REVIEWED BLD2024-1204+Structural_Analysis_or_Calculations+8.29.2024_5.50.21_PM+4471999RECEIVED
Sep 12 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Prepared By:
BLD2024-1204
REVIEWED
BY
CITY OF EDMONDS
Cook Residence
Remodel
Structural Calculations
510 Forsyth Lane, Unit 206
Edmonds, WA 98020
Snohomish County
Sidesway Project No. 23014.01
SIDE5 WAY
ENGINEERING
I
Cook Residence Remodel
June 7, 2023
Project No. 23014.01
Project Description
Sidesway Engineering was retained by the homeowner of Unit 206 at The Camelot condominiums to
perform analysis and design as necessary to obtain a building permit for the interior remodel at 510
Forsyth Lane in Edmonds.
The remodel work will remove a bearing wall separating the kitchen from the living room and replace it
with a beam spanning between the remaining interior wall to the exterior wall of the unit. The support
columns will be continued down to the existing foundation in the basement below.
A small portion of the original construction documents for the building were provided to us for use.
Additionally we visited the site once a portion of the ceiling had been removed to confirm the existing
framing systems.
Scope of Work
Provide gravity calculations for the proposed remodel as required to obtain a building permit. Provide
framing plans and details as necessary for permit issuance. The lateral system of the structure is not
changing therefore a lateral analysis was excluded from our scope of work.
Design Criteria
2018 International Building Code (IBC)
2018 International Existing Building Code (IEBC)
ASCE 7-16 Minimum Design Loads for Buildings and Other Structures
Applicable Material Reference Standards (ACI, AISC, NDS)
This is a Risk Category II structure designed for the following loads:
Dead Loads
Live Loads
Project Summary
12psf (roof)
25psf (floors)
25psf (snow)
40psf (residential)
The proposed remodel work as designed in the following calculations conforms to the 2018 IBC and IEBC.
Refer to the construction drawings as well as the following calculations for structural framing
requirements.
Disclaimer
This calculation package is based on the documentation that was available to us. Sidesway Engineering
did not perform a complete as -built to verify the accuracy of all the provided data and we should be
contacted if there are any discrepancies with the assumptions contained within these calculations. We
assume the structure has no known deterioration or unknown damage that would adversely affect
capacity.
20305 871h Avenue W.
SIDE5WAY Edmonds, WA 98026
(425)673-4160
E NG I NE E R I I,G
P00% pod�G���Y
F0 -d
P
3
Z,o
I��G�G-GC-�
(.
1s1-rsoti►
�. c>
bv
66, %srJrs
3.
zsc 1,3
�= z s F
c,JcS 64-,)B 2•z
iJ tom- L yr15 µGAT ;Pd 0. 7r
GG/ •� L.Z
D.K $
=7'?SF 3�s�_rloo� ZsPsr°`-Fk�P�rG
Veer- w0-GC
{��: 2�1, � '� �lZ�Sr D�'F ZS�'S� hG/ t ��� • lam,
34r.9r5r (GG>u e��)
Z 7-
W
5�W �
�SZSacc yr',f0�`1li'Fac�C�
30P�'.ot.,s; ►3 zX i� c�FG�g "��r/�6 �� �6 �� ��y,u
Z . i. k r6 i QF(-(,t3 -o. 1 b = �l �z1-
3. 3i0 xrto,��c Psi =
= Z 05r t, 4-1OP-5 F LC-
�R%�PaSC-� �fw
�l l�C.. G�—C!�C.�.L�� r LL•f1T'i�Cl�rfRJ
/—'T/ Z 1263 lLc
Z• Z91 h2
Description ( By Project No.
Date
5I DE WAY Project �D4 Checked Sheet No.
ENGINEERING Date I
v�-tSZszG�f- rv�rS�
fgVA nGpra
�? 7" zz �' t. �z
I t 5 Cs qK6 Dfl�Z
LoA
�y
b-5.5 -Fz
W
M
i z
L
w?�.zVL--r����--0
Z. 2 L 2
�� r o. �iS• 3 • l�
n - U/ ' ffiS� ��— Z) = C7 ^�. O.N �KZ 60Fs�: CS tD
OM
l
�5 F�-f G— A-D& Q ,,A TC— � FT 604D
Description By Project No.
i
DatesIQZ3
I D E WAY Project fl� Checked Sheet No.
ENGINEERING Date