REVIEWED BLD2024-0650+Manufacturer_Specifications_and_Installation_Instructions+5.14.2024_2.35.13_PM+4256609 (2)Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
Prepa0 MAKE* UnitT g:10t BLD2024-0650
Unit Tag: 10 ton - Sche
Quantity: 1
Trane Precedent Heat Pump Packaged Rooftop
Application Unit Size 4 Supply Fan
External
Airflow Static
DX cooling 10 Ton Pressure
4000 cfm 0.600 in
H2O
Unit Electrical - I
Voltage/phase/hertz 208-230/60/3
- MCA 101.00 A
MOP 110.00 A
MCA (230 w/ Elec Heat) 108.00 A
MOP (230 w/ Elec Heat) 125.00 A
ntering Dry Bulb 80.00 F
Entering Wet Bulb 67.00 F
Ambient Temp 95.00 F
Leaving Coil Dry Bulb 57.60 F
Leaving Coil Wet Bulb 57.52 F
Leaving Unit Dry Bulb 58.90 F
Leaving Unit Wet Bulb 58.02 F
•
Heat Pump Mode
Output Heating Capacity 102.24 MBh
Output Heating Capacity with Fan 103.74 MBh
Heating Delta T 23.67 F
Heating EAT 70.00 F
Heating Ambient Temp 47.00 F
Heating Ambient WB 42.60 F
Heating Ambient Relative 70.00 %
Humidity
Indoor Fan Data
Type BC Plenum
Drive Type Direct
Evap Fan FLA 7.30 A
Indoor Fan Performance
Airflow 4000 cfm
Design ESP 0.600 in H2O
Component SP 0.000 in H2O
Total SP 0.620 in H2O
Supply Motor Horsepower 2.750 hp
Indoor Motor Operating Power 1.38 bhp
Indoor RPM 1315 rpm
Dimensions (il�.r Operating Weight
RECEIVED
May 15 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
EER IEER/SEER Elevation
Height Width Length Minimum Maximum
11.00
3.91 ft 4.44 ft 7.39 ft 850.0 lb 1239.0 lb
Capacity
Gross Total 118.05 MBh
Gross Sensible 96.98 MBh
Net Total 114.17 MBh
Net Sensible 93.10 MBh
Fan Motor Heat 1.50 MBh
Refrig Charge -circuit 1 16.3 lb
14.10 0.00 ft
Secondary Heat
Heat Type Electric
Heating Capacity 18 kW3ph@240,480,600 derate to
unit volt
Electric Heat Output 61.47 MBh
Electric Heat Air Temp Rise 14.15 F
EL
Outdoor Fan Data
Type Propeller
Fan Quantity 1
Drive Type Direct
i Outdoor Fan Performance
Condenser Fan FLA 3.30 A
Compressor Sect•Accessories
Power 8.77 kW Roof curb yes
Circuit 1 RLA 34.00 A Fresh air selection Dry bulb econ 0-100% w/o bar relief
Circuit 2 RLA 0.00 A ' Barometric relief yes
2024/02/22 17:24:14 Page 1 of 15
MAKE*Job
0
Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
Acoustics Sound Path
63 Hz 125 Hz
250 Hz
500 Hz
1 kHz
2 kHz
4 kHz
8 kHz
Ducted Discharge
81 dB 82 dB
77 dB
73 dB
66 dB
65 dB
62 dB
61 dB
Ducted Inlet
82 dB 76 dB
69 dB
61 dB
58 dB
58 dB
56 dB
50 dB
Outdoor Noise
85 dB 91 dB
86 dB
84 dB
81 dB
76 dB
72 dB
67 dB
2024/02/22 17:24:14 Page 2 of 15
TRAIVE® Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
EVAPORATOR
SECTION ACCESS PAN
CONDENSATE DRAIN (ALT)
3/4"-14 NPT DIA. HOLE —
4
2" ELECTRICAL CONNECTION
(SINGLE POINT POWER WHEN HEAT INSTALLED)
THROUGH THE BASE
CONDENSATE —
PANEL
CONDENSER FAN
DENSER COIL
IT CONTROL WIRE 7/8' DIA. HOLE
VICE GAUGE PORTACCESS 1 3/8" DIA. HOLE
POWER WIRE
COMPRESSOR ACCESS PANEL
275/8'� NOTES:
