Loading...
REVIEWED BLD2024-0227+Structural_Analysis_or_Calculations+2.15.2024_7.51.14_AM+4061293RECEIVED BLD2024-0227 Feb 21 2024 Cl OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT No, $ INVESTIGATIVE DESIGNER DATE --_---- Imc ENGINEERS, LLC CHECKED BY DATE 3605 C ST NE, AUBURN, WA. 98002 RESPONSIVE ACCURATE • THOROUGH 253.833.5557Co)/253.833.7309CF) CAUSE d ORIGIN DUE D/LIGENCE RESTORATION DESIGN EXPERT W/INESS ACC/DENT INVES7/GA7/ON SEISMI HAZARD ASSESSMENT STRUCTURAL CONSUL7A7/O1V STRUCTURAL CALCULATIONS CLIENT: GOLDEN COAST 1201 MONSTER ROAD SW SUITE 520 RENTON, WA. 98057 PROJECT: FIRDALE VILLAGE 11 TENANT IMPROVEMENT 9617 FIRDALE AVE EDMONDS, WA. STRUCTURAL BC INVESTIGATIVE ENGINEERS ENGINEER: 5605 C STREET NE AUBURN, WA. 98002 253.833.5557(o)/253.833.7903 (F) PROJECT NUMBER: 21004-01 LOCATION/JURISDICTION: CITY OF EDMONDS CODE: 2018 IBC/IEBC LOADS: I. LATERAL LOADS: WIND: SEISMIC: II. VERTICAL LOADS: SNOW, GROUND FLOOR, LIVE REVIEWED BY CITY OF EDMONDS 110 MPH @ 3-SECOND GUST B PER LOCAL TOPO I KZT -122.362 LONG 47.778 LAT 1.261 SS 0.496 SI 30 PSF 100 PSF III. SOILS 2,000 PSF, ASSUMED AS ALLOWED BY CODE WIND GOVERNS BY INSPECTION BASED ON LOCATION (SS AND SI) SEE PREVIOUS SUBMITTAL AND PERMIT BLD2022-1181 CHANGE FOR NEW STAIRS TO LOWER LEVEL TENANT TO OCCUPY ENTIRE BUILDING t, E�( i r � lS5 51v Project Title: INVESTIGATIVE Engineer: BCENGINEERS, Project ID: LLC Project Descr: R F S P n N S I V F • A C C I I R A T E • T H n R n Wood Beam Project File: Calcs for Full Rebuild (21004).ec6 LIc# KW-06014804, Build:20.23.08 30 BC Investigative Engineers (c) ENERCALC INC 1983-2023 DESCRIPTION: [PFTH] CODE REFERENCES Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties Analysis Method : Allowable Stress Design Fb + 975 psi E : Modulus of Elasticity Load Combination IBC 2018 Fb - 975 psi Ebend- xx 1500ksi Fc - Prl; 1350 psi Eminbend - xx 550ksi Wood Species Hem -Fir Fc - Perp 405 psi Wood Grade No.1 Fv 150 psi Ft 625 psi Density 26 84pcf Beam Bracing : Beam is Fully Braced against lateral -torsional buckling D(0.04�(0�3� 2-2x12 Span = 4.0 ft J Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.0450, L = 0.30 , Tributary Width = 1.0 ft, ([PFTS]) DESIGN SUMMARY MEN=• Maximum Bending Stress Ratio = 0.134 1 Maximum Shear Stress Ratio = 0.109 : 1 Section used for this span 2-2x12 Section used for this span 2-2x12 fb: Actual = 130.84psi fv: Actual = 16.34 psi F'b = 975.00psi F'v = 150.00 psi Load Combination +D+L Load Combination +D+L Location of maximum on span = 2 000ft Location of maximum on span = 3.066ft Span # where maximum occurs = Span # 1 Span # where maximum occurs = Span # 1 Maximum Deflection Max Downward Transient Deflection 0.003 in Ratio = 14745> 480 Span: 1 : L Only Max Upward Transient Deflection 0 in Ratio = 0 <480 n/a Max Downward Total Deflection 0.004 in Ratio = 12822 > 360 Span: 1 : +D+L Max Upward Total Deflection 0 in Ratio = 0 <360 n/a Maximum Forces & Stresses for Load Combinations Load Combination ax Stress Ratios 3hearValues Segment Length Span # M V CD CM Ct CLx CF Cfu C i C, M fb F'b V fv F'v D Only 0.0 0.00 0.0 0.0 Length = 4 0 ft 1 0.019 0.016 0.90 1.00 1.00 1.00 1.000 1.00 1.00 1.00 0.09 17.1 877.5 0.05 2.1 135.0 +D+L 1.00 1.00 1.00 1.000 1.00 1.00 1.00 0.0 0.00 0.0 0.0 Length = 4.0 ft 1 0 134 0 109 1.00 1.00 1.00 1.00 1.000 1 00 1.00 1.00 0.69 130.8 975.0 0.37 16.3 1500 +D+0.750L 1.00 1.00 1.00 1.000 1 00 1.00 1 00 0.0 0.00 0.0 00 Length = 4.0 ft 1 0.084 0.068 1.25 1.00 1.00 1.00 1.000 1.00 1.00 1.00 054 102.4 1,218.8 0.29 12.8 187.5 +0.60D 1.00 1.00 1.00 1.000 1.00 1.00 1.00 0.0 0.00 00 0.0 Length = 4.0 ft 1 0.007 0.005 1.60 1.00 1.00 1-00 1.000 1.00 1.00 1.00 0.05 10.2 1,560.0 0.03 1.3 240.0 Project Title: Engineer: INVESTIGATIVE Project ID: Bc ENGINEERS, LLC Project Descr: R FS Pn N S I V F • AC C II RA TF • TH 0n a ui,, Wood Beam LIC# : KW-06614804, Build 26.23.D8.30 DESCRIPTION: [PFTH] Overall Maximum Deflections Load Combination Span +D+L 1 Vertical Reactions _ Load Combination -N ax Upward from all— o�Conditions Max Upward from Load Combinations Max Upward from Load Cases D Only +D+L +D+0.750L +0.60D L Only BC Investigative Engineers Project File: Calcs for Full Rebuild (21004).ec6 (c) ENERCALC INC 1983-2023 Max. "-" Defl Location in Span Load Combination 0.0037 2.015 Support notation : Far left is #1 Support 1 Support 2 0.690 0.690 0.690 0.690 0.600 0.600 0.090 0.090 0.690 0.690 0 540 0.540 0.054 0.054 0.600 0.600 Max. "+" Defl Location in Span 0.0000 0.000 Values in KIPS Project Title: En CHINVESTIGATIVE Poe tineeID: ICENGINEERS, LLC Project Descr: R E S P n N S I V F • A C C I I R A T E • T H 0 R 0 11 G H Wood Beam LIC# . KW-06014804. Build 20 23 08.30 BC Investigative Engineers DESCRIPTION: [STS] Project File: Calcs for Full Rebuild (21004).ec6 (c) ENERCALC INC 1983-2023 CODE REFERENCES Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties Analysis Method : Allowable Stress Design Fb + 2600 psi E: Modulus of Elasticity Load Combination IBC 2018 Fb - 2600 psi Ebend- xx 2000ksi Fc - Prll 2510 psi Eminbend - xx 1016.535ksi Wood Species iLevel Truss Joist Fc - Perp 750 psi Wood Grade MicroLam LVL 2.0 E Fv 285 psi Ft 1555 psi Density 42 01 pcf Beam Bracing Beam is Fully Braced against lateral -torsional buckling D(0.03) L0.2) 1 75x5.5 1.75x5.5 Span =7.0ft Span = 6.50 ft Applied Loads Service loads entered. Load Factors will be applied for calculations Beam self weight NOT internally calculated and added Load for Span Number 1 Uniform Load : D = 0.0150, L = 0.10 ksf, Tributary Width = 2.0 ft, (STAIRS) Load for Span Number 2 Uniform Load : D = 0.0150, L = 0.10 ksf, Tributary Width = 2.0 ft, (STAIRS) DESIGN SUMMARY ' ' • Maximum Bending Stress Ratio = 0.6191 Maximum Shear Stress Ratio = 0.489 : 1 Section used for this span 1.75x5.5 Section used for this span 1.75x5.5 fb: Actual = 1,788.95psi fv: Actual = 139.32 psi F'b = 2,891.03psi F'v = 285.00 psi Load Combination +D+L Load Combination +D+L Location of maximum on span = 7.000ft Location of maximum on span = 6.570ft Span # where maximum occurs = Span # 1 Span # where maximum occurs = Span # 1 Maximum Deflection Max Downward Transient Deflection 0.102 in Ratio = 824 > 360 Span: 2: L Only Max Upward Transient Deflection 0 in Ratio = 0 <360 n/a Max Downward Total Deflection 0.117 in Ratio = 716 > 240 Span: 2: +D+L Max Upward Total Deflection -0.001 in Ratio = 95584 -240 Span: 2: +D+L Maximum Forces & Stresses for Load Combinations Load Combination ax ress Ratios _ Moment a u� el s Shear Values Segment Length Span # M V CD CM Ct CLx CI: Cfu C; C r M fb F'b V fv F'v D Only 00 0.00 0.0 0.0 Length = 7.0 ft 1 0.090 0.071 0.90 1.00 1 00 1.00 1.112 1.00 1.00 1.00 017 233.3 2,601.9 0.12 182 256.5 Length = 6.50 ft 2 0.090 0.071 0.90 1.00 1 00 1.00 1.112 1.00 1.00 1.00 0.17 233.3 2,601.9 011 18.2 256.5 +D+L 1.00 1.00 1 00 1 112 1.00 1.00 1.00 0.0 000 0.0 0.0 Length = 7.0 ft 1 0.619 0.489 1.00 1.00 1.00 1.00 1.112 1 00 1.00 1.00 1.32 1,788.9 2,891.0 0.89 139.3 285.0 Length = 6.50 ft 2 0.619 0 489 1 00 1.00 1.00 1.00 1.112 1.00 1.00 1 00 1.32 1,788.9 2,891 0 0.85 139.3 285.0 +D+0.750L 1.00 1.00 1 00 1.112 1.00 1.00 1.00 00 0.00 0.0 0.0 Length = 7 0 ft 1 0.387 0.306 1 25 1.00 1.00 1.00 1 112 1.00 1.00 1.00 1 03 1,400.0 3,613.8 0.70 109.0 356.3 Project Title: BCINVESTIGATIVE Proe tID: ENGINEERS, LLC Project Descr: R F S P 0 N S I V F • A C C I I R A T F • T H 0 R 0 11 C H Wood Beam LIC# . Kw-06o14804, 8uild:20.23.08.30 DESCRIPTION: [STS] Project File: Calcs for Full Rebuild (21004).ec6 BC Investigative Engineers (c) ENERCALC INC 1983.2023 Maximum Forces & Stresses for Load Combinations Load Combination Max ress a ios Moment Values ear V aV-hies Segment Length Span # M V CD CM Ct CLx CF Cfu C i C r M fb F'b V fv, F'v Length = 6.50 ft 2 0.387 0.306 1.25 1.00 1.00 1.00 1 112 1.00 1.00 1 00 1.03 1,400.0 3,613.8 0.66 109.0 356.3 +0.60D 1.00 1.00 1.00 1 112 1.00 1.00 1.00 0.0 000 0.0 0.0 Length = 7.0 ft 1 0.030 0.024 1.60 1 00 1 00 1.00 1 112 1.00 1 00 1.00 0.10 140.0 4,625.6 0.07 10.9 456.0 Length = 6.50 ft 2 0.030 0.024 1 60 1.00 1.00 1.00 1 112 1.00 1.00 1.00 0.10 140.0 4,6256 0.07 10.9 456.0 Overall Maximum Deflections Load Combination Span Max. "" Defl Location in Span Load Combination +D+L 1 0.1172 3.050 +D+L 2 0.0704 3.849 +D+L Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 Support 3 Max Upward from all Loa on itions 0.617 1.943 0.545 Max Upward from Load Combinations 0.617 1.943 0.545 Max Upward from Load Cases 0.537 1.689 0.474 D Only 0.080 0.253 0.071 +D+L 0.617 1.943 0.545 +D+O 750L 0.483 1.520 0.427 +0.60D 0.048 0.152 0 043 L Only 0.537 1.689 0 474 Max. "+" Defl Location in Span 0.0000 0.000 -0.0008 0.182 Values in KIPS Project Title: Engineer: INVESTIGATIVE Project ID: BCENGINEERS, LLC Project Descr RF 9 PO N S I VF • AC C IJ RA TF • TH 0 R0IIG H Point Load on Slab LIC# . KW-06014804, 961id•20.23 08.30 DESCRIPTION: [STS] Code References Calculations per IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 Analytical Values d - Slab Thickness 3.50 in FS - Req'd Factor of Safety 3.0 : 1 Analysis Formulas Project File: Calcs for Full Rebuild (21004).ec6 BC Investigative Engineers (c) ENERCALC INC 1983-2023 Ks - Soil Modulus of Subgrade Reac 50.0 pci Ec - Concrete Elastic Modulus 2,850.0 ksi fc - Concrete Compressive Strength 2.50 ksi ) - Poisson's Ratio 0.150 Min. Adjacent Load Distance 32.047 in Pn = 1.72 [ (Ks R1 I Ec) 10,000 + 3.6] Fr d' Min Adjacent Column Distance =1.5 * ([ Ec d A 3 I (12 * ( 1- u^2) Ks ] "' Ks = Soil modulus of subgrade reaction Ec = Concrete elastic modulus R1 = 50% plate average dimension = sgrt( PIWid * PILe d - Slab Thickness Ec = Concrete elastic modulus u - Poisson's ratio Fr - Concrete modulus of rupture = 7.5 * sgrt( fc) Ks = Soil modulus of subgrade reaction d - Slab Thickness Load & Capacity Table Plate (in) R1 Applied Concentrated Load on Plate • (kip) Governing Pu Pin Load ID Wid Len (in) D Lr L S W E Ld Comb (kip) (kip) Check [STS] 3.50 6.00 2.29 0.25 1.69 +D+L 1.9 31.6 Pass, FS=16.30 — 3