIL- LOC FOUNDATION PIERING SYSTEM. A GEOTECHNICAL SPECIAL INSPECTOR MUST VERIFY AND RECORD THE FOLLOWING: A. VERIFICATION OF MANUFACTURER PRODUCT MODEL NUMBERS B. TYPES, CONFIGURATIONS, AND IDENTIFICATIONS OF HYDRAULICALLY DRIVEN STEEL PIER SEGMENT AND ADJUSTABLE HEAD ASSEMBLY AS SPECIFIED IN ESR-4121 AND THE CONSTRUCTION DOCUMENTS. C. INSTALLATION PROCEDURES, ANTICIPATED AND ACTUAL PILING DEPTH D. TIP ELEVATIONS, THE INSTALLATION PRESSURE AND FINAL DEPTH OF THE DRIVEN FOUNDATION SYSTEM E. INCLINATION AND POSITION/LOCATION OF HYDRAULICALLY DRIVEN PIER SEGMENTS F. COMPLIANCE OF THE INSTALLATION WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THIS EVALUATION REPORT. 14. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. DRIVEN PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2015 SEATTLE BUILDING CODE (SBC). THE MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. Ys W-1 GENERAL NOTES STRUCTURAL STEEL 1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". 2. MATERIALS: BOLTS - ASTM A307, UNLESS OTHERWISE NOTED ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI) 3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 114" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. WHERE ON -SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN ACCORDANCE WITH 2O15 AND 2012 IBC SECTION 1705.2 IS ALSO REQUIRED. CONCRETE 1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC. 2. MINIMUM CONCRETE STRENGTH (28 DAYS): FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX BASEMENT FOUNDATION RETAINING WALLS .......................3,000 PSI - 5 SACK MIX SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX SLAB -ON -GRADE... EXPOSED WEATHERING SURFACES ...... 3,000 PSI AIR -ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE 3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE SURFACE WATER. 4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS. 5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP. GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING APPROVED ADMIXTURES. 6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM. 7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER. 8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR COLD WEATHER. 9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL. 10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG -TIE, HILTI, OR EQUIVALENT. SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER. PROJECT LONGITUDE SUBJECT ONE TWENTY° ENGINEERING & DESIGN BY ZT PROJECT NO. SHEET NO. 1 1: 709 7th Ave S, Edmonds, WA 98020 Foundation Stabilization/Jacking DATE 1 /18/2021 Ideal Foundation Systems 2-7/8"0 Helical Pile (0.203-inch wall thickness) -Soil Capacity • y�� per ESR-3750 DIGGA lOK Drive Head Pressure (psi) Torque, T (ft •IbsJ Torque Correlation factor, Kt [Compression] (ft t) Ultimate Axial Compressive Capacity, P„ = It,'T (kips) Allowable Axial Compressive Copoc/ty, P. =0.5'P„ (kips) 500 1,740 9 15.7 7.8 600 2,088 9 18.8 9.4 700 2,436 9 21.9 11.0 800 2,784 9 25.1 12.5 900 3,132 9 28.2 14.1 1000 3,480 9 31.3 15.7 1100 3,828 9 34.5 17.2 1200 4,176 9 37.6 18.8 1300 4,524 9 40.7 20.4 1400 4,872 9 43.8 21.9 1500 5,220 9 47.0 23.5 1600 5,568 9 50.1 25.1 1700 5,916 9 53.2 26.6 1800 6,264 9 56.4 28.2 1900 6,612 9 59.5 29.8 L120 ENGINEERING &DESIGN PROJECT LONGITUDE SUBJECT ONE TWENTY° ENGINEERING & DESIGN BY ZT PROJECT NO. SHEET NO. 1 1: 709 7th Ave S, Edmonds, WA 98020 Foundation Stabilization/Jacking DATE 1 /18/2021 Ideal Foundation Systems 2-7/8"0 Helical Pile (0.203-inch wall thickness) -Soil Capacity per ESR-3750 DIGGA 6K Drive Head MAX i.) DIGGA 6K Drive Head differential pressure display to torque output has been pulled from the attached conversion charts provided by DIGGA. ii.) Per Table 5A of ESR-3750, the maximum installation torque rating of a 2-7/8"0 helical pile (0.203-inch wall thickness) is 8,300 ft'Ibs. Per Ideal Manufacturing, Inc., the maximum