1. THRU -THE -BASE ELECTRICAL IS NOT STANDARD ON ALL UNITS.
2. VERIFY WEIGHT, CONNECTION, AND ALL DIMENSION WITH
4 1/8" INSTALLER DOCUMENTS BEFORE INSTALLATION
4AA'
17 1 /2" 9 7/8"�171/2-j�3 5/8"
PLAN VIEW UNIT
DIMENSION DRAWING
7
RETURN
SUPPLY 237/8"
d —
00 00 43/4"
19 1/4" 9 3/8" 16 3/4" 3 7/8" 4 1/4"
5 5/8"
88 5/8" 175/8-
CONDENSATE 53 1/4"
PACKAGED HEATPUMP
32 1/4" 46 7/8"
24 1 /2"
9 5/8"
5 5/8"
DIMENSION DRAWING
0
0
0
HORIZONTAL
AIR FLOW
2024/02/22 17:24:14 Page 3 of 15
MAKE*Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
2
PANEL u 0
ACCESS SIDE
CONDENSER
COIL SIDE
CONDENSER
COIL SIDE
— — — THROUGH THE BASE
ELECTRICAL(SEE NOTE 1)
11/16,
2 3(4"
3 3/4"
THROUGH BASE
CONDENSATE
5 7/8"
5"
THROUGH THE BASE
40 3/4"
GAS DHC MODELS
ONLY) SEE NOT 1)
n
NOTES:
\/L, �J
1. THRU -THE -BASE ELECTRICAL AND/OR GAS IS NOT STANDARD ON ALL UNITS.
PANEL
2. VERIFY WEIGHT, CONNECTION, AND ALL DIMENSION WITH
ACCESS SIDE INSTALLER DOCUMENTS BEFORE INSTALLATION
THRU THE BASE UTILITIES
PLAN / ISO VIEW DRAWING
2024/02/22 17:24:14 Page 4 of 15
Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
TRANE® Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
ELECTRICAL / GENERAL DATA
GENERAL (2)(4X6)
WITH HEATER
Model:
WSC120H
Oversized
Motor
Heater kW Rating :
13.5 / 18.0
Urut Operating Voltage:
187-256
MCA:
Stage:
1
U nit Primary Voltage:
208
MFS:
MCA:
101.0/108.0
Urut Secondary Voltage:
230
MCB
MFS
110/125.0
Unit Hertz:
60
MCB
110/125.0
Unit Phase:
3
EER
Standard Motor
Field Installed Oversized Motor
Oversized Motor
Field Installed Oversized Motor
Minimum CircuitAmpacily:
540
MCA:
MCA: N/A
MCA N/A
Maximum Fuse Size:
80.0
MFS:
MFS: N/A
MFS: N/A
Maximum (HACR) Circuit Breaker.
80.0
MCB:
MCB: N/A
MCB: N/A
INDOOR MOTOR
Standard Motor
Outsized Motor
Field Installed Oversized Motor
Number: 1
Number. N/A
Number: N/A
Horsepower: 2.75
Horsepower: N/A
Horsepower: N/A
Motor Speed (RPM): -
Motor Speed (RPM): N/A
Motor Speed (RPM): N/A
Phase. 3
Phase: N/A
Phase: N/A
Full Load Amps: 7.3
Full Load Amps: N/A
Full Load Amps: N/A
Locked RotorAmps --
Locked RotorAmps. N/A
Locked RotorAmps N/A
COMPRESSOR Circuit 1/2
OUTDOOR MOTOR
Number 1
Number.
1
Horsepower: 10.5
Horsepower:
0.70
Phase. 3
Motor Speed (RPM):
1100
Rated Load Amps: 34.0
Phase:
3
Locked Rotor Amps -
Full Load Amps:
33
Locked RotorAmps:
-
POWER EXHAUST ACCESSORY (37)
FILTERS
REFRIGERANT (2)
(Field Installed Power Exhaust)
Type R410
Phase: N/A
Type: Throwaway
Horsepower: N/A
Furnished: Yes
Factory Charge
Motor Speed (RPM): N/A
Number 4
Circuit#1 16.3lb
Full Load Amps: N/A
Recommended 20"05"x2"
Circuit#2
Locked RotorAmps: N/A
NOTES:
1. Maximum (HACR) Circuit Breaker sizing is for installations in the United States only.
2. Refrigerant charge is an approximate value. Fora more precise value, see unit nameplate and service instructions.
3. Value does not include Power Exhaust Accessory.
4. Value includes oversized motor.
5. Value does not include Power Exhaust Accessory.
6. EER is rated at AHRI conditions and in accordance with DOE test procedures.
7. Installation ofths powerexhaust kit will affect unit level MCA and could affect MOP sizing having a direct impact on existing field wiring and unit protection devices. The
change in MCA4AOP is the sole responsibility of the field installing party Trane will not issue new nameplates as a result of this power exhaust accessory
installation. FLA of the power exhaust kit option must be added to the MCA of the unit for building supply conductor sizing determination.
2024/02/22 17:24:14 Page 5 of 15
TRAIVE® Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
PACKAGED HEAT PUMP
CORNER WEIGHT
INSTALLED ACCESSORIES NET WEIGHT DATA
ACCESSORY
WEIGHTS
ECONOMIZER
36.0lb
MOTORIZED OUTSIDE AIR DAMPER
MANUAL OUTSIDE AIR DAMPER
BAROMETRIC RELIEF
Flo .0lb
OVERSIZED MOTOR
BELT DRIVE MOTOR
POWER EXHAUST
HEATER
50.0 lb
THROUGHT THE BASE ELECTRICAL (FIOPS)
13.0lb
UNIT MOUNTED CIRCUIT BREAKER (FIOPS)
UNIT MOUNTED DISCONNECT (FIOPS)
5.0lb
POWERED CONVENIENCE OUTLET (FIOPS)
HINGED DOORS (FIOPS)
HAIL GUARD
SMOKE DETECTOR, SUPPLY/RETURN
ROOF CURB
89.0 lb
BASIC UNIT WEIGHTS
SHIPPING NE7
CORNER WEIGHTS 11
OA 303.OIb O 218.OIb
CENTER OF GRAVITIY
(E) LENGHT (F) WIDTH
948.0 D
850.0 Ib
BO
170.0 Ib
pO
159.0 Ib
40'
24'
NOTE:
1. CORNER WEIGHTSARE GIVEN FOR INFORMATION ONLY.
2. TO ESTIMATE SHIPPING WEIGHTADD 5 LBS TO NET WEIGHT.
3. BASIC UNIT WEIGHT DOES NOT INCLUDE ACCESSORY WEIGHT. TO OBTAIN TOTAL
WEIGHT, ADD ACCESSORY NET WEIGHT TO BASIC UNIT WEIGHT.
4. WEIGHTS FOR OPTIONS NOT LISTED ARE >5 LBS.
0'
\'
0
PACKAGED HEAT PUMP
RIGGING AND CENTER OF GRAVITY
2024/02/22 17:24:14 Page 6 of 15
TRAIVE® Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
CLEARANCE 36"
DOWNFLOW CLEARANCE 36"
HORIZONTAL CLEARANCE 18"
ROOF OPENIN
UNff OUTLINE —
PACKAGED HEAT PUMP
CLEARANCE
CLEARANCE FROM TOP OF UNIT 72"
CLEARANCE 48"
CLEARANCE 36"
I
I
46" 53 1 4"
I
I
46"
88 5/9'
PACKAGED HEAT PUMP
DOWNFLOWTYPICAL ROOF OPENING
2024/02/22 17:24:14 Page 7 of 15
MAKE*Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
NOTES:
1 11/16"
1 11/16"
18 7/16"
8 5/8'
iS 1
34 3/8"
7/16'
343
14"
15/1
84 1/2"
ROOFTOPCURB
ACCESSORY
IFY WEIGHT, CONNECTION, AND ALL DIMENSION WITH
FALLER DOCUMENTS BEFORE INSTALLATION
50 7/16"
2024/02/22 17:24:14 Page 8 of 15
MAKE*Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
Downflow Duct Connections - Field Fabricated
Al Flanges - 1 1 /4"
ACCESSORY - DUCT CONNECTIONS
2024/02/22 17:24:14 Page 9 of 15
MAKE*Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
BAROMETRIC RELIEF H
NA
BAROMETRIC RELIEF
Asa
ACCESSORY - BAROMETRIC RELIEF DAMPER HOOD
OMIZER HOOD
2024/02/22 17:24:14 Page 10 of 15
TRAIVE® Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
.......
..... ..
.......
..... ..
.......
.......
0
00 00
ACCESSORY - ECONOMIZER HOOD
QER HOOD
NOMIZER HOOD
6 7/9
1
16 314'
2024/02/22 17:24:14 Page 11 of 15
MAKE*Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
0 Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
.......
.......
.......
.......
.......
.......
0
00 00
ECONOMIZER HOOD
ACCESSORY
J
--16 3/4'
HOOD
NOMIZER HOOD
6 7/8"
i
2024/02/22 17:24:14 Page 12 of 15
Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
TRAN6® Unit Prepared
10 ton - Sche
Quantity: 1
General
The units shall be convertible airflow. The operating range shall be between 11 YF and 0°F in cooling
as standard from the factory for units with microprocessor controls. Cooling performance shall be rated
in accordance with ARI testing procedures. All units shall be factory assembled, internally wired, fully
charged with R-410A, and 100 percent run tested to check cooling operation, fan and blower rotation,
and control sequence before leaving the factory. Wiring internal to the unit shall be colored and
numbered for simplified identification. Units shall be cULus listed and labeled, classified in accordance
for Central Cooling Air Conditioners.
