APPROVED BLD2024-0394+MECHANICAL PLANS+3.20.2024_2.38.32_PM+4146941ABBREVIATIONS
GENERAL
AD
ACCESS DOOR
AFF
ABOVE FINISHED FLOOR
AFC
ABOVE FINISHED GRADE
BHP
BRAKE HORSEPOWER
BOP
BOTTOM OF PIPE
BOT
BOTTOM
C/L
CENTER LINE
CLG
CEILING
CFM
CUBIC FEET PER MINUTE
CO
CARBON MONOXIDE
CO2
CARBON DIOXIDE
CSR
CURRENT SENSING RELAY
DISCH
DISCHARGE
DN
DOWN
IDS
DISCONNECT SWITCH; DOOR SWITCH
(E)
EXISTING
EA
EACH
EC
ELECTRICAL CONTRACTOR; END CAP
EP
ELECTRICAL PANEL; END PLUG
EPO
EMERGENCY POWER OFF
ESP
EXTERNAL STATIC PRESSURE
(F)
FUTURE
FA
FIRE ALARM
FDC
FIRE DEPARTMENT CONNECTION
FDN
FOUNDATION
FLEX
FLEXIBLE
FLR
FLOOR
FP
FIRE PROTECTION
FTG
FOOTING
GA
GAGE
GALV
GALVANIZED
GC
GENERAL CONTRACTOR
HP
HORSEPOWER; HIGH PRESSURE
HTG
HEATING
HTR
HEATER
IAW IN ACCORDANCE WITH
ID INSIDE DIAMETER/DIMENSION
IN WC INCHES WATER COLUMN
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MH MANHOLE
MTD MOUNTED
N/A
NOT APPLICABLE
NC
NORMALLY CLOSED
NIC
NOT IN CONTRACT
NO
NORMALLY OPEN; NUMBER
NOM
NOMINAL
NTS
NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OVHD OVERHEAD
PERF
PERFORATED
POC
POINT OF CONNECTION
QTY
QUANTITY
(R)
RELOCATED
RCP
REFLECTED CEILING PLAN
REQD
REQUIRED
SECT
SECTION
SIM
SIMILAR
SPEC
SPECIFICATION
STD
STANDARD
TBD
TO BE DETERMINED
TI
TENANTIMPROVEMENTS
TOC
TOP OF CONCRETE
TOS
TOP OF STEEL
TSP
TOTAL STATIC PRESSURE
TYP
TYPICAL
UG
UNDERGROUND
UNO
UNLESS NOTED OTHERWISE
VFD
VARIABLE FREQUENCY DRIVE
VSD
VARIABLE SPEED DRIVE
W/
WITH
W/o
WITHOUT
WC
WATER COLUMN
WG
WATER GAUGE
HVAC
AC
AHU
e10
CC
CRU
CT
CV
DB
DIFF
DMPR
EA
EAT
ECG
EF
FCU
FD
FM
FP
FSD
FTU
GRD
HC
HVAC
LAT
LD
MA
MOD
MAU
MUA
OA
OBD
RA
RAT
RTU
SA
SAT
SD
SF
SL
SLSM
SM
SO
SP
TG
TOD
VAV
VD
PIPING
BD
BP
CA
CHWR
CHWS
CLPS
CNDS
CNDWR
CNDWS
DRAIN
DTR
DTS
FCD
FEED
FOF
FOR
FOS
FOV
G
2# G
5# G
GE
GFWR
GFWS
GWR
GWS
HPC
HPS
HWR
HWS
LPC
LPG
LPS
LWT
MPC
MPS
PCW
PCWR
PCWS
PHW
PHWR
RL
RS
RV
SCW
SRV
TOP
AIR CONDITIONING
AIR HANDLING UNIT
BACKDRAFT DAMPER
BOTTOM OF DUCT
COOLING COIL
COMPUTER ROOM UNIT
COOLING TOWER
CONSTANT VOLUME
DUCT BOARD
DIFFUSER
