APPROVED BLD2024-0394+MECHANICAL PLANS+3.20.2024_2.38.32_PM+4146941ABBREVIATIONS GENERAL AD ACCESS DOOR AFF ABOVE FINISHED FLOOR AFC ABOVE FINISHED GRADE BHP BRAKE HORSEPOWER BOP BOTTOM OF PIPE BOT BOTTOM C/L CENTER LINE CLG CEILING CFM CUBIC FEET PER MINUTE CO CARBON MONOXIDE CO2 CARBON DIOXIDE CSR CURRENT SENSING RELAY DISCH DISCHARGE DN DOWN IDS DISCONNECT SWITCH; DOOR SWITCH (E) EXISTING EA EACH EC ELECTRICAL CONTRACTOR; END CAP EP ELECTRICAL PANEL; END PLUG EPO EMERGENCY POWER OFF ESP EXTERNAL STATIC PRESSURE (F) FUTURE FA FIRE ALARM FDC FIRE DEPARTMENT CONNECTION FDN FOUNDATION FLEX FLEXIBLE FLR FLOOR FP FIRE PROTECTION FTG FOOTING GA GAGE GALV GALVANIZED GC GENERAL CONTRACTOR HP HORSEPOWER; HIGH PRESSURE HTG HEATING HTR HEATER IAW IN ACCORDANCE WITH ID INSIDE DIAMETER/DIMENSION IN WC INCHES WATER COLUMN MC MECHANICAL CONTRACTOR MFR MANUFACTURER MH MANHOLE MTD MOUNTED N/A NOT APPLICABLE NC NORMALLY CLOSED NIC NOT IN CONTRACT NO NORMALLY OPEN; NUMBER NOM NOMINAL NTS NOT TO SCALE OC ON CENTER OD OUTSIDE DIAMETER OVHD OVERHEAD PERF PERFORATED POC POINT OF CONNECTION QTY QUANTITY (R) RELOCATED RCP REFLECTED CEILING PLAN REQD REQUIRED SECT SECTION SIM SIMILAR SPEC SPECIFICATION STD STANDARD TBD TO BE DETERMINED TI TENANTIMPROVEMENTS TOC TOP OF CONCRETE TOS TOP OF STEEL TSP TOTAL STATIC PRESSURE TYP TYPICAL UG UNDERGROUND UNO UNLESS NOTED OTHERWISE VFD VARIABLE FREQUENCY DRIVE VSD VARIABLE SPEED DRIVE W/ WITH W/o WITHOUT WC WATER COLUMN WG WATER GAUGE HVAC AC AHU e10 CC CRU CT CV DB DIFF DMPR EA EAT ECG EF FCU FD FM FP FSD FTU GRD HC HVAC LAT LD MA MOD MAU MUA OA OBD RA RAT RTU SA SAT SD SF SL SLSM SM SO SP TG TOD VAV VD PIPING BD BP CA CHWR CHWS CLPS CNDS CNDWR CNDWS DRAIN DTR DTS FCD FEED FOF FOR FOS FOV G 2# G 5# G GE GFWR GFWS GWR GWS HPC HPS HWR HWS LPC LPG LPS LWT MPC MPS PCW PCWR PCWS PHW PHWR RL RS RV SCW SRV TOP AIR CONDITIONING AIR HANDLING UNIT BACKDRAFT DAMPER BOTTOM OF DUCT COOLING COIL COMPUTER ROOM UNIT COOLING TOWER CONSTANT VOLUME DUCT BOARD DIFFUSER DAMPER EXHAUST AIR ENTERING AIR TEMPERATURE EGGCRATE GRILLE EXHAUSTFAN FAN COIL UNIT FIRE DAMPER FREQUENCY MODULATION FIRE PROTECTION; FAN POWERED COMBINATION FIRE/SMOKE DAMPER FAN TERMINAL UNIT GRILLE, REGISTER, DIFFUSER HEATING COIL HEATING, VENTILATION AND AIR CONDITIONING LEAVING AIR TEMPERATURE LINEAR DIFFUSER MIXED AIR MOTOR OPERATED DAMPER; MODULATING MAKE-UP AIR UNIT MAKE-UP AIR OUTSIDE AIR OPPOSED BLADE DAMPER RETURN AIR RETURN AIR TEMPERATURE ROOF TOP UNIT SUPPLY AIR SUPPLY AIR TEMPERATURE SMOKE DAMPER; SMOKE DETECTOR SUPPLY FAN SOUND LINED SOUND LINED SHEET METAL SHEET METAL SCREENED OPENING STATIC PRESSURE TRANSFER GRILLE TOP OF DUCT VARIABLE AIR VOLUME VOLUME DAMPER STEAM BLOWDOWN BACKFLOW PREVENTER COMPRESSED AIR CHILLED WATER RETURN CHILLED WATER SUPPLY CLEAN LOW PRESSURE