installation torque rating of a 2-7/8"0 helical pile (0.203-inch wall thickness) is 8.000 ft'Ibs. Final installation torque shall not exceed the lesser of these limiting values. iii.) Piles shall reach a torque that correlates with an allowable capacity that meets or exceeds the maximum allowable load demand as listed in the structural package, but shall not exceed the maximum allowable capacity for any part of the pile assembly. iv.) Refer to ESR-3750 and Ideal Manufacturing, Inc. documents for additional information and requirements. v.) Definitions per ESR-3750: T = Final Installation torque in ft'Ibs, the last torque reading taken during pile installation, using, for example, the torque reading instruments connected to the installation equipment. Kt = Torque correlation factor per ESR-3750 Pu = Ultimate axial compressive capacity (in kips) of helical pile P. = Allowable axial compressive capacity (in kips) of helical pile vi.) For torque readings between those listed, use the following equation to determine the allowable capacity: P. = (T'Kt)/2 vii.) 1 kip = 1,000 Ibs Pressure (psi) Torque, T �• � !bs Torque Correlation Factor, Kt Compression, (ft Ultimate Axial Compressive Capacity P. Kt'T, (kips) Allowable Axial Compressive Capacity P. 0.5'P,,, (kips) 500 1,554 9 14.0 7.0 600 1,865 9 16.8 8.4 700 2,176 9 19.6 9.8 800 2,486 9 22.4 11.2 900 2,797 9 25.2 12.6 1000 3,108 9 28.0 14.0 1100 3,419 9 30.8 15.4 1200 3,730 9 33.6 16.8 1300 4,040 4,351 9 9 36.4 39.2 18-2 1400 19.6 1500 4,662 9 42.0 21.0 1600 4,973 9 44.8 22.4 1700 5,284 9 47.6 23.8 1800 5,594 9 50.3 25.2 1900 5,905 9 53.1 26.6 2000 6,216 9 55.9 28.0 2100 6.527 9 58.7 29.4 L120 ENGINEERING &DESIGN PROJECT LONGITUDE SUBJECT ONE TWENTY° ENGINEERING & DESIGN BY ZT •. PROJECT NO. SHEET NO. 1 1: 709 7th Ave S, Edmonds, WA 98020 Foundation Stabilization/Jackin DATE 1 /18/2021 Stnbil-Loc 2-7/8"0 i.) Power Team C25C Hydraulic Cylinder effective cylinder area has from manufacturer cut sheets ii.) Piles shall reach a pressure that correlates with an allowable capacity that meets or exceeds the maximum allowable load demand as listed in the structural package, but shall not exceed the maximum allowable capacity for any part of the pile assembly. iii.) Referto ESR-4121 and Stabil-Loc, Inc. documents for additional information and requirements. iv.) 1 kip =1,000 Ibs Concentric Pier -Soil Capacity per by Installation Pressure Power TeamC25C Hydraulic Cylinder Pressure, p (psi) Cylinder Effective Area, A z (in J Ultimate Axial Compressive Capacity, P„ =pxA (kips) Allowable Axial Compressive Capacity, Pa=0.5xP„ (kips) 1,000 5.15 5.2 2.6 1,500 5.15 7.7 3.9 2,000 5.15 10.3 5.2 2,500 5.15 12.9 6.4 3,000 5.15 15.5 7.7 3,500 5.15 13.0 9.0 4,000 5.15 20.6 10.3 4,500 5.15 23.2 11.6 5,000 5.15 25.3 12.9 5,500 5.15 23.3 14.2 6,000 5.15 30.9 15.5 6,500 5.15 33.5 16.7 7,000 5.15 36.1 13.0 7,500 5.15 33.6 19.3 8,000 5.15 41.2 20.6 3,500 5.15 43.3 21.9 9,000 5.15 46.4 23.2 9,500 5.15 43.9 24.5 L120 ENGINEERING &DESIGN PROJECT LONGITUDE SUBJECT ONE TWENTY° ENGINEERING & DESIGN BY ZT PROJECT NO. SHEET NO. 1 1: 709 7th Ave S, Edmonds, WA 98020 Foundation Stabilization/Jacking DATE 1/18/2021 Ideal Foundation Systems 1-112 V Helical Tieback - Soil Tension Capacity per ESR-3750 DIGGA 10K Drive Head Pressure (psi) Torque, T (ft•Ibs) Torque Correlation Factor, Kt T Tension (ft ') Ultimate Axial Tensile Capacity, P � = Kt•T (kips) Allowable Axial Tensile Capacity, P. = 0.5•P„ (idps) 500 1,740 8.5 14.8 7.4 600 2,098 8.5 17.7 8.9 700 2,436 8.5 20.7 10.4 800 2,784 8.5 23.7 11.8 900 3,132 8.5 26.6 13.3 100C 3,480 8.5 29.6 14.8 110C 3,828 8.5 32.5 16.3 1200 4,176 8.5 35.5 17.7 1300 4,524 8.5 38.5 19.2 140C 4,872 8.5 41.4 20.7 1500 5,220 8.5 44.4 22.2 1600 5,568 8.5 47.3 23.7 1700 5,916 8.5 50.3 25.1 180C 6,264 8.5 53.2 26.6 1900 6,612 8.5 56.2 28.1 2000 6,980 8.5 59.3 29.7 i.) DIGGA 10K Drive Head differential