Special Inspections by Nelson Geotechnical
required for:
1. Temporary Erosion Control Measures. ;
2. Removal of Undocumented fill and Structures. ;
3. Drainage.
4. Site Restoration / Final letter of Acceptance.
5. All other recommendations as found in the '
provided reports by Nelson Geotechnical
Associates.
L ..............................................
'
Nothing in this permit approval process shall be
interpreted as allowing or permitting the
maintenance of any currently existing illegal,
nonconforming or unpermitted building, structure or
site condition which is outside the scope of the
permit application, regardless of whether such
building, structure or condition is shown on the site
plan or drawing. Such building, structure or
condition may be the subject of a separate
enforcement action.
City Of Edmonds
Building Department
Work DEMO RETAINING WALL, CONCRETE STAIRS,
AND SITE RESTORATION
Address: 16000 75TH PL W
Owner ; FLOREZ
Approved Date: 7 —12 — 2 0 21
Building Official : EYili CaviFer
Permit Number:
BLD2020-0623
--------------------------
Work under this permit must be completed and
approved by the City within 60 days after '
I obtaining the permit, which effectively is
' September 13, 2021. For reference see I
Issuance Letter from Building Official_ - — - — -
APPROVED
PLANS MUST BE
ON JOB SITE
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
NOTE: This Stamp page must remain with the city approved plans at all times. Failure to have this
Stamp page with the City approved plans could result in delay of the inspections including the FINAL
inspection. If lost please contact the city as soon as possible to find a solution. Thank You.
BLD2020-0623 RECEIVED 7/2/2021
Jul 07 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES - - - - - - - -
DEPARTMENT I CITY OF EDMONDS
City of Edmonds, BUILDING DIVISION
Florez Retaining Wall Removal I APPROVED PLAN
1600075t"PLW,— -— - —- — - —
Edmonds, WA 98026
Construction/Landscape/Site Restoration Plan
The pond is filled via garden hose and yard faucet and drained with a manual pump. We
have a Helix filtration system connected to the pond for recirculation and filtering.
Work to be
completed
The demolition and site work will be completed within the 30days following the
under
issuance of the permit. The work will be under the monitoring of the Nelson
separate
Geotechnical Associates.
permit
We will Install and maintain all TESC measures according to approved plans, City of
Edmonds standard details, and all other measures that may be required during the course
of the project.
• Nelson Geotechnical Associates will be retained to provide construction
monitoring services during the earthwork phase of the project and during the wet
season work, to evaluate slope conditions, any excavations and drainage system
installations. We will follow their recommendations, such as but not limited to:
- Remove the undocumented fill soils from the existing retaining wall alignments
- All debris, including the organic -rich topsoils and demolished wall, should be promptly
removed and hauled away from the site.
- After the loose organic rich soils and retaining wall have been removed, the slope
should be graded to no steeper than 4H:1V and covered with erosion control material.
- Best Management Practices will be used to control erosion. Areas disturbed during wall
removal will be protected from erosion. surface water may be diverted away from the
stripped areas and bare soils. Silt fences or straw bales will be erected to prevent muddy
water from flowing over the site slopes.
- Disturbed areas will be replanted with vegetation at the end of demolition. The final
graded slope will be stabilized by plantings and erosion control measures consisting of
heavy-duty jute netting or coconut coir grid.
- Final grading will incorporate appropriate erosion control measures to route stormwater
runoff away from sloping areas and to appropriate discharge locations.
- Runoff will not be allowed to flow over the site slopes either during demolition or on a
permanent basis after demolition has been completed.
- The site steep slopes will not be disturbed or modified through placement of any fill or
removal of the existing vegetation. No material of any kind, such as excavation spoils,
lawn clippings, debris, and soil stockpiles, will be placed on or near the slope.
7/2/21
- Any sloping areas disturbed during demolition will be planted as soon as practical to
reduce the potential for erosion. The new vegetation will be maintained until it is
established.
- Replacement of vegetation will be performed in accordance with the City of Edmonds
code. Under no circumstances will water be allowed to concentrate on the slopes.
* Pursuant to removal of the retaining wall and following regrading of slopes, permanent
stabilization shall be installed consistent with Nelson Geotech recommendations. Permanent
stabilization shall include surface plantings, which are to be maintained by owner until fully
established.
* Any temporary or permanent routing of surface water onto BNSF slope shall be per the
approval of BNSF.
DATE: 7/2/2021
TO: Jeanie McConnell, Engineering Program Manager
FROM: JORGE A FLOREZ
Owner
RE: Plan Check: BLD2020-0623
Project Address: 16000 75TH PL W
Project: FLOREZ- DEMO RETAINING WALL IN ESLHA **COD**
In response to the Plan review comments:
• We have submitted a plan highlighting the demolition area.
• The construction/landscape/site restoration plan has been updated to include the
recommendations from the Geotechnical Associates. We will retain Nelson Geotechnical
Associates to supervise the removal of the lower yard stairs and the retaining wall. As
well as to advise us in any maintenance of the area post demolition.
• We will Install and maintain all TESC measures according to approved plans, City of
Edmonds standard details, and all other measures that may be required during the course
of the project.
REFER TO CITY OF EDMONDS STANDARD DETAILS (ER-900) SERIES.
EROSION CONTROL MEASURES TO BE INSTALLED AND MAINTAINED
THROUGHOUT DEMOLITION AND UNTIL SITE IS PERMANENTLY RESTORED.
DATE: 7/2/2021
TO: ERIC CARTER
FROM: JORGE A FLOREZ
Owner
RE: Plan Check: BLD2020-0623
Project Address: 16000 75TH PL W
Project: FLOREZ- DEMO RETAINING WALL IN ESLHA **COD**
In response to the Plan review comments:
• The stairs and retaining wall will be demolished. We have applied to obtain a permit to
maintain the additional structures, patio, stairs, pond and shed, in the property
(Application 987143). These were addressed in the memorandum of the Geotech report
attached.
• The construction/landscape/site restoration plan has been updated to include the
recommendations from the Geotechnical Associates.
• Site plan with demolition area highlighted map attached.
• We will retain Nelson Geotechnical Associates to supervise the removal of the lower
yard stairs and the retaining wall. As well as to advise us in any maintenance of the area
post demolition.
®� F. CAUTIONI
ENGINEERING DIVISION CALL BEFORE YOU DIBI 1
APPROVED AS NOTED .-
�r .�.- C�� o a�
�i� 7/12/2021 W1-800-424-5656 811 ' i
OWNER/CONTRACTOR IS RESPONSIBLE FOR BNSF FIBER: 1-800-633-2891 i
EROSION CONTROL AND DRAINAGE BNSF SIDNAL: 1-800-832-6462
1` Improvements in clouded area to I
be under separate permit. �I
VJ Q for +D
MSADONDAtE BEAON I
YOL 6. PG 09
FL%AEfN!',EDN g,% i/ S` VX6-e.J r47ILI
. W I
' � ea•aSo+' p / y
:Jza
All encroaghment in the 3NSF OW must be I
removed. Final 9radedf5lope/Inust be
stabilized lby plantings and a oslon control
N.
Imeasures as p'etailed/on paes 7 and 8 of the
February �7r 2021 Welson'Geotechnical Report
APPROVED BY PLA I CITY OF EDMONDS