Loading...
APPROVED ENG-SITE DEVELOPMENT PLAN-REVISION 1-122721PIPE USE SIZE AND MATERIAL EDMONDS ZONING RS-12 WATER - 1 1/2" 20OPSI POLY 25MAX HEIGHT SEWER - 6" SEWER PIPE 35% MAX IMPERVIOUS STORM \ FOOTING DRAINS - 4" SCH 40 PVC LOT SIZE: 12,034 S.F. TIGHTLINES / IMPERVIOUS BUILDINGS - 2,928 (24.3%) N W.P. DECK - 225 (1.9%) IF RIM TO INVERT DRIVE - 1,566 (13.0%) ELEVATION EXCEEDS WALK - 254 (2.6%) 5', TYPE II MANHOLE TOTAL - 4,973 (41.3%) WILL BE REQUIRED. EXISTING WATER METER STUB FOR LOT 2 24' UTILITY EASEMENT THROUGH LOT 3 TO PROPERTY LINE OF LOT 2 00 1 1/2" WATER SUPPLY CABLE/DATA MIN 1.5' FROM ELECTRICAL MIN 3' FROM G' STORM LINE CB1 - DIVER= 1" WATER METER IN CITY R.O.W. WITH" / METER ATTACHED TO PROPERTY LINE If LINE TO HOUSE TO BE 200 PSI POLY WITH TRACER WIRE * STORM WATER TIGHT LINE AND FOOTING DRAINS DIRECTED TO STORM WATER STUB FOR LOT 3 INSTEAD OF ACROSS LOT 2. CB #4 0 INV 100.0' r, RIM 103.0' SILT FENCE ------TO YARD DRAIN 3 ON 3 CB YARD DRAIN INV 102.5 TOP 103.5 ELEC. METER SCO 6" CLEANOUT BETWEEN BENDS Mh _ SIDE SEWER 20'�6"SS STUB ° / �. ` - / / d ° PA7 S=1 00% , � FILTRATION SOCK ON INV=98.76 / SD EX CB #2 TOP 101.9' INV 98.00-�, TORM LINE CB1 - T PRIVATE INGRESS, EGRESS & FTILITY EASEMENT THROUGH OT 3 PER SHORT PLAT .FN 201111145006 96' \8' SD EX CB #1 SSH #2 TOP 94.95' SEWER INV 87.80' STORM SEWER MANHOLE MANHOLE DATUM PT ON 8th AVE RIM TOP: 95.5 STORM WATER DETENTION WAIVER BY DON FIENE 07/17/2007 Refer to 05-05-2009 discharge directly into regional detention facility just West of site which discharges directly into Puget Sound. ACCEPTABLE TIGHTLINE MATERIAL: SDR 35 SCH 40 N-12 F810 HANCOR 22'-0" d ° _ 4 / ° 14.301� ° / / PROPOSED 1 51' S3" E wti4" GARAGE V / °/ oaeacE slag d Inaw• .......................... ........ OWL(NECR2 w i d SSCO CB#3 / 12' WIDE PAVER �i "5-108' TYPE 1 DRIVEWAY d 110.5 TOP 106.5 INV // 100' /102' 104' 106' S89° 51' 53"W 110' 112' 100' DRIVEWAY 30' DRIVEWAY ADU 25' DRIVEWAY SEWER (10' FROM W) GRADES 96-106 GRADES 106-108 GRADES 103.5-106 6" CLEANOUT AT P/L 11% SLOPE 7% SLOPE 10.5% SLOPE W/ 12" CAST IRON LAMPHOLE COVER WITH 1/2" HEXBOLTS INV 98.00 (102' FROM HOUSE IS 3.4% SLOPE) 114' MINIMUM OF T OF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER DRIVEABLE SURFACES AND 1' OF COVER UNDER LANDSCAPE AREAS. MAXIMUM DRIVEWAY SLOPE ALLOWED 14% ALL DISTURBED SOILS SHALL BE COMPOST AMENDED PER CITY OF EDMONDS STANDARD DETAIL SD-642 OR APPROVED EQUAL. SCALE 1 " = 20ft Thuesen Custom Homes 514 8th Ave N Edmonds, WA 425-772-9401 Eric Thuesen 102' 94.19' 104' 106' 108' 110' r. 112' O 114' PROPOSED / 41 c: STRUCTURE //i 116' / A, X if1 ti GAS / / METER / / 7-- J / 116' LOT 2 OF 3-LOT SHORT PLAT FREVISION 1 - ROVEMENTSFOR TURE ADU REFER ALSO TO SEPARATE SITE PLAN ENGINEERING DIVISION APPROVED AS NOTED 1 /07/2022 UTILITY WORK AND DRIVEWAY SLOPES RELATED TO CONSTRUCTION OF FUTURE ADU. LEGAL DESCRIPTION Section 24 Township 27 Range 03 Quarter NW - LOT 2 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SEl/4 NWl/4 z�xM11l1 i1T1� RS-12 EDMOND RS-12 LOT SIZE 12,034 S.F. REVISION Jan 07 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RESUB Jan 07 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BUILDINGS - 2,928 (24.3%) W.P. DECK - 225 (1.9%) DRIVE - I,566 (13.0%) WALK - 254 (2.6%) TOTAL - 41973 (41.3%) W O----II 7J O C/� w V � W � W � 00 H Lr) 11-26-2016 REVISED 12-23-2021 DRAINAGE UTILITY AND FINAL GRADING