pressure display to torque output has been pulled from the attached conversion charts provided by DIGGA. ii.) Per Table 5C of ESR-3750, the maximum installation torque rating of a 1-1/2"0 helical pile is 6,980ft•lbs. This maximum installation torque limitation may differ from that listed by Ideal Manufacturing, Inc. Final installation torque shall not exceed the lesser of these limiting values. iii.) Piles shall reach a torque that correlates with an allowable capacity that meets or exceeds the maximum allowable load demand as listed in the structural package, but shall not exceed the maximum allowable capacity for any part of the pile assembly. iv.) Refer to ESR-3750 and Ideal Manufacturing, Inc. documents for additional information and requirements. v.) Definitions per ESR-3750: T = Final Installation torque in ft•Ibs; the last torque reading taken during pile installation, using, for example, the torque reading instruments connected to the installation equipment. Kt = Torque correlation factor per ESR-3750 P„=Ultimate axial tensi le capacity (in kips) of helical pile P. =Allowable axial tensile capacity (in kips) of helical pile vi.) For torque readings between those listed, use the following equation to determine the allowable capacity: P, = (T•Kt)/2 vi i.) 1 kip =1,000 I bs L120 ENGINEERING & DESIGN Iffillne V41 Monday, December 7, 2020 SCOPE OF WORK Crew will install 3" Helical Piles, 3" Concentric Piers, as well as a Helical Tieback with Plate, and lift home to maximum practical recovery. Crew will drive piles to a maximum 25' after there will be a $20 a foot charge per pile. Crew will Slabjack slab, homeowner will need to remove furniture and pull back carpet in area that will be slabjacked. All piles will be handheld only. Crew will remove and replace deck boards. Crew will remove and replace concrete holes. L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and piles are installed with a maximum pile spacing of 6-0" o.c. per the attached SSK-01 & SSK-02. NOTES: 1. It is acceptable to install piles at the spacing shown with ± 0'-6" tolerance to allow for unexpected obstructions encountered during pile installation provided that no two adjacent spans exceed the spacing limitation of 8'-0" o.c. UNO. 2. End piles are to be placed within T-0" from corner as specified below UNO. =VLL SURVEY 44' f i -3/4 -1 3/8 _ LOCATE PILES WITHIN T-0" FROM CORNER -7 = 3" Helical Pile - 6 -1 7/8 m i = Helical Tieback _ 5 = 3" Concentric. Pier -1 1/2 � (8) PILES @ 6'-0" OC MAX LOCATE PILES2 3/4 --3 n LOCATE PILES -1/2 WITHIN 1'-0" FROM CORNER IN WITHIN 1'-0" FROM DOOR OPENING _ 2 LOCATE TIEBACK 2'-0" 6.5' MIN AND T-0" MAX FROM CORNER cn_ (6 1 1'-6" MIN FROM TOP OF 0 _ 1 /04 ��1 /2 1 /4 { -3 1 / WALL 10, 1 27.5' 6-0" MAX r Deck (2) PILES @ 6'-0" OC MA �22 15.1' NOTE: 1-120's scope is limited to the perimeter support systems/continuous footings of the primary structure. All stabilization and replacement efforts of interior elements, exterior decks, and deck supporting elements are outside of 1-120's contract and scope and are not addressed in this package. - L120 12 of 28 Monday, December 7, 2020 guts rHOTOS Ilk 91 t jr Front of deck. Crew will remove and replace deck boards so piles can be installed Front of home, Piles 1-3 will be installed here by handheld only. Crew will remove and replace deck boards. Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. - L120 South side of home, Piers 1-8 will be installed here by handheld only. Crew will remove and replace concrete holes. Tieback Pile 1 will also be installed here with plate. Crew will slabjack slab as needed to raise home. LONGITUDE ONE TWENTYO ENGINEERING & DESIGN 13 of 28 PROJECT NO. NO. S201208-2XR SSK-01 PROJECT 709 7th Ave S, Edmonds, WA 98020 SUBJECT Installation Detail - Ideal Helical Pile BY ZT (E) WOOD FRAMED FLOOR SYSTEM, FIELD VERIFY 8" MIN THICKNESS, CONTRACTOR TO VERIFY �ry (DOILL =aLu z j z O O U CV -"II=1111=1111=1111=1111=IIII=11 V d '1=1111=IIII=11 • 11=IIII=1111 �- III-1111 n Illlilllllllllllllll (E) CONTINUOUS CONIC FOOTING NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT CORROSION. DATE 1 /18/2021 (E) CONIC STEM WALL T/STEM WALL = FIELD VERIFY T/FIN GRADE _ VARIES (E) FTG TO BE CUT FLUSH ITH FACE OF STEM WALL ITH A 12" MAX WIDTH FOR INSTALLATION POCKET T/GONG FTG = FIELD VERIFY IDEAL HELICAL PILE & REPAIR BRACKET ASSEMBLY PER R&R FOUNDATION SPECIALIST TO CONFORM TO ESR-3750 L120 ENGINEERING & DESIGN LONGITUDE ONE TWENTY ENGINEERING & DESIGN 14 of 28 PROJECT NO. NO. S201208-2XR SSK-02 PROJECT 709 7th Ave S, Edmonds, WA 98020 SUBJECT Installation Detail - Stabil-Loc Concentric Pile BY ZT (E) WOOD FRAMED FLOOR SYSTEM, FIELD VERIFY 8" MIN THICKNESS, CONTRACTOR TO VERIFY IIII=1 =IIII=11 it —IIII=1111— (E) CONTINUOUS CONIC FOOTING DATE 1/18/2021 (E) CONIC STEM WALL �� •. =IIII=_IIII=IIII=_III � ;IIII=IIII=IIII=IIII= ° a �. =IIII=_IIII=_IIII=11 ,IIII—IIII—IIII—IIII— • =_IIII=_IIII=_IIII=_IIII • I° IIII=IIII=IIII=IIII=1 d —IIII=_IIII=_IIII=_IIII_= ° .I ' • ,IIII—IIII—IIII—IIII—II ' I =_IIII=_IIII=_IIII=_IIII= o •1° IIII=IIII=IIII=IIII=1 III=IIII=IIII=IIII= ' ' allll=IIII=IIII=IIII-IIII. ° IIII=IIII=IIII= ' I � : a •. =_IIII=_IIII_=11 IIII=IIII=IIII ' III=IIII= In n — __=IIII=IIII= IIII=IIII=IIII=� IIII II I=IIII— NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL II �3: REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT w CORROSION. � U) 'j,,0 T/STEM WALL = FIELD VERIFY T/FIN GRADE _ VARIES T/GONG FTG = FIELD VERIFY WEDGE ANCHORS PER STABIL-LOC REQUIREMENTS STABIL-LOC CONCENTRIC PIER ASSEMBLY PER R&R FOUNDATION SPECIALIST TO CONFORM TO ESR-4121 L120 ENGINEERING & DESIGN LONGITUDE ONE TWENTY ENGINEERING & DESIGN 15 of 28 PROJECT NO. NO. S201208-2XR SSK-03 PROJECT 709 7th Ave S, Edmonds, WA 98020 SUBJECT Retaining Wall - Pile Installation Detail BY 'T DATE 1 /18/2021 (E) WOOD FRAMED WALL SYSTEM TIEBACK ANCHOR DETAIL PER SSK-04 (E) CONC SLAB -ON -GRADE T/(E) SOG = /I T/WALL , FIELD VERIFY d 9 d I � 1 IIII=IIII=IIII=IIII=IIII=IIII IIII=IIII=IIII-11-�1 IIII=IIII=IIII=IIII=IIII= III=IIII =IIII=IIII�IIII —d _ ; TIEBACK ANCHOR IIII=IIII=IIII=IIII=IIII IIII=IIII=IIII=Ilq=1 I POINT OF INSTALLATION '=IIII=IIII=IIII=IIII= III=IIII=IIII=IIII= I III—IIII—IIII—IIII=IIII IIII—IIII= —I ° ' d � (E) FOUNDATION WALL W1, =8" MIN THICKNESS =III C7 11=IIII=IIII=IIII=1 ° . Q w =IIII=IIII=IIII=IIII FIELD VERIFY IIII=III � = 11=IIII=IIII=IIII=1 IIII=_ = o =IIII=IIII=IIII=IIII ° 11=_IIII= o z II=_IIII=_IIII=_IIII=1 ° 'IIII=1' � Q =IIII=IIII=IIII=IIII . =IIII= 11=IIII=IIII=IIII=1 EXTERIOR 'III=1 Lu =IIII=IIII=IIII=IIII I_IIIIIIIII—_,,,,_� II=_IIII=_IIII=_IIII=1 d •. —IIII—IIII—IIII—IIII d 'IIII=IIII=IIII IIII=IIII=IIII=IIII=1 � . IIII-IIII- III=IIII=IIII=IIII-IIII () E CONCRETE STAIR II=IIII=IIII IIII=IIII=IIII=IIII=1 ° ' d 'llI=IIII= III=IIII=IIII=IIII=IIII • -IIII=IIII IIII=IIII=IIII=IIII=1 � . -IIII= III=IIII=IIII=IIII=IIII T/CONCRETE IIII— III—IIII—IIII—IIII—IIII d d d d -IIII IIII=IIII=IIII=IIII=1 � � � ' —IIII—IIII=1 d d d dlII—IIII—IIII—IIII IIII=IIII=111'- (E) CONIC FOOTING - —IIII=IIII III=IIII=IIII IIII=IIII-- 11=IIII=IIII III=IIII=11 NOTES: III=IIII=IIII=IIII=IIII=IIII=IIII=IIII=IIII=IIII=11'' 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXIST��I,IIII=IIII=IIII=IIII=IIII=IIII=IIII=IIII='' =IIII=IIII=rill=IIII=IIII=IIII=i"'- FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. — ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. L120 ENGINEERING & DESIGN LONGITUDE ONE TWENTY ENGINEERING & DESIGN PROJECT SUBJECT BY -I 16 of 28 PROJECT NO. NO. S201208-2XR SSK-04 709 7th Ave S, Edmonds, WA 98020 Retaining Wall - Pile Installation Detail DATE 1/18/2021 ' d 11=IIII=IIII=IIII=IIII= (E) FOUNDATION WALL, IIII=IIII=IIII=IIII=IIII. 8"MIN THICKNESS, I1=Ii11=Ii11=IiI1=IiI1=u FILL CUTOUT WITH Ii11=Ii11=Ii11=Ii11=IIII STRUCTURAL GROUT FIELD VERIFY d 11=IIII=IIII=IIII=IIII= lilt=rill=rill=rill- POST -INSTALLATION • 11=IIII=IIII=IIII= _ IIII=IIII=IIII-_=11� TIE -BACK ANCHOR ' d •. 