Dear April
A letter of approval has been provided for you to give the City of Edmonds.
In addition, we request that the contractor provide protection for the hallway carpets
during the remodel. With the remodel beginning so soon after the walkways are coated, we
ask they be vigilant to avoid damage since the "cure" time is weather dependent. Have
them notify Harley ASAP if there are any issues.
Also, with limited space in the alley and parking area, we request that the contractor
prioritize the bathroom plumbing to limit the time that a sani-can is located on the property.
We have several units that will be going up for sale which may involve move -in or move -out
situations, competing for space, and aesthetics. Plus, coordinating with garbage and
recycling pickup when refreshing or moving the sani-can creates extra work for Board
members. The preferred place for the sani-can would be the space currently occupied by
the recycling bin.
Please inform the Property Manager and Board before large trucks or deliveries occur so
that we may coordinate with the HOA. Other owners may have scheduled deliveries as
welt. We realize you will need to live off -site during the remodel, but we prefer you to be
here for large deliveries/pickups for the above reasons. If a truck is blocking access, please
have someone stationed by the truck so it can be moved, if necessary, per our R&R's.
If glass panels on the deck can be removed safely, you may use your deck for some
deliveries or demo. Any damage to panels or the deck will be at your expense. Please
observe height limits for trucks that go beyond the portico.
The owner is responsible for installing and removal of elevator pads as needed.
Please provide a copy of the Construction Guidelines for your contractor's information,
post permits and send copies after inspections are complete for our files. Since some
plumbing will be relocated, we would also like to keep drawings in our files for future
reference.
Thankyou,
Edmonds Camelot HOA Board
June 24, 2024
City of Edmonds
121 - 51h Ave. N.
Edmonds, WA 98020
Attn: Planning Department
Re: Unit 206, Edmonds Camelot Condominium
510 Forsyth Lane, Edmonds WA 98020
To whom it may concern,
April Cook, the owner of Unit 206, has requested permission for a full-scale remodel of her unit.
The HOA Board has approved this remodel, with the final determinations to be made by the City of
Edmonds where structure and codes are concerned.
Her request is as follows:
• Remove load bearing wall and post between kitchen and living room. Add post and support
beam per request by Architect and Sideway Engineers. Further documents can be provided
by the owner. (Drawings provided by owner).
• Install new counters, sink, disposal, countertops and cabinetry in kitchen. Plumbing and
electrical will be relocated and updated as required. New power plugs for microwave and
island wilt be added.
• The bathroom will be gutted. New fixtures and cabinetry to be added or relocated per
request. Plumbing and electrical will be updated as required.
• Twelve can lights with switches to be installed in the living room.
• Install electric heating in floors. All floors will be removed and replaced with hardwood
flooring. We have made this concession to our Construction Guidelines since there are no
units on either side or beneath that would cause concern for noise.
• New doors, trim, and baseboards throughout.
• Due to the extensive remodel, the HOA requests the contractor install a water shut-off valve
for the entire unit, if possible, to limit water shut-off to the entire building.
Sincerely,
Marge Johnson, President
Edmonds Camelot HOA