STEAM CONDENSATE CONDENSER WATER RETURN CONDENSER WATER SUPPLY TANK OVERFLOW & DRAINS DUAL TEMPERATURE RETURN DUAL TEMPERATURE SUPPLY FLUE CONDENSATE DRAIN BOILER FEED WATER FUEL OIL FILL FUEL OIL RETURN FUEL OIL SUPPLY FUEL OIL VENT NATURAL GAS NATURAL GAS - LOW PRESSURE, 2 PSI NATURAL GAS - LOW PRESSURE, 5 PSI GENERATOR EXHAUST GEO FIELD WATER RETURN GEO FIELD WATER SUPPLY GROUND WATER RETURN GROUND WATER SUPPLY HIGH PRESSURE CONDENSATE HIGH PRESSURE STEAM HEATING WATER RETURN HEATING WATER SUPPLY LOW PRESSURE CONDENSATE LIQUEFIED PROPANE GAS LOW PRESSURE STEAM LEAVING WATER TEMPERATURE MEDIUM PRESSURE CONDENSATE MEDIUM PRESSURE STEAM PROCESS COLD WATER PROCESS COOLING WATER RETURN PROCESS COOLING WATER SUPPLY PROCESS HOT WATER PROCESS HOT WATER RETURN REFRIGERATION LIQUID REFRIGERATION SUCTION REFRIGERATION VENT SOFTENED COLD WATER STEAM RELIEF VENT TOP OF PIPE DUCTWORK ACCESSORIES FE:3 [--Tn M FM E�n 0 � FD FD ETS 71 FSD 7 FSD AD AD 12x12 XSL R PROJECT SPECIFIC SUPPLY GRILLE RETURN OR EXHAUST GRILLE VOLUME DAMPER MOTOR OPERATED DAMPER AIRFLOW MONITOR REMOTELY OPERATED VOLUME DAMPER (YOUNG REGULATOR OR APPROVED) BACK DRAFT DAMPER COORDINATE WITH CEILING APPURTENANCES. FLEX CONNECTION FIRE DAMPER THROUGH WALL FIRE DAMPER THROUGH FLOOR FIRE/SMOKE DAMPER THROUGH WALL FIRE/SMOKE DAMPER THROUGH FLOOR ACCESS DOORS ACOUSTICALLY LINED DUCT (X" THICK SOUND LINING) CHANGE OF ELEVATION RISE(R) DROP(D) TURNING VANES RETURN / EXHAUST / OUTSIDE AIR SUPPLY / TRANSFER AIR DUCTWORK RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT I � i RECTANGULAR DUCT >� RECTANGULAR DUCT i ROUND DUCT 7� ROUND DUCT ( x ROUND DUCT ROUND DUCT i ROUND DUCT 0 ROUND DUCT cry OVAL DUCT L__2 OVAL DUCT �X SUPPLY AIR DUCT TURNING UP OR TOWARD SUPPLY AIR DUCT TURNING DOWN OR AWAY RETURN AIR DUCT TURNING UP OR TOWARD RETURN AIR DUCT TURNING DOWN OR AWAY EXHAUST AIR DUCT TURNING UP OR TOWARD EXHAUST AIR DUCT TURNING DOWN OR AWAY SUPPLY AIR DUCT TURNING UP OR TOWARD SUPPLY AIR DUCT TURNING DOWN OR AWAY RETURN AIR DUCT TURNING UP OR TOWARD RETURN AIR DUCT TURNING DOWN OR AWAY EXHUAST AIR DUCT TURNING UP OR TOWARD EXHAUST AIR DUCT TURNING DOWN OR AWAY SUPPLY AIR DUCT TURNING UP OR TOWARD SUPPLY AIR DUCT TURNING DOWN OR AWAY FLEXIBLE DUCT GRILLE/REGISTER/DIFFUSER GENERAL NOTES PROJECT SPECIFIC CEILING SUPPLY AIR DIFFUSER CEILING RETURN GRILLE OR TRANSFER AIR GRILLE CEILING EXHAUST GRILLE LINEAR DIFFUSER (CEILING) LINEAR DIFFUSER (WALL) 0 LOUVER PLAN VIEW LOUVER (ELEVATION VIEW) HVAC - ANNOTATION EQUIPMENT / LOUVER TAG EF - EQUIPMENT 2-1 DESIGNATION 1 CONSECUTIVE EQUIPUIPMENT # FLOOR OF EQUIP. LOCATION GRILLE, REGISTER, OR DIFFUSER TAG TYPE CODE WIDTH HEIGHT 1 CFM GENERAL INFORMATION SYMBOLS DEMOLITION NOTES 1. VERIFY LOCATIONS AND DIMENSIONS OF ALL EXISTING EQUIPMENT AND COORDINATE ALL WORK PRIOR TO START OF CONSTRUCTION. 