Loading...
REVIEWED RESUB1 BLD2023-0345+LANDSCAPE WORKSHEET+5.24.2023_8.32.51_AM+3565796LQ King County Department of Permitting and Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 206-296-6600 TTY Relay: 711 www.kingcounty.gov Project Name: Kruger Building Permitting Project #: L04 Web date: 05/20/2016 Landscape Bond Quantity Worksheet Form For alternate formats, call 206-296-6600 Address: 21600 Highway 99, Edmonds, WA. 98026 Prepared By: Sean Lundquist Phone: 206-297-4422 Bonds are based upon required landscaping and will be posted for performance and/or maintenance. Required landscaping includes perimeter landscaping, surface parking area landscaping, (KCC 21A.16) and any landscaping required by SEPA environmental review. The maintenance period is for the life of the project, however, after posting for maintenance, the performance bond will be reduced to 30% of the total performance bond price including contingency, or other amount as warranted by site specific or current market considerations at the discretion of the department ($1,000.00 minimum). Bonds will be held for a minimum two year period. Upon re - inspection of the site at the end of the monitoring period, the bond will be released if the site has been properly maintained (KCC 21A.16.180). If the project has not been maintained and there are dead trees, shrubs, ground cover, or other deficiencies noted in the required landscaping, the bond will be held until the deficiencies are corrected. UNIT PRICE UNIT TYPE QUANTITY PRICE SOD LAWN AREAS $500.00 MIS (1000 SQ. FT) - - HYDROSEEDING $50.00 MIS (1000 SQ. FT) - - SOIL PREPARATION A. TOPSOIL (6 INCHES DEEP) $25.00 CY (CUBIC YARD) 118 2,969 B. MULCH (2 INCHES DEEP) $4.00 SY (SQUARE YARD) 712 2,850 C. PEAT MOSS (TWO INCHES DEEP) $2.30 SY (SQUARE YARD) - - D. COMPOST (3 INCHES DEEP & TILLING $26.00 SY (SQUARE YARD) 712 18,512 E. FERTILIZER $6.67 CY (CUBIC YARD) - - PLANT MATERIALS A. DECIDUOUS TREES 1.75 - 2.00" CALIPER (minimum height 10') PERIMETER & PARKING AREAS $250.00 EACH COST & LABOR 13 3,250 1.5 - 1.75" CALIPER INTERIOR LANDSCAPING OR OTHER REQUIRED LANDSCAPING $225.00 EACH COST & LABOR _ _ B. EVERGREEN TREES FIVE (5) FEET OR ABOVE $150.00 EACH COST & LABOR 7 1,050 C. SHRUBS $35.00 EACH COST & LABOR 647 22,645 D. GROUND COVER $4.00 EACH COST & LABOR 1,852 7,408 SUB TOTAL BOND AMOUNT BOND AMOUNT SUB TOTAL: $ 58,684 Lan dscapeBond QuantityFORMreviseddoc.doc b-wks-landscapebq.pdf L04 : 05/20/2016 L04 Web date: : 05/20/2016 UNIT PRICE UNIT TYPE QUANTITY PRICE MISCELLANEOUS TREE STAKES $2.65 EACH PER STAKE & 26 69 LABOR FENCING: LINEAR FOOT SOLID WOOD CEDAR $28.50 INCLUDES LABOR BERMING $17.50 LINEAR FOOT INCLUDES LABOR IRRIGATION 800 SQUARE FOOT 6,414 5,131 RELOCATING TREES ON SITE 36" BALL $260.00 EACH - - 60" BALL $920.00 EACH - - RELOCATING SHRUBS ON SITE 12" BALL $26.00 EACH - - 24" BALL $33.00 EACH - - ADDITIONAL ITEMS: Onsite recreation facilities SUB TOTAL BOND AMOUNT BOND SUB TOTAL: $ 63,884 Add 30% of the Bond Sub -Total for Contingency in accordance with KCC 27A.30.020 30 % CONTINGENCY: $ 19,165 TOTAL BOND PRICE * TOTAL BOND PRICE: $ 83,049 * NOTE: Permit inspection fees, in addition to the bond price, are required for monitoring the performance and maintenance of required landscaping. Lan dscapeBond QuantityFORMreviseddoc.doc b-wks-landscapebq.pdf L04 : 05/20/2016