Loading...
BLD2022-1181+Supplementals_Professional_Stamp_Requirement+9.6.2022_11.15.37_AM+3091212Og FDAI OM MyBuildingPermit.com Jurisdiction: Edmonds Project Name: Firdale Village Fire 11- Market Appfication 1D: 1197775 Supplemental Name: Professional Stamp Requirement Drawings must be stamped by a Washington State licensed architect or engineer if the building is over 4,000sf. Please note that the entire building is included in the 4,000sf requirement, not just the tenant space involved.