11=IIII=IIII= =IIII=I IIII=IIII= =IIII=IIII= ADAPTER AND � 11=IIII=� =IIII== I �QIi11=i =IIII-rillIIII— 11- WASHERS PER R&R \p � ° ' d •. II=1 =IIII=_III _IIII= =IIII=1 —IIII=1i =IIII==Ii11=1iI1= HELICAL TIE -BACK =IIII=Fill=Fill= ANCHOR PER R&R 11= 11=IIII=IIII=IIII= I. J III=IIII=IIII=IIII=1 G 11=IIII=IIII=IIII =III —i' IIII=1111=1111=IIII I I' HORIZONTAL PLANE ITl TIT= FIT I1 0 (MIN) THRD ROD IIII=1 I= INCLINATION ANGLE, W/ STD NUT IIII_ IIII=15° MIN, 30° MAX ° d •.11=_IIII=__ =IIII IIII_._. d IIII—IIII—II III—IIII—IIII=,. • 11=IIII=IIII=IIII= I=III —IIII=1 PL1/2" x 6" x a + 1° IIII=IIII=IIII=IIII= III=IIII= d •.11=IIII=IIII=IIII=IIII=III 1=IIII=IIII=IIII= BEARING PLATE, IIII=IIII=IIII=IIII=IIII= 11= =11 1=IIII=III CTRD AT CUTOUT 11=IIII=IIII=IIII=IIII=IIII=IIII=1 III=IIII= . ° IIII=IIII=IIII=IIII=IIII=IIII=IIII=III II=IIII ° d •.II=IIII=IIII=IIII=' "=IIII=IIII=IIII= III=i IIII=IIII=III' ''I�=IIII=IIII=11 =1'' • 11=IIII=IIII= '-IIII=IIII=11' • IIII=IIII=11 ' d •. 11=IIII=IIII- d IIII—IIII—I. • 11=IIII=IIII=_ . ° IIII=IIII=IIII ' d 11=IIII=IIII- NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. L120 ENGINEERING & DESIGN 1 1/2 X 1 SLOT(TYP) 2 7/8" TRUFORCE BRKT BASE GALV. TOP 2 7/8 TRUFORCE BRKT BASE GALV. FRONT" TRUFORCE UNDERPINNING BRACKET FOR 2 7/8" PILE SHAFT 7'Y2 -- + 1 1/2 X 1 2 7/8" TRUFORCE BRKT T-BRKT GALV. SLOT (TYP) TOP -10 2 7/8" TRUFORCE BRKT T-BRKT GALV. FRONT NOTES: 1. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ASTM A572/A1018/A656, 50 KSI. 2. ALL WELDING TO BE PERFORMED BY SHOP QUALIFIED WELDOR TO AWS D1.I STRUCTURAL WELDING CODE - STEEL. 3. GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 4. ULTIMATE STRUCTURAL CAPACITY IS 60 KIPS. 5. (2) 7/8"-9 X 3' GALVANIZED THREADED ROD - ASTM A193 (GRADE B7). 6. (4) 7/8" GALVANIZED HEX NUT - ASTM A194. 7. (6) 7/8" GALVANIZED FLAT WASHERS - ASTM F436. (2) WASHERS MUST BE USED ON THE TOP OF EACH THREADED ROD (ABOVE THE 'T' BRACKET) TO OBTAIN THE FULL BRACKET CAPACITY. 8. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. PICTURE PARKWAY STER, NY 14580 789-4810 1 WWW.IDL-GRP.COM NOT TO SCALE ALL UNITS IN INCHES U.N.O. 3 401DEAL Group 278TFG THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION OF IDEAL MANUFACTURING, INC. IS PROHIBITED. SHEET 1 OF 1 A 1 1 2 W ULTEMA CAPACITY IIS740.7EXCEEKIPS IMUM TORQUE NOT AS ON A CAPACITY TO 2 7/8" O.D. X 0.203'' W.T. HELICAL LEADS & EXTENSIONS TORQUE RATIO OF kt = 9 FT-1 ICC-ES AC358 -REPORT #ESR-3750 [L] EXTENSION FLIGHTED EXTENSION FLIGHTED EXTENSION (EX: 278203EXT[L]G) SINGLE HELIX (SH) DOUBLE HELIX (DH) (EX: 278203FESH[L][Di]X[T]G) (EX: 278203FEDH[L][DID2]X[T]G) NOTES: 1. PILE SHAFT TO MEET OR EXCEED REQUIREMENTS OF ASTM A500, 80 KSI. 2. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ATSM A572, GRADE 50. 3. ALL HELICES ARE FORMED BY PRESS DIE. LEADING EDGE OF HELICES ARE TAPERED TO IMPROVE INSTALLATION CAPABILITIES. 4. HELIX SPACING IS THREE (3) TIMES THE DIAMETER OF THE LOWER HELIX. B SPACING OF LEADING HELIX ON FLIGHTED EXTENSIONS IS THREE (3) TIMES THE DIAMETER OF THE LAST HELIX ON THE PRECEDING SHAFT. 5. STANDARD HELIX DIAMETERS ARE 8", 10", 12", & 14". STANDARD HELIX THICKNESS IS 3/8". 6. ALL WELDING TO BE PERFORMED BY CERTIFIED WELDOR IN ACCORDANCE WITH AWS D1.1 STRUCTURAL WELDING CODE - STEEL. 7. HOT DIP GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 8. (2) 3/4" DIAMETER X 4 1/2" LONG GALVANIZED HEAVY HEX BOLT ASTM A325 AND (2) 3/4" GALVANIZED HEAVY HEX NUT ASTM A194 (GRADE 2H). 9. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 (IDEAL REPORT #ESR-3750) ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. pa I p3 I �I �D3 �D= �{ �D� I I I p3 —Li LING NUTS 5% (TYP) ?