Loading...
Special Inspection-signedRESUB Nov 06 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT �Tj LiJ� O I Fst- I %9r3 SPECIAL INSPECTION AND TESTING AGE MNT Permit #: BLD2020-0906 Project: Retaining Wall 7821 175" ST SW - — Prior to issuance of a permits this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. Bt1TICS AND IRKSPUl'+SIBIf,#'!ILS Special Igsaaction Film and Special: Inspectors: The Special Inspection firm of will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): Reinforced Concrete Bolting in Concrete Yrestressed Concrete Shotcrete _Structural Masonry _Structural Steel/Welding _Spray applied Fireproofing _Smoke Control Systems Lateral Wood X -Erosion Control. X=Grading/Soils X -Retaining Wall Installation X-Rotaiiii:sg Wa-11 f�iaillage —High Strength Bolting _ Retaining wall drainage is the entire drainage system including, but not limited to the outfall and dispersion. All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the ilispcctor and, 1040 Tian ark: g4alilicd- by C.+ 4catioii aiid C APC:t ience '10 t'ci'ld an Ilic work and testillig r.;gaiic d by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City, detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the L:IBUILDING DIVISION FKM\Special lnspectionslSpecial inspection DocumenN\202o-0906 Dauaili (UnsipW).66/25/2020 approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all patties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be ptuied Oi tjtl€ej wont t uvt t'nii lti�iil 8(iliitival i� give ji lfy LLB City ij€s#tee tuj'. Ruildine Department: The building department shall review any revisions and addenda The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. €Iwrlrr The project owner, or the architect or engineer acting as The owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this docurnew, may void this agreement and the Building Official's approval of the special inspector. In such a case; a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS al-0 cipiocf }rft aii€i ('ondifions of ibis �iS+r r, Owner: �rf Signatur f?� Date _0„ 12 •-2020 Contractor:/� ( Signature _ Date: _ �r :gels./i;rg: ���1 � !1% f of � ignaturc // Hate: - - - Special insp. Q Signature Date: 11- 0 6 - 20 7-O Special Insp. Agency C-5- e d k ACCEPTED FOR THE CITY OF EDMOINTDS BUILDING DIVISION By. Erit' C **,r- Date: 11-12 — 2 0 2 0 LABUR DING DIV1S1oN Fn lslspeeial hmpw ionslspxial Inspection Docnments12020-M6 Danaili (Unsigned).&0125/2020