REVIEWED RESUB1 BLD2023-0345+LANDSCAPE WORKSHEET+5.24.2023_8.32.51_AM+3565796LQ
King County
Department of Permitting
and Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay: 711
www.kingcounty.gov
Project Name: Kruger Building
Permitting Project #:
L04 Web date: 05/20/2016
Landscape Bond Quantity
Worksheet Form
For alternate formats, call 206-296-6600
Address: 21600 Highway 99, Edmonds, WA. 98026
Prepared By:
Sean Lundquist
Phone: 206-297-4422
Bonds are based upon required landscaping and will be posted for performance and/or maintenance. Required landscaping includes
perimeter landscaping, surface parking area landscaping, (KCC 21A.16) and any landscaping required by SEPA environmental review.
The maintenance period is for the life of the project, however, after posting for maintenance, the performance bond will be reduced to
30% of the total performance bond price including contingency, or other amount as warranted by site specific or current market
considerations at the discretion of the department ($1,000.00 minimum). Bonds will be held for a minimum two year period. Upon re -
inspection of the site at the end of the monitoring period, the bond will be released if the site has been properly maintained (KCC
21A.16.180). If the project has not been maintained and there are dead trees, shrubs, ground cover, or other deficiencies noted in the
required landscaping, the bond will be held until the deficiencies are corrected.
UNIT PRICE
UNIT TYPE
QUANTITY
PRICE
SOD LAWN AREAS
$500.00
MIS (1000 SQ. FT)
-
-
HYDROSEEDING
$50.00
MIS (1000 SQ. FT)
-
-
SOIL PREPARATION
A. TOPSOIL (6 INCHES DEEP)
$25.00
CY (CUBIC YARD)
118
2,969
B. MULCH (2 INCHES DEEP)
$4.00
SY (SQUARE YARD)
712
2,850
C. PEAT MOSS (TWO INCHES DEEP)
$2.30
SY (SQUARE YARD)
-
-
D. COMPOST (3 INCHES DEEP & TILLING
$26.00
SY (SQUARE YARD)
712
18,512
E. FERTILIZER
$6.67
CY (CUBIC YARD)
-
-
PLANT MATERIALS
A. DECIDUOUS TREES
1.75 - 2.00" CALIPER (minimum height 10')
PERIMETER & PARKING AREAS
$250.00 EACH
COST & LABOR
13
3,250
1.5 - 1.75" CALIPER
INTERIOR LANDSCAPING OR OTHER REQUIRED LANDSCAPING
$225.00 EACH
COST & LABOR
_
_
B. EVERGREEN TREES
FIVE (5) FEET OR ABOVE
$150.00 EACH
COST & LABOR
7
1,050
C. SHRUBS
$35.00 EACH
COST & LABOR
647
22,645
D. GROUND COVER
$4.00 EACH
COST & LABOR
1,852
7,408
SUB TOTAL BOND AMOUNT
BOND AMOUNT SUB TOTAL:
$ 58,684
Lan dscapeBond QuantityFORMreviseddoc.doc b-wks-landscapebq.pdf L04 : 05/20/2016
L04 Web date: : 05/20/2016
UNIT PRICE
UNIT TYPE
QUANTITY
PRICE
MISCELLANEOUS
TREE STAKES
$2.65 EACH
PER STAKE &
26
69
LABOR
FENCING:
LINEAR FOOT
SOLID WOOD CEDAR
$28.50
INCLUDES LABOR
BERMING
$17.50
LINEAR FOOT
INCLUDES LABOR
IRRIGATION
800
SQUARE FOOT
6,414
5,131
RELOCATING TREES ON SITE
36" BALL
$260.00
EACH
-
-
60" BALL
$920.00
EACH
-
-
RELOCATING SHRUBS ON SITE
12" BALL
$26.00
EACH
-
-
24" BALL
$33.00
EACH
-
-
ADDITIONAL ITEMS:
Onsite recreation facilities
SUB TOTAL BOND AMOUNT
BOND SUB TOTAL:
$ 63,884
Add 30% of the Bond Sub -Total for Contingency in accordance
with KCC 27A.30.020
30 % CONTINGENCY:
$ 19,165
TOTAL BOND PRICE *
TOTAL BOND PRICE:
$ 83,049
* NOTE: Permit inspection fees, in addition to the bond price, are required for monitoring the performance and maintenance of required
landscaping.
Lan dscapeBond QuantityFORMreviseddoc.doc b-wks-landscapebq.pdf L04 : 05/20/2016