Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED Parcel No: 27032300104300 Site Address: 144 RAILROAD AVE EDMONDS,WA 98020-7207 Subdivision: TOWN OF EDMONDS WATERFRONT, SP AFN 9807230161 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $300,000.00 Occupancy Type: Construction Type: VB Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: WATERFRONT PARK OFFICE BUILDING- SIDING WA State Contractor L & I #: COMPTBL829MC Applied: 5/3/2022 Issued: 9/9/2022 Final: Expiration Date: 9/4/2023 Issued by: JOK CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL 144 RAILROAD AVE 101, APPLICANT BRADY BARKEY (206)972-2709 BRADY@LIVINGBODE.COM EDMONDS WA 98020 CONTACT BODE 144 RAILROAD AVE 101, (206)972-2709 Brady@livingbode.com EDMONDS WA 98020 1919 4TH AVE S, SEATTLE WA CONTRACTOR COMPTON BUILDERS LLC 98134 18605 17TH AVE NW, OWNER PROJECT S15 LLC SHORELINE WA 98177 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/10/22 R20127 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 9/9/22 R22967 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $2,740.00 $2,740.00 9/9/22 R22967 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $2,329.00 $2,329.00 5/10/22 R20127 TOTALS: $5,134.00 $5,134.00 CONDITION TYPE STATUS NOTES Printed: Friday, September 09, 2022 1:12:56 PM 1 of 2 COMMERCIALPermitCity • • • • ' Edmonds980201, &BL1 1 -• • • •425.771.022 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary FOR construction sites as a result of construction activity are exempt from the noise limits of ALL BUILDING PERMITS INFORMATION ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Printed: Friday, September 09, 2022 1:12:56 PM 2 of 2