DAMPER
EXHAUST AIR
ENTERING AIR TEMPERATURE
EGGCRATE GRILLE
EXHAUSTFAN
FAN COIL UNIT
FIRE DAMPER
FREQUENCY MODULATION
FIRE PROTECTION; FAN POWERED
COMBINATION FIRE/SMOKE DAMPER
FAN TERMINAL UNIT
GRILLE, REGISTER, DIFFUSER
HEATING COIL
HEATING, VENTILATION AND AIR CONDITIONING
LEAVING AIR TEMPERATURE
LINEAR DIFFUSER
MIXED AIR
MOTOR OPERATED DAMPER; MODULATING
MAKE-UP AIR UNIT
MAKE-UP AIR
OUTSIDE AIR
OPPOSED BLADE DAMPER
RETURN AIR
RETURN AIR TEMPERATURE
ROOF TOP UNIT
SUPPLY AIR
SUPPLY AIR TEMPERATURE
SMOKE DAMPER; SMOKE DETECTOR
SUPPLY FAN
SOUND LINED
SOUND LINED SHEET METAL
SHEET METAL
SCREENED OPENING
STATIC PRESSURE
TRANSFER GRILLE
TOP OF DUCT
VARIABLE AIR VOLUME
VOLUME DAMPER
STEAM BLOWDOWN
BACKFLOW PREVENTER
COMPRESSED AIR
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CLEAN LOW PRESSURE STEAM
CONDENSATE
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
TANK OVERFLOW & DRAINS
DUAL TEMPERATURE RETURN
DUAL TEMPERATURE SUPPLY
FLUE CONDENSATE DRAIN
BOILER FEED WATER
FUEL OIL FILL
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL VENT
NATURAL GAS
NATURAL GAS - LOW PRESSURE, 2 PSI
NATURAL GAS - LOW PRESSURE, 5 PSI
GENERATOR EXHAUST
GEO FIELD WATER RETURN
GEO FIELD WATER SUPPLY
GROUND WATER RETURN
GROUND WATER SUPPLY
HIGH PRESSURE CONDENSATE
HIGH PRESSURE STEAM
HEATING WATER RETURN
HEATING WATER SUPPLY
LOW PRESSURE CONDENSATE
LIQUEFIED PROPANE GAS
LOW PRESSURE STEAM
LEAVING WATER TEMPERATURE
MEDIUM PRESSURE CONDENSATE
MEDIUM PRESSURE STEAM
PROCESS COLD WATER
PROCESS COOLING WATER RETURN
PROCESS COOLING WATER SUPPLY
PROCESS HOT WATER
PROCESS HOT WATER RETURN
REFRIGERATION LIQUID
REFRIGERATION SUCTION
REFRIGERATION VENT
SOFTENED COLD WATER
STEAM RELIEF VENT
TOP OF PIPE
DUCTWORK ACCESSORIES
FE:3
[--Tn
M
FM
E�n
0
� FD FD
ETS
71
FSD 7 FSD
AD
AD
12x12 XSL
R
PROJECT SPECIFIC
SUPPLY GRILLE
RETURN OR EXHAUST GRILLE
VOLUME DAMPER
MOTOR OPERATED DAMPER
AIRFLOW MONITOR
REMOTELY OPERATED VOLUME DAMPER
(YOUNG REGULATOR OR APPROVED)
BACK DRAFT DAMPER
COORDINATE WITH CEILING APPURTENANCES.