� 1 SINGLE HELIX (SH) DOUBLE HELIX (DH) TRIPLE HELIX (TH) QUAD HELIX (QH) LEAD LEAD LEAD LEAD (EX: 278203SH[L][Di]X[T]G) (EX: 278203DH[L][DiD2]X[T]G) (EX: 278203TH[L][D'D2D3]X[T]G) (EX: 278203QH[L][D3D2D3D4]X[T]G) 2%O.D.X� 2 4 IDEAL PART # ABREVIATIONS: 0.203 W.T. 278 = SHAFT DIAMETER = _ 3 PITCH TYPICAL PILE 203 = SHAFT WALL THICKNESS ASSEMBLY EXT = EXTENSION (NP) FE = FLIGHTED EXTENSION O15l6 SH, DH, TH, QH = SINGLE, DOUBLE, TRIPLE, OR QUAD. HELIX [L] = SHAFT LENGTH IN FEET BOLT HOLE HELIX FORMED BY (EXAMPLE: 7' = 7) DETAIL PRESS DIE [D] = HELIX DIAMETER(S) IN INCHES (EXAMPLE: 10" = 10) X = X (SEPARATES HELIX DIAMETER(S) AND HELIX THICKNESS) [T] = HELIX THICKNESS (EXAMPLE: 3/8" = 38) G = GALVANIZED PICTURE PARKWAY STER, NY 14580 789-48101 WWW.IDL-GRP.COM NOT TO SCALE ALL UNITS IN INCHES U.N.O. 3 401DEAL Group 278203 SINGLE HELIX EXTENSION TRIPLE HELIX LEAD TIP CUT AT 45° THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT WRITTEN PERMISSION OF IDEAL MANUFACTURING, INC. IS PROHIBITED. SHEET 1 OF 1 B 19 of 28 ESR-4121 I Most Widely Accepted and Trusted • rooms 2-1+'# a�' rr (2Ki DHDk AT q ESP INS WEDGE A90f0'6 B - - E sow BLOCK {pp / `HEAD o R ATE nano F MSS2." NOIEE I I OUT 10 m II IIV-ZTWTAL �� CUT ICIER t XED 'ER W'�1 I OUTS MSS AT CUTS NSN1AiDA In OW T`fli1L OTTER FOOTINGR'A SELI[XT ROUND HSS I 7.dTJ>m.21 F ASIY A300-13 I ASWUN EO NIER 01. 0 I • OUTER PER I SEGYETIS I T`P1CAL 114ER I R31 SEOIENT ROUND HSS F 2.5152m ASI4 A500--I4 G.0 I STMTTER � Ayagv I BEDIM OR OTHER NIITAHF S1RA'A S'ARTER ASSODLY PIER ASSEMBLY STABIL-LOC SYSTM, LLC DATE: B-12-18 FIGURE 1—STABIL-LOC FOUNDATION PIERING SYSTEM OUTLINE OF BEARING o: ARING PLATE I HSS2.375xO.188 CUT TO FIT & INSTALL AFTER COMPLETED PIER INSTALLATION 1 N 4 I I I 12 PLAIN VIEW R10xAx18 BETWEEN BRG t & FOOTING „*—FOOTING �2-4"O IT 3.5" MIN, FSR 1 96 WFDLN I ESR 1396 WFDG= ANCHORS HOLES SHIM BLOCK PLATE ASSEMBLED INNER & OUTER PIER SEGMENTS HEAD ASSEMBLY S-ABIL,X SYS7EMS. L1C FIGURE 2—STABIL-LOCI FOUNDATION PIERING SYSTEM ADJUSTABLE HEAD ASSEMBLY PROJECT LONGITUDE SUBJECT ONE TWENTYO ENGINEERING & DESIGN Maximum loading on grade beam determined based on building geometry, and through conservative assumptions regarding span lengths and support walls/foundation. Basically, all concrete walls assumed full tributary span of floor members and roof members. Design code: IBC 2015 Roof LL (snow ground): 25 psf Floor LL: 40 psf Floor/Roof DL: 15 psf Wall DL: 12 psf 4' Ht Conc Wall DL: 150pcf x 392 in2 = 409 plf * see following pages for area calc Helical Pile #143 & Concentric #1 Roof Trib = 0.5*40' = 20' Floor Trib = 0.5*20' = 10' Deck Trib = 2*5' = 10' Typical Flr Ht = 20' Helical Pile #142 0.5*10' hdr span +0.5*6' = 8' Trib Concentric Pile #248 Roof Trib = 2' trib + 2' overhand = 4' Floor Trib = 0.5*20' = 10' Typical Flr Ht = 20' BY ZT Helical Pile #3 & Concentric #1 Case 1: Point Load (6' Span) Pile Reaction = 3140 plf * 6' = 18.9 k Pile Reaction w/ SW = 3549 plf * 6' = 21.3 k Case 2: Uniform Load DL = 12*20 +15*(20+2*10+10) = 990 plf LL = 40*10*2 + 60*10 = 1400 plf SL (snow) = 25*(20+10) = 750 plf Total load = DL+LL+SL = 3140 plf Total load w/ SW = 3140 + 409 = 3549 plf Refer to attached calculations for analysis. Helical Pile #142 Point Load (8' trib) Pile Reaction = 3140 plf * 8' = 25.2 k Refer to attached calculations for analysis. Main. PROJECT NO. SHEET NO. 1 1: 709 7th Ave S, Edmonds, WA 98020 Foundation Stabilization/Jacki DATE 1 /18/2021 - - - - - - - - - - - - - - - - ---------------- L/2 L/2 Concentric #248 Case 1: Point Load (6' Span) Pile Reaction = 1500 plf * 6' = 9.0 k Pile Reaction w/ SW = 1909 plf * 6' = 11.2 k Case 2: Uniform Load DL = 12*20 +15*(4+2*10) = 600 plf LL = 40*10*2 = 800 plf SL (snow) = 25*4 = 100 plf Total load = DL+LL+SL = 1500 plf Total load w/ SW = 1500+409 = 1909 plf Refer to attached calculations for analysis. RIFY Conclusion: Based on the loading and geometry of the structure we conclude that the