2. OBTAIN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS NOT PREVIOUSLY COORDINATED OR AGREED UPON, I.E. ANCHOR BOLT DEPTHS, ETC. 3. CONCRETE EQUIPMENT CURBS, PIPING RAT SLABS, SUMP BASINS, AND HOUSEKEEPING PADS ARE SHOWN FOR APPROXIMATE LOCATION AND SIZE AND ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. WHERE PROVIDED, REFER TO STRUCTURAL INFO FOR ADDITIONAL DETAILS. 4. COMPLETION AND COMMISSIONING FOR MECHANICAL SYSTEMS: A. PROVIDE TO THE OWNER ALL NECESSARY SYSTEMS DOCUMENTATION (PER 2018 SEATTLE ENERGY CODE SECTION C408.1.3) B. BALANCE ALL HVAC SYSTEMS AND PROVIDE TO THE OWNER A WRITTEN BALANCING REPORT ( 2). C. SYSTEMS/EQUIPMENT/CONTROLS FUNCTIONAL TESTING SHALL BE PERFORMED IN ACCORDANCE WITH APPROVED PLANS (PER 208c€ATTLE E=NERr_v rnnESECTION C408). D. PERFORMANCE OF ALL NEW BUILDING MECHANICAL SYSTEMS WILL COMPLY WITH OR EXCEED THE MINIMUM REQUIREMENTS AS SET FORTH IN THE 2618 SEATTLE E SUFPi rnerniT TO THE 2i WASHINGTON STATE ENERGY CODE SECTION C403 - MECHANICAL SYSTEMS. E. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER PER SEC C103.6.1. F. PROVIDE EQUPMENT MAINTENANCE INFORMATION AND MAINTENANCE MANUALS FOR ALL MECHANICAL EQUIPMENT, SEC C103.6.2. G. PROVIDE NECESSARY SEC COMPLIANCE FORMS AND CALCULATIONS, SEC C103.6.3. H. PROVIDE OWNERS OPERATING PERSONNEL TRAINING FOR MECHANICAL EQUIPMENT, WSEC C103.6.4. 5. MINIMUM VENTILATION QUANTITIES WILL COMPLY WITH OR EXCEED THE 2018 SEATT69 N19GH Mlrol rnnG. 6. ALL MOTORS WILL COMPLY WITH THE 2018 SEATTLE ENERG CODE SECTION C405.8. FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING SET. 7. ALL SYSTEMS WILL BE INSULATED AS PRESCRIBED IN SECTIONS C403.10.1, C403.10.3 AND TABLE C403.10.3 OF THE E. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET. 8. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF EQUIPMENT FURNISHED BY THE OWNER OR OTHERS. 9. FOR ADDITIONAL SYSTEM AND EQUIPMENT SEISMIC REQUIREMENTS, REFER TO STRUCTURAL INFORMATION (WHERE PROVIDED) AND PROJECT SPECIFIC SEISMIC DESIGN INFORMATION SHEET CONTAINED WITHIN THIS DRAWING SET. 10. REFER TO CIVIL DRAWINGS FOR UTILITY WORK 5-0" BEYOND THE BUILDING LINE. 11. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS SPECIFCIALLY MARKED AS EXISTING, EXISTING TO REMAIN, EXIST., OR (E). NEW MECHANICAL WORK FUTURE TI SCOPE & NEW WORK OTHER THAN MECHANICAL POINT OF CONNECTION POINT OF DEMOLITION CENTERLINE KEY NOTE REFERENCE PIPING RISER CALLOUT (CHW; HW) PIPING RISER # PLAN NUMBER SHEET NUMBER WHERE PLAN SHOWN DETAIL OR DIAGRAM NUMBER SHEET NUMBER WHERE DETAIL/DIAGRAM SHOWN SECTION LETTER SHEET NUMBER WHERE SECTION SHOWN REVISION NUMBER - DENOTES NUMBER AND DATE WHEN REVISION OR ISSUE OCCURED REVISION CLOUD - DENOTES AREA OF CHANGE DETAIL REFERENCE OUTLINE WITH NUMBER AND SHEET