FLEX CONNECTION
FIRE DAMPER THROUGH WALL
FIRE DAMPER THROUGH FLOOR
FIRE/SMOKE DAMPER THROUGH WALL
FIRE/SMOKE DAMPER THROUGH FLOOR
ACCESS DOORS
ACOUSTICALLY LINED DUCT (X" THICK
SOUND LINING)
CHANGE OF ELEVATION RISE(R) DROP(D)
TURNING VANES
RETURN / EXHAUST / OUTSIDE AIR
SUPPLY / TRANSFER AIR
DUCTWORK
RECTANGULAR DUCT
RECTANGULAR DUCT
RECTANGULAR DUCT
RECTANGULAR DUCT
I �
i
RECTANGULAR DUCT
>�
RECTANGULAR DUCT
i
ROUND DUCT
7�
ROUND DUCT
( x
ROUND DUCT
ROUND DUCT
i
ROUND DUCT
0
ROUND DUCT
cry
OVAL DUCT
L__2
OVAL DUCT
�X
SUPPLY AIR DUCT
TURNING UP OR TOWARD
SUPPLY AIR DUCT
TURNING DOWN OR AWAY
RETURN AIR DUCT
TURNING UP OR TOWARD
RETURN AIR DUCT
TURNING DOWN OR AWAY
EXHAUST AIR DUCT
TURNING UP OR TOWARD
EXHAUST AIR DUCT
TURNING DOWN OR AWAY
SUPPLY AIR DUCT
TURNING UP OR TOWARD
SUPPLY AIR DUCT
TURNING DOWN OR
AWAY
RETURN AIR DUCT
TURNING UP OR TOWARD
RETURN AIR DUCT
TURNING DOWN OR
AWAY
EXHUAST AIR DUCT
TURNING UP OR TOWARD
EXHAUST AIR DUCT
TURNING DOWN OR
AWAY
SUPPLY AIR DUCT
TURNING UP OR TOWARD
SUPPLY AIR DUCT
TURNING DOWN OR AWAY
FLEXIBLE DUCT
GRILLE/REGISTER/DIFFUSER GENERAL NOTES
PROJECT SPECIFIC
CEILING SUPPLY AIR DIFFUSER
CEILING RETURN GRILLE
OR TRANSFER AIR GRILLE
CEILING EXHAUST GRILLE
LINEAR DIFFUSER (CEILING)
LINEAR DIFFUSER (WALL)
0
LOUVER PLAN VIEW
LOUVER (ELEVATION VIEW)
HVAC
- ANNOTATION
EQUIPMENT / LOUVER TAG
EF - EQUIPMENT
2-1 DESIGNATION
1 CONSECUTIVE
EQUIPUIPMENT #
FLOOR OF EQUIP.
LOCATION
GRILLE, REGISTER, OR DIFFUSER TAG
TYPE CODE
WIDTH
HEIGHT
1 CFM
GENERAL INFORMATION SYMBOLS
DEMOLITION NOTES
1. VERIFY LOCATIONS AND DIMENSIONS OF ALL EXISTING EQUIPMENT AND COORDINATE ALL WORK PRIOR TO
START OF CONSTRUCTION.
2. OBTAIN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS NOT PREVIOUSLY
COORDINATED OR AGREED UPON, I.E. ANCHOR BOLT DEPTHS, ETC.
3. CONCRETE EQUIPMENT CURBS, PIPING RAT SLABS, SUMP BASINS, AND HOUSEKEEPING PADS ARE SHOWN FOR
APPROXIMATE LOCATION AND SIZE AND ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. WHERE
PROVIDED, REFER TO STRUCTURAL INFO FOR ADDITIONAL DETAILS.
4. COMPLETION AND COMMISSIONING FOR MECHANICAL SYSTEMS:
A. PROVIDE TO THE OWNER ALL NECESSARY SYSTEMS DOCUMENTATION (PER 2018 SEATTLE ENERGY
CODE SECTION C408.1.3)
B. BALANCE ALL HVAC SYSTEMS AND PROVIDE TO THE OWNER A WRITTEN BALANCING REPORT
( 2).
C. SYSTEMS/EQUIPMENT/CONTROLS FUNCTIONAL TESTING SHALL BE PERFORMED IN ACCORDANCE WITH
APPROVED PLANS (PER 208c€ATTLE E=NERr_v rnnESECTION C408).
D. PERFORMANCE OF ALL NEW BUILDING MECHANICAL SYSTEMS WILL COMPLY WITH OR EXCEED THE
MINIMUM REQUIREMENTS AS SET FORTH IN THE 2618 SEATTLE E SUFPi rnerniT TO THE 2i WASHINGTON
STATE ENERGY CODE SECTION C403 - MECHANICAL SYSTEMS.
E. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER PER SEC C103.6.1.
F. PROVIDE EQUPMENT MAINTENANCE INFORMATION AND MAINTENANCE MANUALS FOR ALL MECHANICAL
EQUIPMENT, SEC C103.6.2.
