Loading...
ENG2023-0494_Utility_Application_10.2.2023_10.19.47_AM_3815184RECEIVED Oct 09 2023 of EDA,1 "'VC. 1890 SECTION A CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT WATER AVAILABILITY APPLICATION Complete and submit this form through www.MyBuildingPermit.com. Submit as a new application using the following prompts: Application Type — Utilities, Activity Type — Utility Availability, Scope of Work — Water Main. Applicant Information Contact/Applicant Name S r Phone Number Jo& -- U 7t Email r,-/S ° ' Ci../C 6 Address 0•7 - w au City ' L-1A)6 State Zip Property Information Project Name lq4ARI Address /0_,-)- %AVE City _ .O + State W %a Zip y Parcel No. 1r)6)5 &&cr any 400 Does the property currently have water service? es (City of Edmonds water) ❑ No Describe project (number of buildings, number of units, number of stories per building): a� 570 y^ Vol -/-S 5 /d 3 y s /Ck- In what phase is the project? ❑ Design Review Building Permit [A)) Y' Cc V) S '4-1-Ue-4I 0P7 ❑ Preliminary Plat ❑ Rezone or Other Associated permit application number(s), if applicable: 65L D ,�V.), Q S' J 3 E I 'av'q ( --0.x l SECTION B :2 0 a 1 _ 0,;), Exemptions from Utility Availability Study: 1) Single-family residence; 2) Multi -family project of four units or less with combo water/fire lines; 3) Short plat subdivision (four single-family lots or less). Please check one of the following: A utility availability study IS NOT requested/required. The applicant certifies that this project is exempt from needing a study as described above and is not requesting a full utility availability study at this time. Please sign below and submit this form through www.MyBuildingPermit.com. A utility availability study IS requested/required for the project, and associated fees will be due. Please submit the complete application through www.MyBuildingPermit.com. APPLICANT SIGNATURE: 1% i /r"a,2Ak 1 DATE: ` r� L72 j APPLICANT PRINTED NAME: V/ll %Lir 14AR61 S Form Updated 3/28/2023