Building PermitType: DEMO Subtype: RES PRIMARY STRUCTURE I Status: ISSUED
Parcel No: 27032300101100
Subdivision:
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 326 SUNSET AVE EDMONDS,WA 98020
Lot: 0
Lot Area: 7920 Zoning: RS-6
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: REID- DEMO SFR
Applied: 4/25/2024
Issued:10/30/2024
Final:
Expiration Date: 10/30/2026
Issued by: NED
I WA State Contractor L & I #: SCHILB1993NC I
CONTACTS
m
NAME TYPE
NAME ADDRESS I
PHONE
EMAIL
APPLICANT
ERIK LUND
2126 WESTLAKE AVE, SEATTLE
(206)621-7150
ERIK@TYLERENGLE.COM
WA 98121
CONTACT
TYLER ENGLE ARCHITECTS
2126 WESTLAKE AVE, SEATTLE
(206)621-7150
erik@tylerengle.com
WA 98121
6710 220TH ST SW 2,
SCHILPEROORT &BROOKS
CONTRACTOR
MOUNTLAKE TERRACE WA
(206)391-8745
mbrooks@sbiconstruction.com
INC
98043
326 SUNSET AVE N, EDMONDS
OWNER
CAROLYN N & KEVIN E REID
WA 98020
FEE •' •
DESCRIPTION
CITY TECHNOLOGY FEE - PER .321.99.100.00
7.345.83.000.00
$45.00
$45.00
5/2/24 R36847
PERMIT
DEMO - RESIDENTIAL PRIMARY
$342.00
$342.00
5/2/24 R36847
TOTALS: $387.00
$387.00
CONDITIONS
CONDITION TYPE STATUS
NOTES
Printed: Wednesday, October 30, 2024 3:32:39 PM 1 of 2
DEMO PerCity mit
• • • -
•:� i 1 1 .
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
=15.1:91*10111•
-• •
• •-
• _-W • ••- •
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
S7
A-1 TESC AND MOBILIZE
E-6 DEMO SEWER CAP
E-6 DEMO WATER AVB
X-2 ENGINEERING FINAL
X-3 BUILDING FINAL"
E-3 STRM MGMT FACILITY
NOTE TO INSPECTOR: THIS INSPECTION IS TO VERIFY
THAT THE OUTLET/OUTFALL FOR THE EXISTING
DETENTION SYSTEM IS CAPPED PRIOR TO DEMO.
Printed: Wednesday, October 30, 2024 3:32:39 PM 2 of 2