G. PROVIDE NECESSARY SEC COMPLIANCE FORMS AND CALCULATIONS, SEC C103.6.3.
H. PROVIDE OWNERS OPERATING PERSONNEL TRAINING FOR MECHANICAL EQUIPMENT, WSEC C103.6.4.
5. MINIMUM VENTILATION QUANTITIES WILL COMPLY WITH OR EXCEED THE 2018 SEATT69 N19GH Mlrol rnnG.
6. ALL MOTORS WILL COMPLY WITH THE 2018 SEATTLE ENERG CODE SECTION C405.8. FOR ADDITIONAL DETAILS,
SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING SET.
7. ALL SYSTEMS WILL BE INSULATED AS PRESCRIBED IN SECTIONS C403.10.1, C403.10.3 AND TABLE C403.10.3 OF
THE E. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING SPECIFICATION
MATRICES CONTAINED WITHIN THIS DRAWING SET.
8. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF EQUIPMENT
FURNISHED BY THE OWNER OR OTHERS.
9. FOR ADDITIONAL SYSTEM AND EQUIPMENT SEISMIC REQUIREMENTS, REFER TO STRUCTURAL INFORMATION
(WHERE PROVIDED) AND PROJECT SPECIFIC SEISMIC DESIGN INFORMATION SHEET CONTAINED WITHIN THIS
DRAWING SET.
10. REFER TO CIVIL DRAWINGS FOR UTILITY WORK 5-0" BEYOND THE BUILDING LINE.
11. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS SPECIFCIALLY MARKED AS
EXISTING, EXISTING TO REMAIN, EXIST., OR (E).
NEW MECHANICAL WORK
FUTURE TI SCOPE & NEW WORK OTHER THAN MECHANICAL
POINT OF CONNECTION
POINT OF DEMOLITION
CENTERLINE
KEY NOTE REFERENCE
PIPING RISER CALLOUT (CHW; HW)
PIPING RISER #
PLAN NUMBER
SHEET NUMBER WHERE PLAN SHOWN
DETAIL OR DIAGRAM NUMBER
SHEET NUMBER
WHERE DETAIL/DIAGRAM SHOWN
SECTION LETTER
SHEET NUMBER WHERE SECTION SHOWN
REVISION NUMBER - DENOTES NUMBER
AND DATE WHEN REVISION OR ISSUE
OCCURED
REVISION CLOUD - DENOTES AREA OF
CHANGE
DETAIL REFERENCE OUTLINE
WITH NUMBER AND SHEET LOCATION
1. DEMOLITION DRAWINGS ARE INCLUDED TO GIVE A COMMON BASIS FOR BIDDING AND MAY NOT SHOW
EVERY ITEM TO BE DEMOLISHED. VISIT SITE TO DETERMINE AND COORDINATE THE EXACT EXTENT OF
DEMOLITION TO FACEPLATE WORK INDICATED BY THE CONTRACT DOCUMENTS. REWORK EXISTING
TERMINATIONS, CONNECTIONS, ETC., TO ACCEPT NEW WORK. PRIOR TO START OF ANY DEMO WORK,
VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR RESOLUTION.
2. REMOVE EXISTING HVAC EQUIPMENT AS INDICATED, INCLUDING ASSOCIATED PIPING, CONTROL SYSTEMS,
AND APPURTENANCES.
3. REMOVE EXISTING DUCTWORK AS INDICATED. CAP EXISTING OPENINGS NOT BEING REUSED.
4. REMOVE EXISTING PIPING SERVING ITEMS TO BE REMOVED. CAP OR PLUG BRANCH LINES NOT BEING
REUSED.
5. GIVE OWNER THE OPPORTUNITY TO RETAIN ANY REMOVED ITEMS THAT ARE NOT BEING REUSED. DISPOSE
OF OTHER ITEMS LEGALLY.
6. CLEAN AND REFURBISH ITEMS INDICATED TO BE REMOVED AND REUSED PRIOR TO REUSE.
MECHANICAL INDEX
SHEET NO.