LOCATION 1. DEMOLITION DRAWINGS ARE INCLUDED TO GIVE A COMMON BASIS FOR BIDDING AND MAY NOT SHOW EVERY ITEM TO BE DEMOLISHED. VISIT SITE TO DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION TO FACEPLATE WORK INDICATED BY THE CONTRACT DOCUMENTS. REWORK EXISTING TERMINATIONS, CONNECTIONS, ETC., TO ACCEPT NEW WORK. PRIOR TO START OF ANY DEMO WORK, VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR RESOLUTION. 2. REMOVE EXISTING HVAC EQUIPMENT AS INDICATED, INCLUDING ASSOCIATED PIPING, CONTROL SYSTEMS, AND APPURTENANCES. 3. REMOVE EXISTING DUCTWORK AS INDICATED. CAP EXISTING OPENINGS NOT BEING REUSED. 4. REMOVE EXISTING PIPING SERVING ITEMS TO BE REMOVED. CAP OR PLUG BRANCH LINES NOT BEING REUSED. 5. GIVE OWNER THE OPPORTUNITY TO RETAIN ANY REMOVED ITEMS THAT ARE NOT BEING REUSED. DISPOSE OF OTHER ITEMS LEGALLY. 6. CLEAN AND REFURBISH ITEMS INDICATED TO BE REMOVED AND REUSED PRIOR TO REUSE. MECHANICAL INDEX SHEET NO. SHEET NAME M-001 MECHANICAL LEGEND, MAP, B.O.D. & ABBREVIATIONS M-401 FIRST FLOOR HVAC PLAN VICINITY MAP , ; T MM _&GAIAW000 + cg&Q0 F1 I e F 'I-r, F r F HVAC BASIS OF DESIGN ITEM # I SYSTEM CRITERIA CRITERIA SOURCE CODE BASIS FOR PROJECT 1-1 CODE 018 WASHINGTON STATE MECHANICAL CODE CITY OF EDMONDS 1-2 CODE 2 18 WASHINGTON STATE ENERGY CODE CITY OF EDMONDS 1-3 CODE 201 WASHINGTON STATE BUILDING CODE CITY OF EDMONDS 1-3 STANDARD 2021 ASHRAE 170 - VENTILATION OF HEALTHCARE FACILITIES DEPARTMENT OF HEALTH BASIS FOR SCOPE OF WORK 2-1 AIRFLOW REQUIREMENTS TABLE 8-1 DESIGN PARAMETERS - SPECIALIZED OUTPATIENT SPACES CLEAN ROOM POSITIVE PRESSURIZATION - 2 OA ACH, 4 MIN ACH SOILED UTILITY NEGATIVE PRESSURIZATION - 2 OA ACH, 6 MIN ACH 2021 ASHRAE 170 2-2 SCOPE OF WORK - CLEAN ROOM RELOCATION OF FIRE DAMPER AND TRANSFER DUCT ASSEMBLY FROM LOW WALL TO ABOVE CEILING - SOILED UTILITY DEMO EXHAUST GRILLE AND CAP EXHAUST DUCT DESIGN APPROACH 2-3 DESIGN INTENT REVISE ROOM AIRFLOWS TO ALLOW FOR PROPER PRESSURIZATION ACCORDING TO SPACE USAGE DESIGN APPROACH 2-4 TEST & BALANCE - REVISE AIRFLOWS AS REQUIRED TO MEET SPACE PRESSURIZATION NEEDS - EXISTING PRESSURIZATION OF ADJACENT SPACES TO REMAIN THE SAME POSITIVE, NEGATNE, OR NEUTRAL PRESSURIZATION DESIGN APPROACH This project shall comply with 2021 ICC codes Fire Damper specs to be on site at the time of rough in inspection. ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE City Of Edmonds Building Department Work MECHANICAL Address 21600 HIGHWAY 99 Owner KRUGER CLINIC Approved Date 04/04/2024 Building Official Erl,& Permit Number BLD2024-0394 APPROVED PLANS MUST BE ON JOB SITE wry of Your mil i99 MCKINSTRY CO. SEATTLE: 5005 3RD AVE SW SEATTLE, WA 98134 206- 762- 3311 www.mckinstry.com PROJECT: SWEDISH KRUGER CLINIC - PRESSURIZATION 21600 HWY 99 EDMONDS, WA 98026 CONSULTANTS: REGISTRATION: THIS IS AN ELECTRONIC SIGNATURE. DIGITAL STAMP ORIGINAL ON FILE AT MCKINSTRY. ISSUES NO DATE DESCRIPTION 1 2/9/24 MECHANICAL PERMIT SET DESIGNED: S. DAVENBERRY DRAWN: B. MCLEOD CHECKED: D. MA JOB NO: 208321 SHEET TITLE: MECHANICAL LEGEND, MAP, B.O.D. & ABBREVIATIONS SHEET NUMBER: MM001 RECEIVED Mar 21 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Room Required As -Found Adjusted ASHRAE Required As -Found As -Adjusted Room Volume Pressure Pressure Pressure 170 ACH CFM for ACH CFM CFM Clean Rm 2235 +0.01 -0.012 NA 4 149 280 NA Soil 648 -0. 01 +0. 006 +0. 003 6 65 55 55 � PRE -CONSTRUCTION TEST &BALANCE AIRFLOWS M-401 ',IDOR 3 SF 18x10 UP- 24x10,& UP— FD swG 1-HRJ 0CFM FC, Q 11 _,-18x10 OF ROOM SUITE 140 1,487 SF EAG EXAM # 10 N V_2�1 CF E 185 C STAIR 1 SAG 113 SF 26x14 UP 2 0CFM CLEAN ROOM - IN 1 C. EAG T 0 CFM � M-IN LOBBY z NE'UTR; L 2 CLEAN M-401 SCALE: 1/8" = 1'-0'' 168 SF / EDAM #8 26x114 UP B— ROOM - FIRST FLOOR HVAC DEMO PLAN D i LAM ff d VN 26x14 UP z IR7I 0 SAG 60 CFM -4 SOILED UTILITY -FIRST FLOOR HVAC DEMO PLAN M-401 SCALE: 1/8" = 1'-0" Fire Damper specs to be on site at the time of rough in inspection. GENERAL NOTES: 1. NEW AND DEMO WORK SHOWN IN RED. 2. ADJACENT SPACES TO THE CLEAN ROOM AND SOILED UTILITY TO RETAIN EXISTING PRESSURIZATION IN BLACK. KEYNOTES 1 A REMOVE LOW TRANSFER GRILLE AND FIRE DAMPER ASSEMBLY FOR RELOCATION. PATCH 1-HR FIRE RATED WALL. RELOCATE ASSEMBLY ABOVE THE CEILING. 2 REBALANCE EXISTING TO MEET PRESSURIZATION REQUIREMENTS. C MOR SUITE 140 24x12 3 SF 18x10 UP 18x10 1,487 SF _ 24x 10 � UP EAG � J D s EXAM 10 NEUTRAL 1 HR 1 IN ROOM RA z STAIR 2 125 C1 M 168 SF SAG C 5 CF � �STAIR 1 SAG 18 Ql 3 SF 6x14 UP C2) 280CFM + I w I CLEAN ROOM EDAM 8 ® 26x14 UP EAGT z 0 CFM EB-3 M - IN W.C. �Ea NEUTRAL LOBBY flll � 3 CLEAN M-401 SCALE: 1 /8" = 1'-0" ROOM - FIRST FLOOR NEW HVAC PLAN D II L�xAl M ff b VN `CAM �Y 26x14 UP z EB-3 0 I I EXAM #6 Q EXAM 4 I Ict 11IE.12 0 ME ICAL DIR CT I EXAM 7 ­70 EXAM 5 PROV. WORK z ROOM N II 2 EAG 75 CF UTILI SAG FZ0 60 CFM - IN W. . u x � CAP i2 N C' Q EXAM EAG SSG 105 CFM 230 CFM ® 0 EXAM 3 30 SA 230 SA 230 SA F 5 ] SOILED UTILITY -FIRST FLOOR NEW HVAC PLAN M-401 SCALE: 1/8" = 1'-0" istry ff rAwr W11009 MCKINSTRY CO. SEATTLE: 5005 3RD AVE SW SEATTLE, WA 98134 206— 762— 3311 www.mckinstry.com PROJECT: SWEDISH KRUGER CLINIC - PRESSURIZATION 21600 HWY 99 EDMONDS, WA 98026 CONSULTANTS: REGISTRATION: \ P� L) �r OQ�`` of ti �Q O N Z 1� 3999 P01 T ERF'�G��� SS/ONAI Ea THIS IS AN ELECTRONIC SIGNATURE. DIGITAL STAMP ORIGINAL ON FILE AT MCKINSTRY. ISSUES: NO DATE DESCRIPTION 1 2/9/24 MECHANICAL PERMIT SET DESIGNED: S. DAVENBERRY DRAWN: B. MCLEOD CHECKED: D. MA JOB NO: 208321 SHEET TITLE: FIRST FLOOR HVAC PLAN SHEET NUMBER: RECEIVED Mm401 Mar 21 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT