Building PermitType: PLUMBING Subtype: RESIDENTIAL PLUMBING I Status: ISSUED
Parcel No: 27032500104200 Site Address: 926 SPRUCE ST EDMONDS,WA 98020-3390
Subdivision: SP S-7-89, SP S-13-76, 003719, KELLOGG SUPPLEMENTAL PLAT OF
Lot: 0
EDMONDS
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: BACON- PLUMBING FOR REMODEL BLD2024-0851
Applied: 10/30/2024
Issued:10/31/2024
Final:
Expiration Date: 10/31/2026
Issued by: NED
I WA State Contractor L & I #: MIKESPD795MO I
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
21010 70TH AVE W, EDMONDS
INFO@MIKESPLUMBINGANDDRAIN.0
APPLICANT
NICOLE MARINEZ
(425)775-0201
WA 98026-7202
OM
MIKE'S PLUMBING &
21010 70TH AVE W, EDMONDS
CONTACT
(425)775-0201
info@mikesplumbinganddrain.com
DRAIN CLEANING
WA 98026-7202
MIKES PLUMBING/DRAIN
PO BOX 1535, EDMONDS WA
CONTRACTOR
(425)775-0201
info@mikesplumbinganddrain.com
CLEANING
98020-1535
926 SPRUCE ST, EDMONDS WA
OWNER
DIANA H & JOHN A
BACON
98020-3390
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
10/31/24
R41078
PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.345.83.000.00
$119.00
$119.00
10/31/24
R41078
TRAP
PLUMBING BASE FEE
001.000.322.10.000.00
$57.00
1$57.00
10/31/24
R41078
WATER HEATER - TANKLESS
001.000.345.83.000.00
$17.00
$17.00
10/31/24
R41078
TOTALS: $238.00
$238.00
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, October 31, 2024 12:38:52 PM 1 of 2
PLUMBING Permit
City of • • •
•: i 1 �129
www.edmondswa.gov -
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufacture's installation instructions on site for Building Inspector.
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
B-3 PLUMB ROUGH IN
X-0 PLUMBING FINAL"
Printed: Thursday, October 31, 2024 12:38:52 PM 2 of 2