SHEET NAME
M-001
MECHANICAL LEGEND, MAP, B.O.D. & ABBREVIATIONS
M-401
FIRST FLOOR HVAC PLAN
VICINITY MAP
, ; T
MM _&GAIAW000 +
cg&Q0
F1 I e F 'I-r, F
r F
HVAC BASIS OF DESIGN
ITEM # I SYSTEM
CRITERIA
CRITERIA SOURCE
CODE BASIS FOR PROJECT
1-1
CODE
018 WASHINGTON STATE MECHANICAL CODE
CITY OF EDMONDS
1-2
CODE
2 18 WASHINGTON STATE ENERGY CODE
CITY OF EDMONDS
1-3
CODE
201 WASHINGTON STATE BUILDING CODE
CITY OF EDMONDS
1-3
STANDARD
2021 ASHRAE 170 - VENTILATION OF HEALTHCARE FACILITIES
DEPARTMENT OF HEALTH
BASIS FOR
SCOPE OF WORK
2-1
AIRFLOW REQUIREMENTS
TABLE 8-1 DESIGN PARAMETERS - SPECIALIZED OUTPATIENT SPACES
CLEAN ROOM POSITIVE PRESSURIZATION - 2 OA ACH, 4 MIN ACH
SOILED UTILITY NEGATIVE PRESSURIZATION - 2 OA ACH, 6 MIN ACH
2021 ASHRAE 170
2-2
SCOPE OF WORK
- CLEAN ROOM RELOCATION OF FIRE DAMPER AND TRANSFER DUCT ASSEMBLY FROM LOW
WALL TO ABOVE CEILING
- SOILED UTILITY DEMO EXHAUST GRILLE AND CAP EXHAUST DUCT
DESIGN APPROACH
2-3
DESIGN INTENT
REVISE ROOM AIRFLOWS TO ALLOW FOR PROPER PRESSURIZATION ACCORDING TO SPACE
USAGE
DESIGN APPROACH
2-4
TEST & BALANCE
- REVISE AIRFLOWS AS REQUIRED TO MEET SPACE PRESSURIZATION NEEDS
- EXISTING PRESSURIZATION OF ADJACENT SPACES TO REMAIN THE SAME POSITIVE, NEGATNE,
OR NEUTRAL PRESSURIZATION
DESIGN APPROACH
This project shall
comply with 2021
ICC codes
Fire Damper specs to be on
site at the time of rough in
inspection.
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
City Of Edmonds
Building Department
Work MECHANICAL
Address 21600 HIGHWAY 99
Owner KRUGER CLINIC
Approved Date 04/04/2024
Building Official Erl,&
Permit Number BLD2024-0394
APPROVED
PLANS MUST BE
ON JOB SITE
wry
of Your mil i99
MCKINSTRY CO.
SEATTLE:
5005 3RD AVE SW
SEATTLE, WA 98134
206- 762- 3311
www.mckinstry.com
PROJECT:
SWEDISH
KRUGER CLINIC -
PRESSURIZATION
21600 HWY 99
EDMONDS, WA 98026
CONSULTANTS:
REGISTRATION:
THIS IS AN ELECTRONIC SIGNATURE. DIGITAL
STAMP ORIGINAL ON FILE AT MCKINSTRY.
ISSUES
NO DATE DESCRIPTION
1 2/9/24 MECHANICAL PERMIT SET
DESIGNED: S. DAVENBERRY
DRAWN: B. MCLEOD
CHECKED: D. MA
JOB NO: 208321
SHEET TITLE:
MECHANICAL LEGEND,
MAP, B.O.D. &
ABBREVIATIONS
SHEET NUMBER:
MM001
RECEIVED
Mar 21 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Room
Required
As -Found
Adjusted ASHRAE Required As -Found As -Adjusted
Room
Volume
Pressure
Pressure
Pressure 170 ACH CFM for ACH CFM CFM
Clean Rm 2235
+0.01
-0.012
NA 4 149 280 NA
Soil 648
-0. 01
+0. 006
+0. 003 6 65 55 55
� PRE -CONSTRUCTION TEST &BALANCE AIRFLOWS
M-401
',IDOR
3 SF 18x10 UP-
24x10,& UP—
FD swG
1-HRJ 0CFM FC,
Q
11 _,-18x10
OF ROOM
SUITE 140
1,487 SF
EAG
EXAM # 10 N
V_2�1 CF E
185 C
STAIR 1 SAG
113 SF 26x14 UP 2 0CFM
CLEAN ROOM - IN 1 C.
