Loading...
REVIEWED RESUB 2-BLD2023-1489+Mechanical_Plan+5.22.2024_12.22.26_PM+4274963REVIEWED BY CITY OF EDMONDS zo �I A UNIT LENGTH a 0 z 0 L� z O OUTLINE OF ICS BUILDING W I— A 6" BUILDING WRH SKIDS A OF FOUNDATION TIE DOW AT CORNER m 4 64 ° FOOTING AND FOUNDATION BY a CUSTOMER UNIT WIDTH 6" BUILDING WITH NO SKIDS TIE DOWN . .......................... TIE DOWN — AT CORNER FOUNDATION EDGE DIMENSION FOUNDATION PLAN �4"ED � TIE A L-12 TOWN DOWNS EDGE ;"x1-1/4" HEX WASHER HEAD L12 6" SELF DRILLING SCREWS 10" (FACTORY SUPPLIED) TIEDOWN BASE 3/4" r1 1/4" TIE DOWN — FIELD WORK . AT CORNER ALL DETAILS THIS SHEET ARE BY 4 ;r CUSTOMER SUPPLIED CONCRETE PAD MINIMUM CONGI ETE . FOUNDATION NOTES: EMBEDMENT 6'.: }" DIAL HILT! HTf-Z ROD WITH HIL11 1 2500 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE AT 28 DAYS. HR-HY SAFE SET SYSTEM 2 MINIMUM SOIL BEARING CAPACITY SHALL BE 1000 PSF. HILTI Z ROD (CUSTOMEERR SUPPLIED) 3 INSTALLATION OF FOUNDATION IS RESPONSIBILITY OF CUSTOMER. 4 FINISH EDGES OF SLAB WITH 1/8" SLOPE FROM BUILDING TO EDGE. 5 WHEN ICS STORAGE UNIT IS ADJACENT TO ANOTHER BUILDING REDUCE OVERALL WIDTH BY 6". 6 8" MINIMUM CONCRETE DEPTH REQUIRED AT TIE DOWN. 61 °. FOOTING AND FOUNDATION BY CUSTOMER BASE CONNECTION: 6" 2"x2"x1/8" CONT. ALUMINUM ANGLE WITH #14 SMS TO THE WALL AND 1/4" ffW TAPCON ANCHOR WITH 1-3/4- EMBEDMENT TO CONC. SLAB FASTENERS �SPACIND INNGRATR24ID0/C v FOOTING AND FOUNDATION BY °�. CUS 4TOMER BUILDING WITH NO FLOOR BLD2023-1489 May 20 2024 DEPAREVELOPMET SERVICES