foundation may be stabilized through the use of piles and connections per R&R. These are to be attached to the stem -wall (grade -beam) at an on -center (o.c.) spacing no greater than 6'-0" o.c.. R&R to verify 4'-0" minimum concrete wall height at all pile installation locations. L120 ENGINEERING & DESIGN 21 of 28 LONGITUDE ONE TWENTY ENGINEERING & DESIGN Assumed Soil Parameters Soil Density, p = 135 pcf Friction Angle, cp = 30 deg At Rest ko = 1 - sincp At Rest ko = 0.50 Active ka = (1 - sin(p)/(1 + sin(p) Active ka = 0.33 7 --• 0• = I = = E 0• S201208-2XR SSK-003 PROJECT 709 7th Ave S, Edmonds, WA 98020 SUBJECT 4'-0" Retaining Wall BY DATE 1 /18/2021 Surcharge, w = 60psf Seismic 10H Force Calculations Surcharge w*ka At Rest Max Press = H*p*ko At Rest Press = 4' *135pcf *0.5= 270 psf Po = 0.5*270psf*4' = 540 plf Surcharge Pressure = w*ka = 60psf*0.33 Psur = 20 psf * 4' = 80 plf Eq Pressure = 10H = 10 * 4' = 40 psf Peq = 40psf * 4' =160 plf Mbase = - RU_anch*2.5' + 540*1.33' + (80+160)*2' = 0 R,_a,,h = 480 plf Horiz Tan,h = 480 plf / cos(30°) = 555 plf Tension Anchors A 8'-0"oc = 4.5 k per anchor L120 ENGINEERING & DESIGN 22 of 28 Project Number: Plan Name: Sheet Numbec S201208-2XR 709 7th Ave S Edmonds Engineer: Subject: Date: zT 4ft Unreinforced Conc Beam 1/18/2021 DEMAND CALCULATION number of stories # Custom span L 6.0 ft [max on -center pile spacing] concrete area A 392 in2 *see attached concrete self weight SW 408 plf [Includes total height w/o ACI14 §14.5.1.7 redux] Pt DL DL 5.94 k = 6.0 ft * 990 Pt LL LL 8.40 k = 6.0 ft * 1400 Pt LLr LLr 4.50 k = 6.0 ft * 750 moment from DL MDL 10,748 lb-ft 129.0 k-in moment from LL MLL 12,600 lb-ft 151.2 k-in moment from SL MLLr 6,750 lb-ft 81.0 k-in factored moment MLRFD 180.6 Wn 1.4DL MLRFD 437.2Wn 1.2DL + 1.6LL + 0.55L MLRFD 435.6 Wn 1.2DL+ 1.6SL+ LL controlling factored moment M„ 437.2 Wn factored shear VLRFD 5.9 k 1.4DL VLRFD 12.9k 1.2DL + 1.6LL + 0.55L VLRFD 12.8 k 1.2DL+ 1.6SL+ LL controlling factored shear V. 12.9 It controlling factored bearing B„ 12.9 k [R=V for SS beam] STRENGTH CALCULATION concrete strength f'c 2.5ksi assumed light wt concrete mod. factor A 1 normal weight concrete flexure strength red. factor brie, 0.9 tension -controlled ACI14 [Table 21.2.11 shear strength red. factor shear 0.75 ACI14 [Table 21.2.11 bearing strength red. factor .y .0a g 0.65 ACI14 [Table 21.2.11 moment ofineritia I, 73,974 in4 *see attached elastic section modulus Sm 3,397 in3 *see attached tens fiber to NA c 24.2 in *see attached nom flexure strength (T controls) M" 849.3 k-in Mn = 52Vf7cSm ACI 318-14 [Eq. 14.5.2.1a] nom flexure strength(C controls) M" 7,218.6 k-in M. = 0.85f'S ACI 318-14 [Eq. 14.5.2.1b] RESIDENTIAL CONCRETE Mr, 1,273.9 k-in Mn = 7.55dVf7cSm CONTROLS ACI 332-14 [Eq. 8.2.1.1] flexure strength (Wn > Mu OK D/C= 38.13% 1,146.5 k-in nom shear strength V„ 26.1 k Vn = A fc * A ACI14 [Table 14.5.5.1 (a)] 3 shear strength (V" 19.6 k > V. OK D/C= 65.71% loaded bearing area Ai 74 in2 [IDEAL 2-7/8" Tru-Force Underpinning Bracket] supporting surface bearing area Ai 74 in2 [If the supporting surface is > than loaded area] nom bearing strength B" 156.6 k 0.85j,.'A ACI14 [Table 14.5.6.1(c)] bearing strength cl�Bn 101.8 k > Bu OK D/C= 12.65% Additional Verification Calc: max concrete tensile strength max beam tensile stress fr 375 psi fr = 7.SA fc Fr 143 psi Ft - (M * c)/ Lxx f, > Ft OK ACI 14 [Eq. 19.2.3.1] 23 of 28 Project Number: Plan Name: Sheet Number: s201208-2XR 709 7th Ave S Edmonds Engineer: Subject: Date: ZT 4ft Unreinforced Conc Beam 1/18/2021 Final Section Properties Total Area 392.0 in12 Ixx 73,974.2 in^4 Sxx : - Y 3.397.13 in"3 lyy 2,570-55 in^4 Sxx : +Y 3,053,70 in^3 Calculated final C.G. distance from Datum X cg Dist. 0.0 in Zxx 4,693.99 in^3 Syy : - X 428.425 in^3 Syy : +X 428.425 in 3 Y cg Dist. 0.0 in Zyy $56.0 in^3 Edge Distances from CG. ; r xx 13.737 in +X 6.0 in .Y 24.224 in r yy 2.561 in -X -6.0 in -Y in Rotation of All Components @ . 