EAG T
0 CFM �
M-IN
LOBBY z NE'UTR; L
2 CLEAN
M-401 SCALE: 1/8" = 1'-0''
168 SF
/ EDAM #8
26x114 UP
B—
ROOM - FIRST FLOOR HVAC DEMO PLAN
D
i
LAM ff d VN
26x14 UP
z IR7I
0
SAG
60 CFM
-4 SOILED UTILITY -FIRST FLOOR HVAC DEMO PLAN
M-401 SCALE: 1/8" = 1'-0"
Fire Damper specs to be on
site at the time of rough in
inspection.
GENERAL NOTES:
1. NEW AND DEMO WORK SHOWN IN RED.
2. ADJACENT SPACES TO THE CLEAN ROOM AND SOILED UTILITY TO RETAIN EXISTING
PRESSURIZATION IN BLACK.
KEYNOTES
1 A REMOVE LOW TRANSFER GRILLE AND FIRE DAMPER ASSEMBLY FOR RELOCATION. PATCH
1-HR FIRE RATED WALL. RELOCATE ASSEMBLY ABOVE THE CEILING.
2 REBALANCE EXISTING TO MEET PRESSURIZATION REQUIREMENTS.
C
MOR SUITE 140 24x12
3 SF 18x10 UP 18x10 1,487 SF _
24x 10 � UP EAG �
J
D s EXAM 10 NEUTRAL
1 HR 1 IN ROOM RA z STAIR 2
125 C1 M 168 SF
SAG C
5 CF �
�STAIR 1 SAG 18
Ql 3 SF 6x14 UP C2) 280CFM + I w
I CLEAN ROOM EDAM 8
® 26x14 UP
EAGT z
0 CFM EB-3
M - IN W.C.
�Ea
NEUTRAL
LOBBY
flll �
3 CLEAN
M-401 SCALE: 1 /8" = 1'-0"
ROOM - FIRST FLOOR NEW HVAC PLAN
D
II
L�xAl M ff b VN `CAM �Y
26x14 UP z
EB-3 0
I
I
EXAM #6 Q
EXAM 4
I
Ict
11IE.12
0
ME ICAL
DIR CT
I
EXAM 7
70
EXAM 5 PROV.
WORK
z
ROOM
N
II 2 EAG
75 CF
UTILI
SAG
FZ0 60 CFM
- IN W. .
u
x � CAP
i2
N
C' Q
EXAM EAG SSG
105 CFM 230 CFM
® 0 EXAM 3
30 SA 230 SA 230 SA F
5 ] SOILED UTILITY -FIRST FLOOR NEW HVAC PLAN
M-401 SCALE: 1/8" = 1'-0"
istry
ff rAwr W11009
MCKINSTRY CO.
SEATTLE:
5005 3RD AVE SW
SEATTLE, WA 98134
206— 762— 3311
www.mckinstry.com
PROJECT:
SWEDISH
KRUGER CLINIC -
PRESSURIZATION
21600 HWY 99
EDMONDS, WA 98026
CONSULTANTS:
REGISTRATION:
\ P� L) �r
OQ�`` of ti
�Q O
N Z
1� 3999
P01 T ERF'�G���
SS/ONAI Ea
THIS IS AN ELECTRONIC SIGNATURE. DIGITAL
STAMP ORIGINAL ON FILE AT MCKINSTRY.
ISSUES:
NO DATE DESCRIPTION
1 2/9/24 MECHANICAL PERMIT SET
DESIGNED: S. DAVENBERRY
DRAWN: B. MCLEOD
CHECKED: D. MA
JOB NO: 208321
SHEET TITLE:
FIRST FLOOR HVAC
PLAN
SHEET NUMBER:
RECEIVED
Mm401 Mar 21 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT