DNS RESUB1 BLD2021-0809+COMPLETED SI AGREEMENT+3.9.2022_11.23.09_AM+2727237RESUB
Mar 09 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT 4 SPECIAL INSPECTION AND TESTING AGREEMENT
Permit BLD2021-0809
Project: Quantum Homes _L!Q,3"3 240th St. SW LQJ 2
P*'O"'p issuance Of aPermft, lhisfinw m"' & completed in fts endreo and retrained to the Ory for
VW"04 :'fire c0l"P141,000nm J"AW haw skvwturej of acknoWeAtmenl by aupar de&
DUTIES AND RESPONSIBILITIES
Suecial Inspection Firm and $pecW inVtr,,jotv.
The Special Inspection firm of will perfarm special
inspection for the following 01F forms must be subrMitted if more than one firm is to be
employed):
—Reinforced Concrete — Spray applied Fireproofing
_Bolting in Concrete — Smoke Control Systems
Prestressed Concrete Lateral Wood
shotcrete Suuctural Observation by design professional
Structurnt Masonry -.A-Soils to include:
1) !Lm2gaasAomoll;
2) 13ac andkf .dJpqM Apf ;eClaW_4_Wd
—Structural Epoxy
— High Strength Bolting
All individual inspectors to be employed on this project will be WABO certified for the " of work they are to
inspect If inspection is for work that is not covered by the WABO categories, or the inspector is not WAK)
certified, a detailed resume of the inspector and firm must be submitted_ The resume must show that the inspector
and the firm am qualified by education and experience to perform the work and testing required by the project
design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Rovisions
and addenda sheets will not be used for inspection unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the OODANictor for resolution.
A weekly report shall be submitted to the City-
, detailing the inspections and testing performed, listing any
nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building depaturient prior W the Cortificate of Occupancy being
issued, This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be
dwailed in the final report,
LC%m and Special Inop"fion fbym, 20 19tsp"j') Itnowim fonn� S! 21U2 1 -0909
Oftakim Hoona LLC LOT ld*c 1211 OW2 I
C"At"MG.
The contractor "' Provide the Special inspector or agency a*uate notification of work requiring inspection.
The City approved plan and specifications must be made available, at obsite f
inspector and the City inspector, The colftractor shall maintain
the J of the use of the special
all parties. ail daily inspection reports, on site, for MVICW by
nle special inspection functions am considered to be in addition to theno i
and the contractor is responsible for contacting to schedule r
ing the City normal nspOctions performed by the Citypoured or other work covered until approval is given by the City egular inspextions, No concrete shall be
inapector.
Bui Lietron—tat.
The uilding department shall review any revisions and addenda.addenda.The City inspector will monitor the specialresponsible for approvoingcovma6plaiansce with the agreement and the UPProed Plana. The City inspector shall be
in bction fimetions f
stages Of c0niftuctron to be coveredean d for work proem
"a=Pr_qWWM119_
Ile archited and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspecri .on and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a wat, as to ensure nsure that all required city approvals are
obtained, prior to work shown on the revisions being performed in the field.
QW-H—er.,
The project owner, or the architect or engineer acting as the owners agent, shall employ the Special insp"tor or
agency.
A -failure or the special inspXtor or r ENFORCEwl'".
�rrn to Perform
Plans and this document, may void this agreement anind ktheeepinugildwinitg' tohfefircea'lul'3"a'pmpernotv'aolfotfhth'cBSPC'ectihaeI 4inPSPProevJc0dr,
In such a cm a new special inspector and/or firm would need c
design au&or omstruction parties to perform to be Pmposed'fOr approval. A fidlure of the
f in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved,
I have mad and to conip) ACKNOWLEDGMENTS
*y,,,
Y W the terms and conditions 4,11ii agreement,
Owner te- L L r_ Signature
Contractor.
Signature,
Special IMP, Agency
ACCEPTED FOR THE CITY OF F-T)MONM BVILDIN83MSION
By: _DOWAT�� 4t7� Dam 3/16/2022
Date ' 'D '�"- 0'I' -21 7
Dat<
Litters and *Cig, 1WP4,:Ij0$% fWMI 2019�spft,#, I
Q-ntum Homo LLC LOT 2,�&xt2tjono2j MPW�Ys fonwSl 20.1 I -ago