REV1 REVIEWED BLD2023-0055+Applicant_Response+6.13.2023_1.50.44_PM+3606671REVISION Jun 132023 RESUB Richard A. Okimotor Architect o.1, 2023 U ARCHITECTURE, PLANNING, RESTAURANT INTERIORS 9924 - 225TH Place SW, Edmonds, WA 98020-5924 Cell (425)697-0983 email: raoarch@outlook.com 13 June 2023 CITY OF EDMONDS Planning and Building Departments 121 5th Avenue N. Edmonds, WA 98020 Attn: Donovan Akau, Building Official Re: TRIKE STOP DAYCARE CENTER, PHASE 5 BLD2023-0055 23107 100th Avenue W, Edmonds, WA 98020 SUPPLEMENTARY SUBMITTAL LETTER: Dear Mr. Akau, ,.,.,.,.,. REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT This letter is written in response to your latest comments regarding the Structural Revisions we had submitted as "Modifications After Permit" under Delta No. 2, dated 5/25/2023. New changes are noted as Delta No. 2, but with a date of 6/13/2023. I am also providing clarification and explanation as follows: 1.) We are resubmitting Sheet S2 with New Detail 1/S2 to cover instances where there is no stud framing to the roof sheathing. This is referenced to (3) new locations on Sheet S4. Detail 2/S2 is to cover instances where there exists wood stud framing to the underside of roof framing. 2.) We are resubmitting Sheet S4 with a change of Detail Reference for Shear Wall reference Detail 1/S2: a.) Along Gridline 15 between Gridlines A and B (the location for your original request for clarification). b.) Between Gridlines 9 and 10 and Gridlines B and D c.) Between Gridlines 10 and 20 and Gridlines C and D 3.) We are resubmitting Sheet S3 with the following revision: a.) The Structural Engineer has determined that along Gridline 5.5 no pad footing is required at the end points at Gridlines B and H. The pad footings previously shown have been removed. Please let me know if you have any questions regarding this resubmittal material. Thank you for your patience and continuing assistance. Cc: Autumn Snow, Wes Snow Sabco Consulting Engineers, Inc.