0 00 deg CCW v XCG � t r � r ` CISPer AC1316 14 Section 14 5.1.7 Y General Shapes - i #1 Xcg = 0.000 In Ycg = 0.000 in Rotation = 0 deg CCW Top Flange Width = 8.000in Top Flange Th-ck = 12.0001n Web Thickness = 8.000in Bottom Flange Wid 12 OOOm Bottom Flange Thi 6,000in Top Height = 46.000In MznWV Appendix Parcel Details Photographs 1/17/2021 25 of 28 SnohomishOnline Government Information & Services County -A, Washinaton Property Account Summary 1/17/2021 Parcel Number 100484500503601 lProperty Address 1709 7TH AVE S, EDMONDS, WA 98020-4012 `General Information Property Description KELLOGG PLAT OF EDMONDS BLK 005 D-02 - THE N1/2 LOTS 36-37-38- 39 & 40 EXC E IOFT LOT 36 THOF Property Category Land and Improvements Status Active, Locally Assessed Tax Code Area 00210 Property Characteristics Use Code I I I Single Family Residence - Detached Unit of Measure Acre(s) Size (eross) 0.18 Related Propertie No Related Properties Found Partie I (Role I PercentIName (Address I I (Taxpayer Owner� Property Values 100 VENABLE ROBERT 709 7TH AVE S, EDMONDS, WA 98020 AMENABLE NANCY 100 VENABLE ROBERT A & 709 7TH AVE S, EDMONDS, WA 98020- NANCY 4012 United States Value Type Tax Year 2020 Tax Year 2019 Tax Year 2018 Tax Year 2017 Tax Year 2016 Taxable Value Regular $1,021,700 $983,600 $854,000 $777,600 $731,100 Exemption Amount Regular Market Total $1,021,700 $983,600 $854,000 $777,600 $731,100 Assessed Value $1,021,700 $983,600 $854,000 $777,600 $731,100 Market Land $618,400 $602,400 $510,700 $459,000 $420,600 Market Improvement $403,300 $381,200 $343,300 $318,600 $310,500 Personal Property Active Exemptions No Exemptions Found Events W W i Effective Entry Date- Type Remarks Date Time 11/16/2020 11/16/2020 Excise Processed Temporary Excise: T127533 Finalized to: E151314 16:05:01 11/09/2020 11/17/2020 Recording No. Property Transfer Filing No.: E151314, Statutory Warranty Deed, new Recording No.: 14:00:00 Changed 202011167070 11/09/2020 by sasset 11/09/2020 11/17/2020 Owner Property Transfer Filing No.: E151314 11/09/2020 by sasset 14:00:00 Terminated 11/09/2020 11/17/2020 lOwner Added iProperty Transfer Filing No.: E151314 11/09/2020 by sasset 1 /17/2021 Levy Rate History 4.. IPV Tax Year Total Levy Rate 2020 9.337975 2019 9.270960 2018 10.730353 Real Property Structures Description Year Built More Info 1 Story w/Basement IDwelling 1975 View Detai 709 7th Ave S Edmonds 0 56 113 Feet 1/17/2021 O S^ Snohomish County Assessor W.15hill9tol, :- -----------------•-•-•----`, Legend Parcel Recent Sales 2020 Recent Sales 2019 Recent Sales 2018 City Boundary County Park National Forest Water Street Types Interstate State Route Local Road All maps, data, and information set forth herein ("Data"), are for illustrative purposes only and are not to be considered an oficial citation to, or representation of, the Snohomish County Code. Amendments and updates to the Data, together with other applicable County Cede provisions, may apply which are not depicted herein. Snohomish County makes no representation or warranty concespmg the cement, accuracy, cogency, completeness or quality of the Data contained herein and expressly disclaims any warranty of merchantability or fitness for any particular purpose. All persons accessing or otherwise using this Data assume all responsibility for se thereof and agree to hold Snohomish County harmless from and against any damages, loss, calm or liability arising out of any error, defect or emissioncontained within said Data. Washington State Law, Ch. 42.56 RCW, prohibits state and local agencies from providing access to lists of intlivitluals intended for use for commercial purposes and, thus, no commercial use may be made of any Data comprising lists of individuals contained herein. N) 0 N) 00 28 of 28 W ON Oki, Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -1-120