Case
Unit casing shall be constructed of zinc coated, heavy gauge, and galvanized steel. Exterior surfaces
shall be cleaned, phosphatized, and finished with a weather -resistant baked enamel finish. Unit's
surface shall be tested 672 hours in a salt spray test in compliance with ASTM 13117. Cabinet
construction shall allow for all maintenance on one side of the unit. All exposed vertical panels and top
covers in the indoor air section shall be insulated with a cleanable foil -faced, fire -retardant permanent,
odorless glass fiber material. All insulation edges shall be either captured or sealed. The unit's base
pan shall have no penetrations within the perimeter of the curb other than the raised 1 1/8" high
downflow supply/return openings to provide an added water integrity precaution, if the condensate
drain backs up. The base of the unit shall have provisions for forklift and crane lifting, with forklift
capabilities on three sides of the unit.
Unit Top
The top cover shall be one piece construction or, where seams exist, it shall be double -hemmed and
gasket -sealed. The ribbed top adds extra strength and enhances water removal from unit top.
Filters
Throwaway filters shall be standard on all units. Optional 2" MERV 8 and MERV 13 filters shall also be
available.
Compressors
All units shall have direct -drive, hermetic, scroll type compressors with centrifugal type oil pumps.
Motor shall be suction gas-cooled and shall have a voltage utilization range of plus or minus 10
percent of unit nameplate voltage. Internal overloads shall be provided with the scroll compressors.
Refrigerant Circuits
Service pressure ports, and refrigerant line filter driers are factory -installed as standard. An area shall
be provided for replacement suction line driers.
Evaporator and Condenser Coils
Internally finned, 5/16"copper tubes mechanically bonded to a configured aluminum plate fin shall be
standard. Coils shall be leak tested at the factory to ensure the pressure integrity. The evaporator coil
and condenser coil shall be leak tested to 650 psig and pressure tested to 450 psig. The condenser
coil shall have a patent pending 1+1+1 hybrid coil designed with slight gaps for ease of cleaning. A
removable, reversible, double -sloped condensate drain pan with through the base condensate drain is
standard.
Outdoor Fans
The outdoor fan shall be direct -drive, statically and dynamically balanced, draw -through in the vertical
discharge position. The fan motor shall be permanently lubricated and shall have built-in thermal
overload protection.
Indoor Fan
Standard efficiency 6 to 8.5 ton units come standard with belt drive motors with an adjustable idlerarm
assembly for quick -adjustment to fan belts and motor sheaves. All high efficiency and 10 ton standard
efficiency shall have variable speed direct drive motors. All motors shall be thermally protected. All
indoor fan motors meet the U.S. Energy Policy Act of 1992 (EPACT).
Plenum Fan
The following unit shall be equipped with a direct drive plenum fan design (WSC120E). Plenum fan
design shall include a backward -curved fan wheel along with an external rotor direct drive variable
speed indoor motor. All plenum fan designs will have a variable speed adjustment potentiometer
located in the control box.
2024/02/22 17:24:14 Page 13 of 15
Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
TRAN6® Unit Prepared
10 ton - Sche
Quantity: 1
Controls
Unit shall be completely factory -wired with necessary controls and contactor pressure lugs or terminal
block for power wiring. Unit shall provide an external location for mounting a fused disconnect device.
A choice of microprocessor or electromechanical controls shall be available. Microprocessor controls
provide for volt control functions. The resident control algorithms shall make all heating, cooling, and/or
ventilating decisions in response to electronic signals from sensors measuring indoor and outdoor
temperatures. The control algorithm maintains accurate temperature control, minimizes drift from set
point, and provides better building comfort. A centralized Microprocessor shall provide anti -short cycle
timing and time delay between compressors to provide a higher level of machine protection.
Phase monitor
Phase monitor shall provide 100% protection for motors and compressors against problems caused by
phase loss, phase imbalance, and phase reversal. Phase monitor is equipped with an LED that
provides an ON or FAULT indicator. There are no field adjustments. The module will automatically
reset from a fault condition.
Powered or Unpowered Convenience Outlet
This is a GFCI, 120v/15amp, 2 plug, convenience outlet, either powered or unpowered. When the
convenience outlet is powered, a service receptacle disconnect will be available. The convenience
outlet is powered from the line side of the disconnect or circuit breaker, and therefore will not be
affected by the position of the disconnect or circuit breaker. This option can only be ordered when the
Through the Base Electrical with either the Disconnect Switch or Circuit Breaker option is ordered.
Electric Heaters
Electric heat modules shall be available for installation within basic unit. Electric heater elements shall
be constructed of heavy-duty nickel chromium elements internally delta connected for 240 volt, wye
connected for 480 and 600 volt. Staging shall be achieved through ReliaTel. Each heater package
shall have automatically reset high limit control operating through heating element contactors. All
heaters shall be individually fused from the factory, where required, and shall meet all NEC and CEC
requirements when properly installed. Power assemblies shall provide single point connection. Electric
heat modules shall be UL listed or CSA certified.
Through the Base Electrical Access
An electrical service entrance shall be provided allowing electrical access for both control and main
power connections inside the curb and through the base of the unit. Option will allow for field
installation of liquid -tight conduit and an external field -installed disconnect switch.
Through the Base Electrical with Disconnect Switch
This 3-pole, molded case, disconnect switch with provisions for through the base electrical
connections are available. The disconnect switch will be installed in the unit in a water tight enclosure
with access through a swinging door. Wiring will be provided from the switch to the unit high voltage
terminal block. The switch will be UL/CSA agency recognized.
Note: The disconnect switch will be sized per NEC and UL guidelines but will not be used in place of
unit overcurrent protection.
Accessory - Economizer
This accessory shall be available with or without barometric relief. The assembly includes fully
modulating 0-100 percent motor and dampers, minimum position setting, preset linkage, wiring
harness with plug, spring return actuator and fixed dry bulb control. The barometric relief shall provide
a pressure operated damper that shall be gravity closing and shall prohibit entrance of outside air
during the equipment off cycle. Optional solid state or differential enthalpy control shall be available for
either factory or field installation. The economizer arrives in the shipping position and shall be moved
to the operating position by the installing contractor.
Accessory - Roof Curb
The roof curb shall be designed to mate with the unit's downflow supply and return and provide
support and a water tight installation when installed properly. The roof curb design shall allow field
fabricated rectangular supply/return ductwork to be connected directly to the curb. Curb design shall
comply with NRCA requirements. Curb shall be shipped knocked down for field assembly and shall
include wood nailer strips.
2024/02/22 17,24,14 Page 14 of 15
MAKE® Job Name: 231058 - Starbucks Edmonds & 100th Graphite Reno
Prepared For:
Unit Tag: 10 ton - Sche
Quantity: 1
Sequence of Operation (if applied in a SINGLE -ZONE CONSTANT -VOLUME SYSTEM or a
CHANGEOVER BYPASS SYSTEM)
B. SINGLE -ZONE CONSTANT -VOLUME SYSTEM
1. OCCUPIED HEAT/COOL:
The RTU shall operate the supply fan continuously and modulate (or cycle) compressors, modulate (or
stage) heat, and/or enable airside economizing to maintain zone temperature at setpoint. The OA
damper shall open to bring in the required amount of ventilation.
2. MORNING WARM-UP/PRE-COOL:
The RTU shall operate the supply fan and modulate (or cycle) compressors or modulate (or stage)
heat to raise/lower zone temperature to its occupied setpoint. The OA damper shall remain closed,
unless economizing.
D. CHANGEOVER BYPASS SYSTEM
1. OCCUPIED HEAT/COOL:
Each VAV terminal shall use pressure -independent control, with airflow measurement, to vary primary
airflow to maintain zone temperature at its occupied setpoint. The RTU shall modulate the bypass
damper to maintain duct static pressure at setpoint and modulate (or cycle) compressors, modulate (or
stage) heat, and/or enable airside economizing based on current zone cooling/heating demands. The
OA damper shall open to bring in the required amount of ventilation.
2. MORNING WARM-UP/PRE-COOL:
Each VAV terminal unit shall vary primary airflow to raise/lower zone temperature to its occupied
setpoint. The RTU shall modulate the bypass damper to maintain duct static pressure at setpoint and
modulate (or cycle) compressors or modulate (or stage) heat based on current zone cooling/heating
demands. The OA damper shall remain closed, unless economizing.
3. COOLING/HEATING CHANGEOVER LOGIC:
The System Controller shall determine the overall system cooling/heating mode based on "voting"
from each zone. When the majority of zones require cooling, the RTU shall operate in cooling mode
and any zone that requires heating shall reduce primary airflow to minimum. When the majority of
zones require heating, the RTU shall operate in heating mode and any zone that requires cooling shall
reduce primary airflow to minimum.
2024/02/22 17:24:14 Page 15 of 15